13.10.2014 Views

NZ4202 - Unitec

NZ4202 - Unitec

NZ4202 - Unitec

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SNZ NZS*4202 95 8583Lbï 0042464 661 =<br />

Issued June 1995 NZS 4202: 1 995<br />

NEW ZEALAND STANDARD<br />

STANDARD METHOD OF<br />

MEASUREMENT OF BUILDING WORKS<br />

SECTION O - GENERAL RULES<br />

0.1 SCOPE<br />

0.1.1<br />

The purpose of this Standard Method of Measurement is to proide a uniform basis<br />

forthe measurement of building worksand forthe presentationof unitsof measurement<br />

in Schedules (Bills) of Quantities and as such the method embodies the essentials<br />

of good practice.<br />

--`,,``,,,,,,``,``,`,,,`,,,`,-`-`,,`,,`,`,,`---<br />

0.1.2<br />

The quantity surveyor is expected to use discretion and to adopt appropriate<br />

methods, provided the principles of measurement specified in this Standard Method<br />

of Measurement are observed and the information necessary for pricing made clear.<br />

Where such discretion has been exercised this shall be stated clearly within the<br />

relevant item or group of items.<br />

0.2 INTERPRETATION<br />

0.2.1<br />

For the purposes of interpretation of the Standard the provisions of section O take<br />

precedence over the relevant provisions of sections 1 to 38 inclusive, unless<br />

otherwise specified or stated.<br />

0.3 APPLICATION<br />

0.3.1<br />

This Standard is not intended for use on works principally of a civil engineering<br />

nature. In such cases use is recommended of NZS 4224 Code of practice for<br />

measurement of civil engineering quantities.<br />

0.3.2<br />

The provisions of this Standard shall be applicable equally to the preparation of<br />

schedules (bills) of quantities before work is commenced and to the measurement<br />

of finished work.<br />

0.4 SCHEDULE (BILL) OF QUANTITIES<br />

0.4.1<br />

The Schedule (Bill) of Quantities shall describe the work to be executed: reference<br />

shall be made to the drawings and specifications for the quality of materials and<br />

workmanship. Works which by their nature cannot be accurately measured shall be<br />

described as ?provisional item? or ?provisional quantity? as the case may be.<br />

0.4.2<br />

Every item in the Schedule (Bill) of Quantities intended to be priced shall be identified<br />

in the unit column.<br />

0.4.3<br />

The quantities in the Schedule (Bill) of Quantities shall be rounded off to the nearest<br />

whole unit.<br />

0- 1<br />

Copyright Standards New Zealand<br />

Provided by IHS under license with SNZ<br />

Document provided by IHS Licensee=<strong>Unitec</strong> Inst of Technology/5911177001,<br />

03/02/2005 18:31:52 MST Questions or comments about this message: please call<br />

the Document Policy Group at 303-397-2295.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!