10.10.2014 Views

Policy 7230A - Department of Administration

Policy 7230A - Department of Administration

Policy 7230A - Department of Administration

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Review responses to ensure the specification <strong>of</strong> the design<br />

and development process used in solution creation is<br />

provided.<br />

• Weight those responses that include the requested<br />

information positively and those that do not include the<br />

requested information negatively.<br />

12.1.2.3 Test and Validation Process<br />

To allow for independent testing and validation <strong>of</strong> vendor claims<br />

regarding the security capabilities <strong>of</strong> the solution, all acquisition<br />

document responses must specify the testing and validation<br />

methodology and process used during creation <strong>of</strong> the proposed<br />

system:<br />

• Review responses to ensure the specification <strong>of</strong> the test and<br />

validation methodology and process used in solution creation<br />

is provided.<br />

• Weight those responses that include the requested<br />

information positively and those that do not include the<br />

requested information negatively.<br />

12.1.2.4 Configuration and Operations Documents<br />

To allow for thorough independent review <strong>of</strong> all aspects <strong>of</strong> the<br />

requested solution, all acquisition document responses must include<br />

complete system documentation for the proposed system:<br />

• Review responses to ensure that specified solution<br />

documentation is included.<br />

• Weight those responses that include the requested<br />

information positively and those that do not include the<br />

requested information negatively.<br />

12.2. Maintain Records<br />

Agencies should capture documentation appropriate to all acquisition processes:<br />

• Maintain copies <strong>of</strong> all solicitation documents for future reference.<br />

• Maintain copies <strong>of</strong> all solicitation response documents for future reference.<br />

• Maintain copies <strong>of</strong> all independent verification documents for future<br />

reference.<br />

44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!