Vinci Construction - UBIFRANCE
Vinci Construction - UBIFRANCE
Vinci Construction - UBIFRANCE
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
OPTIMAL WATER WORKS SOLUTIONS<br />
MAITRISE GLOBALE DU CYCLE DE L’EAU<br />
International Water Works of VINCI<br />
HYDRAULIQUE INTERNATIONAL DU GROUPE VINCI<br />
SEMINAIRE SUR L’EAU FRANCE-MYANMAR OPERATION <strong>UBIFRANCE</strong><br />
21 et 22 MARS 2013
Présentation du groupe VINCI<br />
Introduction of VINCI Group<br />
HI STOI RES – HI STORY<br />
1878 Founded GIRAULT Unit<br />
1918 Merged with PONT-A-MOUSON Group and changed its name to Water and<br />
Environmental sanitation<br />
1961 Water and Environmental sanitation combined with SOCOMAN and changed<br />
its name to SOCEA<br />
1979 Combined with BALENCY-BRIARD BRIARD Company and changed its name to<br />
SOBEA.<br />
1986 SOBEA became SOGEA after combining with SGE-BTP, one of top ten<br />
greatest groups in construction.<br />
2000 SGE Group was completely independent and changed its name to VINCI<br />
Group.<br />
2001 VINCI Group combined with GTM Group and became the leader in<br />
construction and relative services..
Une entreprise multimétiers<br />
A multi-business enterprise<br />
Hydraulic<br />
Hydraulique :<br />
23%<br />
Stationnement<br />
et Services :<br />
2%<br />
Service<br />
Bâtiment : 50%<br />
Building<br />
<strong>Construction</strong><br />
Génie civil :<br />
25%
International Water works activitys
OTIMALE WATER WORKS SOLUTIONS
Station de traitement d’eau de Chengdu-Chine<br />
Chengdu Water treatment plant - China<br />
Built water treatment plant from river water with capacity of 400.000 m 3 /day
Station d’épuration de Colombes - France<br />
Colombes Wastewater treatment plant - France<br />
Designed and built wasterwater treatment plant with capacity of 240.000 m 3 /day for 800.000 population<br />
equivalent
STATION DE POMPAGE DES EAUX USEÉS S DE DOHA-QATAR<br />
WASTEWATER PUMPING PLANT IN DOHA-QATAR<br />
•Built wastewater pumping plant with capacity of 680.000 m 3 /hour and supplied, installed 45 km of<br />
pipelines.
PROJECT FOR ENVIRONMENTAL<br />
IMPROVEMENT IN<br />
HOI AN-QUANG NAM PROVINCE
CONCLUSIONS<br />
We will support all environment projects in Myanmar<br />
Apply advanced technology and processes to treat<br />
the water and wastewater<br />
VINCI CONSTRUCTION GRANDS PROJETS<br />
International Water Works<br />
5, cours Ferdinand de Lesseps<br />
F 92851 Rueil Malmaison Cedex<br />
Mobile +84 903 446 525<br />
Email: minh@vinci-construction.com