14.10.2014 Views

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T-5 Extended Detention Basin (EDB)<br />

Figure EDB-1. Flared Wall Outlet Structure Configuration. Graphic by Adia Davis.<br />

Figure EDB-2. Parallel Wall Outlet Structure Configuration. Graphic by Adia Davis.<br />

EDB-8 <strong>Urban</strong> <strong>Drainage</strong> and Flood Control District December 2010<br />

<strong>Urban</strong> Storm <strong>Drainage</strong> <strong>Criteria</strong> <strong>Manual</strong> <strong>Volume</strong> 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!