13.10.2014 Views

NZ4202 - Unitec

NZ4202 - Unitec

NZ4202 - Unitec

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SNZ NZS*4202 95 W 8583Lb9 0042490 753 W<br />

Issued June 1995 NZS 4202: 1 995<br />

--`,,``,,,,,,``,``,`,,,`,,,`,-`-`,,`,,`,`,,`---<br />

SECTION 8 - PRECAST CONCRETE<br />

8.1 OVERVIEW<br />

Refer to section O, General rules, which shall be read in conjunction with this section.<br />

8.2 PREAMBLES<br />

8.2.1 Rates to include<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

Formwork, moulds and casings;<br />

Lifting eyes, devices and frames where not detailed;<br />

Temporary supports where not detailed;<br />

Forming cambers where required.<br />

8.3 GENERAL PRINCIPLES<br />

8.3.1<br />

Precast concrete work shall be described and classified according to the function,<br />

shape and finish.<br />

8.3.2<br />

Taking delivery, hoisting, setting and fixing in position may be measured separately,<br />

and the method of scheduling this item shall be clearly stated. Fixing shall be<br />

described and classified according to position in the structure. The size and<br />

approximate mass shall be stated.<br />

8.3.3<br />

Each item shall be enumerated and shall include the detailed quantities, scheduled<br />

according to the appropriate sections of this Standard Method of Measurement<br />

unless otherwise stated.<br />

8.4 MEASUREMENT PROCEDURE<br />

8.4.1<br />

Where no definite lengths are stated, sills, copings and similar items shall be<br />

measured in metres.<br />

8.4.2<br />

Fixings, bolts or brackets, unless measured elsewhere, shall be enumerated.<br />

8.4.3<br />

Welding required for the fixing of precast units shall be measured in metres, or<br />

enumerated as appropriate.<br />

8.4.4<br />

Sealants, pointing, gaskets, damp-proofing and the like shall be measured separately.<br />

8.4.5<br />

Precast paving slabs and the like shall be measured in square metres stating the<br />

sizes of slabs (and the methods of bedding and jointing). Raking cutting shall be<br />

measured in metres.<br />

Copyright Standards New Zealand<br />

Provided by IHS under license with SNZ<br />

Document provided by IHS Licensee=<strong>Unitec</strong> Inst of Technology/5911177001,<br />

03/02/2005 18:31:52 MST Questions or comments about this message: please call<br />

the Document Policy Group at 303-397-2295.<br />

8- 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!