12.10.2014 Views

Vinci Construction - UBIFRANCE

Vinci Construction - UBIFRANCE

Vinci Construction - UBIFRANCE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OPTIMAL WATER WORKS SOLUTIONS<br />

MAITRISE GLOBALE DU CYCLE DE L’EAU<br />

International Water Works of VINCI<br />

HYDRAULIQUE INTERNATIONAL DU GROUPE VINCI<br />

SEMINAIRE SUR L’EAU FRANCE-MYANMAR OPERATION <strong>UBIFRANCE</strong><br />

21 et 22 MARS 2013


Présentation du groupe VINCI<br />

Introduction of VINCI Group<br />

HI STOI RES – HI STORY<br />

1878 Founded GIRAULT Unit<br />

1918 Merged with PONT-A-MOUSON Group and changed its name to Water and<br />

Environmental sanitation<br />

1961 Water and Environmental sanitation combined with SOCOMAN and changed<br />

its name to SOCEA<br />

1979 Combined with BALENCY-BRIARD BRIARD Company and changed its name to<br />

SOBEA.<br />

1986 SOBEA became SOGEA after combining with SGE-BTP, one of top ten<br />

greatest groups in construction.<br />

2000 SGE Group was completely independent and changed its name to VINCI<br />

Group.<br />

2001 VINCI Group combined with GTM Group and became the leader in<br />

construction and relative services..


Une entreprise multimétiers<br />

A multi-business enterprise<br />

Hydraulic<br />

Hydraulique :<br />

23%<br />

Stationnement<br />

et Services :<br />

2%<br />

Service<br />

Bâtiment : 50%<br />

Building<br />

<strong>Construction</strong><br />

Génie civil :<br />

25%


International Water works activitys


OTIMALE WATER WORKS SOLUTIONS


Station de traitement d’eau de Chengdu-Chine<br />

Chengdu Water treatment plant - China<br />

Built water treatment plant from river water with capacity of 400.000 m 3 /day


Station d’épuration de Colombes - France<br />

Colombes Wastewater treatment plant - France<br />

Designed and built wasterwater treatment plant with capacity of 240.000 m 3 /day for 800.000 population<br />

equivalent


STATION DE POMPAGE DES EAUX USEÉS S DE DOHA-QATAR<br />

WASTEWATER PUMPING PLANT IN DOHA-QATAR<br />

•Built wastewater pumping plant with capacity of 680.000 m 3 /hour and supplied, installed 45 km of<br />

pipelines.


PROJECT FOR ENVIRONMENTAL<br />

IMPROVEMENT IN<br />

HOI AN-QUANG NAM PROVINCE


CONCLUSIONS<br />

We will support all environment projects in Myanmar<br />

Apply advanced technology and processes to treat<br />

the water and wastewater<br />

VINCI CONSTRUCTION GRANDS PROJETS<br />

International Water Works<br />

5, cours Ferdinand de Lesseps<br />

F 92851 Rueil Malmaison Cedex<br />

Mobile +84 903 446 525<br />

Email: minh@vinci-construction.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!