Road Infrastructure<br />

Under the infrastructure program, over<br />

K7.5 million for emergency repairs,<br />

maintenance and upgrade of the Lae –<br />

Bulolo highway has been spent, with an<br />

additional K400, 000 provided to develop<br />

the Wandumi access road linking Wau<br />

and Bulolo, as a restricted alternate<br />

route.<br />

Health and Education Infrastructure<br />

The company’s contribution towards<br />

capacity building doesn’t stop there.<br />

A substantively funded and ongoing<br />

education program for Hidden Valley<br />

and Wafi children has been expanded to<br />

cover most Watut communities.<br />

This has seen more than K1.7 million<br />

spent on education subsidies, providing<br />

better access to educational opportunity.<br />

The program also funds education<br />

infrastructure, teaching aids and teacher<br />

training.<br />

An aid post, elementary classrooms<br />

and community hall each in the three<br />

landowner villages of Nauti, Winima and<br />

Kwembu have been completed, at a cost<br />

of K1.5 million. The construction and<br />

fitting out of the Babuaf clinic in the Lower<br />

Watut area at a cost of K191, 000. The<br />

clinic will serve 10 villages. Construction<br />

of 8 school buildings (double highset<br />

classrooms) and three teacher’s houses<br />

at locations in Wau, Baiyune, Bulolo and<br />

at selected locations along the highway is<br />

progressing with 4 of the building already<br />

completed. Projects are in line with the<br />

Clean water supplies, more reliable than<br />

seasonal river flows, is brought right to<br />

community door steps.<br />

Provincial Department of Education<br />

planned priorities for school infrastructure,<br />

through its SLIP Program.<br />

Water Supplies<br />

For many communities who face long<br />

daily walks to access fresh water supplies,<br />

more than K2.1 million has been spent<br />

on providing clean, reliable village water<br />

installations. The water supply program is<br />

accompanied by sessions of health and<br />

sanitation awareness.<br />

This program will improve life and<br />

community health in up to 40 villages<br />

throughout the Watut River region.<br />

The people of Golden Pine, Winima, Manki<br />

1, Manki 2, Kuembu 1, Kuembu 2 , and<br />

Society in the Upper Watut are already<br />

enjoying the benefits of clean fresh water,<br />

while progress on awareness, feasibility,<br />

soliciting village commitment to ensure<br />

ownership, and the ordering and delivery<br />

of materials are being progressed for the<br />

remaining villages of Kuembu 3, Nauti,<br />

Latep, and Leklu. All 13 villages in the<br />

Lower Watut are already enjoying the<br />

benefits of clean fresh water while in<br />

Middle Watut pre-feasibility studies are<br />

still progressing for Vidipos, Baiyune,<br />

Samsam (Pelengkua), Sambio (old &<br />

new), Galawo, Taiak, Gawapu, Bangalum,<br />

Biamena, Dambi, Kapin, Nayakes and<br />

Piu in the Middle Watut.<br />

Agriculture/Aquaculture Programs<br />

Along with clean water goes improved<br />

nutrition, and also addressed are<br />

agriculture and fish farming.<br />

Training is aimed at complementing the<br />

skills of the village people who depend<br />

on their land. More than K130,000 has<br />

already been spent on basic husbandry<br />

and Start Your Business trainings and<br />

extension services, with a further K130,<br />

For more information Contact: Media & Communications Manager Tel: + 675<br />

472 1703 or visit our website at www.morobejv.com<br />

July 2011<br />

41 fish farmers from Sambio village in the Middle Watut who successfully completed a<br />

Business Management training in July conducted by Small Business <strong>Development</strong> Corporation.<br />

000 spent to date on cocoa farming in<br />

the Lower Watut region and K230,143<br />

on fish farmer training, pond construction<br />

and stocking. Three fish farmer trainings<br />

for Lower Watut and 2 for Middle Watut<br />

have been completed while four model<br />

fish pond construction and stocking has<br />

been completed at four villages in Lower<br />

Watut which are Mafanazo, Magaring,<br />

Malasap, and Kisi-Ono. Fish are thriving<br />

in the ponds, and adding a new source of<br />

nutrition and family income.<br />

In an area where alluvial mining follows<br />

the rich history of gold production from<br />

the sands of the rivers of Wau and<br />

Bulolo, more than K16, 000 has been<br />

spent to send selected landowners and<br />

community representatives to the Wau<br />

small scale school of alluvial mining.<br />

This practical program was initiated by<br />

the Mineral Resources Authority and the<br />

European Union with the sponsorship<br />

commitment of Hidden Valley, to improve<br />

techniques and yields for small scale<br />

miners.<br />

Quick Facts<br />

• Up to forty villages spanning<br />

the Upper and Mid to Lower<br />

Watut areas will benefit<br />

from clean, reliable fresh<br />

water supplies and health<br />

and sanitation awareness<br />

training.<br />

• Over K 7.5 million spent<br />

on emergency repairs,<br />

maintenance and upgrade<br />

of the Lae - Bulolo Highway<br />

keeping this vital link open.<br />

• A K26 million power<br />

transmission line project will<br />

enable rural electrification<br />

opportunities for<br />

communities.