<strong>The</strong>re are specific requirements for homes to be included<br />
in a <strong>Group</strong> <strong>Repair</strong> <strong>Scheme</strong>:<br />
• Each scheme must include at least four adjoining<br />
dwellings (a terrace).<br />
• At least 5% of the homes must be in disrepair, this<br />
means that the work required to the external structure<br />
is beyond the scope of routine maintenance.<br />
• At least 5% of households to be included should be<br />
dependent on a qualifying state benefit.<br />
• Homes involved in the scheme should have a 0 year<br />
life span after completion.<br />
Before work can begin a number of issues must be resolved:<br />
• <strong>The</strong>re must be agreement from all participants for the<br />
work to take place.<br />
• <strong>Scheme</strong> costs will be determined through an external<br />
survey of each property with costs agreed in advance<br />
of commencement.<br />
• <strong>The</strong> estimated costs to the owner will be determined<br />
by the amount of works required.