14.10.2014 Views

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T-1 Grass Buffer<br />

Design Example<br />

The UD-BMP workbook, designed as a tool for both designer and reviewing agency is available at<br />

www.udfcd.org. This section provides a completed design form from this workbook as an example.<br />

Design Procedure Form: Grass Buffer (GB)<br />

Designer:<br />

Company:<br />

Date:<br />

Project:<br />

Location:<br />

R. Dunn<br />

BMP, Inc.<br />

November 24, 2010<br />

Filing 37<br />

NE Corner of 34th Ave. and 105th St., north entrance road<br />

Sheet 1 of 1<br />

1. Design Discharge<br />

A) 2-Year Peak Flow Rate of <strong>the</strong> Area Draining to <strong>the</strong> Grass Buffer Q 2 = 5.0 cfs<br />

2. Minimum Width of Grass Buffer W G = 100 ft<br />

3. Length of Grass Buffer (14' or greater recommended) L G = 15 ft<br />

4. Buffer Slope (in <strong>the</strong> direction of flow, not to exceed 0.1 ft / ft) S G = 0.100 ft / ft<br />

5. Flow Characteristics (sheet or concentrated)<br />

A) Does runoff flow into <strong>the</strong> grass buffer across <strong>the</strong><br />

<strong>entire</strong> width of <strong>the</strong> buffer?<br />

Choose One<br />

Yes<br />

No<br />

B) Watershed Flow Length F L = 20 ft<br />

C) Interface Slope (normal to flow) S I = 0.020 ft / ft<br />

D) Type of Flow SHEET FLOW<br />

Sheet Flow: F L * S I < 1<br />

Concentrated Flow: F L * S I > 1<br />

6. Flow Distribution for Concentrated Flows<br />

Choose One<br />

None (sheet flow)<br />

Slotted Curbing<br />

Level Spreader<br />

O<strong>the</strong>r (Explain):<br />

7 Soil Preparation<br />

(Describe soil amendment)<br />

Till 5 CY of compost per 1000 SF to a depth of 6 inches.<br />

8 Vegetation (Check <strong>the</strong> type used or describe "O<strong>the</strong>r")<br />

Choose One<br />

Existing Xeric Turf Grass<br />

Irrigated Turf Grass<br />

O<strong>the</strong>r (Explain):<br />

9. Irrigation<br />

(*Select None if existing buffer area has 80% vegetation<br />

AND will not be disturbed during construction.)<br />

10. Outflow Collection (Check <strong>the</strong> type used or describe "O<strong>the</strong>r")<br />

Choose One<br />

Temporary<br />

Permanent<br />

None*<br />

Choose One<br />

Grass Swale<br />

Street Gutter<br />

Storm Sewer Inlet<br />

O<strong>the</strong>r (Explain):<br />

Notes:<br />

GB-8 <strong>Urban</strong> <strong>Drainage</strong> and Flood Control District November 2010<br />

<strong>Urban</strong> Storm <strong>Drainage</strong> <strong>Criteria</strong> <strong>Manual</strong> <strong>Volume</strong> 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!