THE<br />

GROUP<br />

REPAIR<br />

SCHEME


“<strong>The</strong> <strong>Group</strong> <strong>Repair</strong> <strong>Scheme</strong> is a very fine example of partnership<br />

working effectively and not only has the scheme improved homes<br />

and living conditions, but its unique nature has greatly enhanced the<br />

image of neighbourhoods across <strong>Northern</strong> <strong>Ireland</strong>.” Brian Rowntree,<br />

Chairman, <strong>Housing</strong> <strong>Executive</strong> at a <strong>Group</strong> <strong>Repair</strong> scheme in Castlederg.


<strong>The</strong> <strong>Northern</strong> <strong>Ireland</strong> <strong>Housing</strong> <strong>Executive</strong> carried out the<br />

first <strong>Group</strong> <strong>Repair</strong> <strong>Scheme</strong> to 4 homes in St James Road,<br />

Belfast in 995.<br />

Since then the <strong>Group</strong> <strong>Repair</strong> has been carried out to a<br />

further ,00 properties throughout <strong>Northern</strong> <strong>Ireland</strong> at<br />

a cost of over £4 million.<br />

<strong>The</strong> <strong>Group</strong> <strong>Repair</strong> <strong>Scheme</strong> enables the <strong>Housing</strong> <strong>Executive</strong><br />

to help landlords and owner occupiers improve the<br />

external fabric of terraced houses.<br />

Typically work includes the provision of new roofs and<br />

guttering, window and door replacement, and work to<br />

chimneys, walls and front and rear boundaries.<br />

We have developed <strong>Group</strong> <strong>Repair</strong> to assist rural and<br />

urban regeneration and encourage owners to follow-up<br />

the work with any necessary internal improvements.<br />

This booklet shows the improvements that can be made<br />

through the <strong>Group</strong> <strong>Repair</strong> <strong>Scheme</strong> and outlines how the<br />

scheme works.


Before <strong>Group</strong> <strong>Repair</strong>


After <strong>Group</strong> <strong>Repair</strong><br />

East Street, Donaghadee


Before <strong>Group</strong> <strong>Repair</strong>


After <strong>Group</strong> <strong>Repair</strong><br />

Glenville Road, Whiteabbey


<strong>The</strong>re are specific requirements for homes to be included<br />

in a <strong>Group</strong> <strong>Repair</strong> <strong>Scheme</strong>:<br />

• Each scheme must include at least four adjoining<br />

dwellings (a terrace).<br />

• At least 5% of the homes must be in disrepair, this<br />

means that the work required to the external structure<br />

is beyond the scope of routine maintenance.<br />

• At least 5% of households to be included should be<br />

dependent on a qualifying state benefit.<br />

• Homes involved in the scheme should have a 0 year<br />

life span after completion.<br />

Before work can begin a number of issues must be resolved:<br />

• <strong>The</strong>re must be agreement from all participants for the<br />

work to take place.<br />

• <strong>Scheme</strong> costs will be determined through an external<br />

survey of each property with costs agreed in advance<br />

of commencement.<br />

• <strong>The</strong> estimated costs to the owner will be determined<br />

by the amount of works required.


Before <strong>Group</strong> <strong>Repair</strong>


After <strong>Group</strong> <strong>Repair</strong><br />

Hesketh Park, Belfast


Before <strong>Group</strong> <strong>Repair</strong>


After <strong>Group</strong> <strong>Repair</strong><br />

St. Patrick’s Street, Draperstown


Before <strong>Group</strong> <strong>Repair</strong>


After <strong>Group</strong> <strong>Repair</strong><br />

Railway Terrace, Castlederg


<strong>The</strong> <strong>Housing</strong> <strong>Executive</strong> appoints an approved contractor<br />

to carry out the work. <strong>The</strong> scheme will be supervised by a<br />

technical offcer acting for the <strong>Housing</strong> <strong>Executive</strong> for the<br />

duration of the scheme.<br />

A Contract Administrator is responsible for surveying<br />

the properties, preparing proposals for each house,<br />

producing documents for contractors to price the work<br />

through competitive tendering and managing the<br />

contract on site.<br />

<strong>The</strong> Development Offcer will carry out the consultation<br />

with residents and liaise with them throughout the<br />

duration of the scheme.


Before <strong>Group</strong> <strong>Repair</strong>


After <strong>Group</strong> <strong>Repair</strong><br />

Sunnyside Street, Belfast


Before <strong>Group</strong> <strong>Repair</strong>


After <strong>Group</strong> <strong>Repair</strong><br />

York Drive, Belfast


<strong>The</strong> aim of <strong>Group</strong> <strong>Repair</strong>s is to improve the external fabric<br />

of private sector dwellings.<br />

Works may include:<br />

• Roof<br />

• <strong>Repair</strong> of brick work<br />

• Chimneys<br />

• External doors<br />

• Windows<br />

• Rain water goods<br />

• Rear yard walls<br />

• Garden fences<br />

• Walls and railings.<br />

<strong>The</strong> contractor will be appointed by the <strong>Housing</strong><br />

<strong>Executive</strong> following competitive tendering.<br />

<strong>The</strong> contractor will have a foreman on site during the<br />

time when the work is being carried out. He will act as the<br />

contractor’s representative on site.<br />

A Clerk of Works is employed by the <strong>Housing</strong> <strong>Executive</strong><br />

to assist the contract administrator in ensuring the<br />

contractor carries out work to the required standards.


Before <strong>Group</strong> <strong>Repair</strong><br />

, Catherine Street


After <strong>Group</strong> <strong>Repair</strong><br />

Red Row, Drumaness


Some comments from residents:<br />

“We are really pleased that our home is included in the<br />

<strong>Group</strong> <strong>Repair</strong> scheme… it’s an excellent scheme which<br />

will improve and add value to our home.”<br />

“Our homes and properties have been given a new lease<br />

of life and the whole town looks better than it has done<br />

for many years”.<br />

“This <strong>Group</strong> <strong>Repair</strong> scheme has brightened up these<br />

three particular terraces and given them a complete<br />

makeover”.<br />

Ann Blease, the <strong>Housing</strong> <strong>Executive</strong>’s <strong>Group</strong> <strong>Repair</strong> Manager:<br />

“As the regional housing authority for <strong>Northern</strong> <strong>Ireland</strong>,<br />

the <strong>Housing</strong> <strong>Executive</strong> has a responsibility to help<br />

bring about improvements to homes across all housing<br />

tenures. Initiatives such as private sector grants and the<br />

<strong>Group</strong> <strong>Repair</strong> scheme ensure that homeowners have<br />

the opportunity to maintain their properties to modern<br />

day standards. <strong>Group</strong> <strong>Repair</strong> particularly encourages<br />

neighbours to come together so that their homes can<br />

benefit from work at the same time.”


Before <strong>Group</strong> <strong>Repair</strong>


After <strong>Group</strong> <strong>Repair</strong><br />

Canal Street, Newry


Before <strong>Group</strong> <strong>Repair</strong>


After <strong>Group</strong> <strong>Repair</strong><br />

Glen Crescent, Belfast


Before <strong>Group</strong> <strong>Repair</strong>


After <strong>Group</strong> <strong>Repair</strong><br />

Church Street, Downpatrick


Before <strong>Group</strong> <strong>Repair</strong>


After <strong>Group</strong> <strong>Repair</strong><br />

Portallo Street, Belfast


THE<br />

GROUP<br />

REPAIR<br />

SCHEME<br />

For further information on the scheme<br />

contact the <strong>Group</strong> <strong>Repair</strong> Unit at<br />

044 90 900<br />

www.nihe.gov.uk<br />

October 00