13.10.2014 Views

DUCTAL - Iowa State University

DUCTAL - Iowa State University

DUCTAL - Iowa State University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Wapello County, <strong>Iowa</strong> UHPC<br />

“<strong>DUCTAL</strong>” Bridge<br />

2005 Better Concrete Conference<br />

November 3 rd , 2005<br />

<strong>Iowa</strong> <strong>State</strong> <strong>University</strong><br />

Presented by:<br />

Brian P. Moore, PE - Wapello County Engineer


What is <strong>DUCTAL</strong>?<br />

• High performance cement based material with metallic or<br />

organic fibers.<br />

• Made of silica fumes (glass), cement, fine sand, water,<br />

superplasticizer, and fibers.<br />

• Fluid and self-placing.<br />

• Compressive strength = 23-33 ksi.<br />

• Flexural strength = 4-7 ksi.<br />

• Highly ductile with low (zero) permeability.<br />

• No need for reinforcing steel.


Normal Concrete<br />

<strong>DUCTAL</strong>


Project Development<br />

• Spring 2003 – Wapello County is awarded $300,000 through the TEA-21<br />

Innovative Bridge Construction Program (IBRC) to demonstrate the use of<br />

UHPC (<strong>DUCTAL</strong>).<br />

• 8/12/03 – UHPC Design Seminar held in Ames, <strong>Iowa</strong>.<br />

• 4/12/04 – <strong>DUCTAL</strong> test batches completed at local precast plants interested<br />

in becoming “prequalified”.<br />

• 8/03/04 – Proposals sent to fabricate 1-71’ long prestressed test beam,<br />

several small shear test beams and 3-110’ long prestressed beams made of<br />

<strong>DUCTAL</strong>.<br />

• 10/26/04 – Wapello County accepts proposal from Lafarge, Winnipeg and<br />

enters into 2 phase contract to construct test beams and bridge beams.<br />

• 2/23/05 – Casting of 71’ long test beam completed.


Project Development<br />

• 5/12/05 – Flexure testing of 71’ test beam completed at ISU.<br />

• 6/9/05 – Ultimate Shear Capacity of 71’ test beam completed at ISU.<br />

• 6/21/05 – Public letting for construction of bridge in Wapello County.<br />

Contract awarded to Bloomfield Bridge and Culvert of Bloomfield, <strong>Iowa</strong> who<br />

was the low bidder.<br />

• 6/25/05, 7/9/05, 7/16/05 – Casting of 110’ bridge beams completed at<br />

Lafarge, Winnipeg.<br />

• 8/17/05 - Construction begins on the first <strong>DUCTAL</strong> bridge in North America.<br />

• 9/30/05 – 110’ <strong>DUCTAL</strong> beams arrive to job site from Winnipeg.<br />

• Two year evaluation of finished bridge after construction.


<strong>DUCTAL</strong> Beam Design<br />

Modified <strong>Iowa</strong> 45-inch Bulb Tee Section<br />

1” from top flange<br />

2” from bottom flange<br />

2” from web<br />

49 – 0.6” Dia. strands


<strong>DUCTAL</strong> Beam Design


Bridge Location


Bridge Site


Bridge Design<br />

• 24’-6” roadway width.<br />

• 110 foot simple span.<br />

• 3 beam cross section. Modified <strong>Iowa</strong> 45-inch<br />

Bulb Tee pre-stressed beams made of <strong>DUCTAL</strong>.<br />

• Integral abutments and a conventional 8” castin-place<br />

concrete deck.<br />

• Open style concrete rail.


Research Objectives<br />

• Advance concrete bridge construction technology.<br />

• Develop experience in <strong>Iowa</strong> in the design and<br />

construction of bridges using UHPC.<br />

• Evaluate the long-term performance of the nation’s first<br />

UHPC bridge.<br />

• Develop recommended design procedures for shear<br />

design of UHPC beams with potential adoption by<br />

AASHTO.<br />

• Examine the potential use of UHPC.


Flexure Test


Flexure Test


Flexure Test Results<br />

• First cracks expected in range of 240-280<br />

kips.<br />

• First cracks appear @ 256 kips.<br />

• Total load of 264 kips applied with 3.25<br />

inch of deflection.


Shear Test


Shear Test


Shear Test Results<br />

• Estimated Failure @ 750 Kips<br />

• Failed @ 640 Kips with 5 inch deflection


110’ <strong>DUCTAL</strong> Beam


110’ <strong>DUCTAL</strong> Beam


Construction


Construction


Questions?<br />

PROJECT PICTURES AND INFORMATION<br />

www.wapellocounty.org/roads/marshill.htm<br />

• Brian P. Moore, PE<br />

Wapello County Engineer<br />

bmoore@pcsia.net<br />

• Dean Bierwagen, PE<br />

Methods Engineer, IDOT<br />

Dean.Bierwagen@dot.state.ia.us<br />

• Brent Phares, PE<br />

Associate Director, Bridge Engineering Center<br />

<strong>Iowa</strong> <strong>State</strong> <strong>University</strong><br />

bphares@iastate.edu

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!