Different types <strong>of</strong> disruptions require different types <strong>of</strong> responses and<br />
so the organization must consider building multiple response<br />
strategies into the overall contingency plan.<br />
9.1.1.5 Document the Plan<br />
Use the information derived in the foregoing steps to create a<br />
formally documented plan that can be distributed/made available to<br />
appropriate personnel in the event that a business disruption occurs:<br />
• Provide plan supporting information to provide background<br />
and context to make the plan easier to understand and<br />
implement.<br />
• Detail notification/activation phase in order to establish<br />
processes to be followed once a disruption appears imminent<br />
or has occurred.<br />
• Detail recovery phase in order to clearly indicate the measures<br />
that are to be taken to restore systems functionality and<br />
operations.<br />
• Detail reconstitution phase in order to establish a structured<br />
return to normal operations within the primary systems<br />
and/or facilities.<br />
9.1.2. Test the Plan<br />
To ensure the applicability <strong>of</strong> the plan and to verify that the plan can be acted<br />
upon as created, periodic testing is required:<br />
9.1.2.1 Define Testing Methodologies and Tests<br />
Plan testing is a critical component <strong>of</strong> contingency planning as it<br />
determines the viability <strong>of</strong> the plan and identifies any gaps that may<br />
exist in the plan:<br />
• Determine the capabilities to be included in the testing<br />
program.<br />
• Determine the manner in which testing shall be conducted.<br />
9.1.2.2 Execute Tests<br />
Completion <strong>of</strong> tests requires appropriate notification throughout the<br />
organization to ensure the test achieves its desired results:<br />
• Provide notice to test participants so that they can plan<br />
workload to ensure availability for the test.<br />
• Provide notice to business and IT operations staff in the event<br />
that the plan inadvertently impacts normal operations.<br />