Report - City of Tustin
Report - City of Tustin
Report - City of Tustin
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Exhibit A<br />
Resolution No 4163<br />
Page 3<br />
USE RESTRICTIONS<br />
1 21 The facility shall be limited to nine 9 panel antennas one 1 parabolic<br />
antenna and associated equipment All antennas shall be located as<br />
depicted in the approved plans and associated ground mounted equipment<br />
shall be located within the proposed block wall equipment enclosure<br />
1 2 No trees shall be relocated or removed to accommodate the project The<br />
applicant shall make a note to this effect on the plans In addition the<br />
applicant shall be responsible for replacing any trees that may become<br />
diseased and or die as a result <strong>of</strong> the installation and operation <strong>of</strong> the<br />
proposed wireless facility<br />
1 23 The applicant shall be responsible for obtaining any required approvals or<br />
clearances from the applicable easement holders for work in any easement<br />
areas<br />
1 24 The structure and all related facilities shall be regularly maintained and<br />
inspected for safety and aesthetics by the applicant in accordance with the<br />
approved plans<br />
1 2v The equipment shall not bear any signs or advertising devices other than<br />
certification warning or other required seals or signage<br />
1 26 Utilities associated with the proposed facility which are not contained<br />
within the proposed block wall enclosure such as but not limited to<br />
telecommunication and power supplies shall be located underground<br />
1 27 At building plan check the applicant shall submit a<br />
plan identifying<br />
hardscape landscape and other improvements that will be removed<br />
under the proposed plan<br />
1 28 Prior to issuance <strong>of</strong> building permits the applicant shall obtain a license<br />
agreement with the <strong>City</strong> The project plans shall make reference to the<br />
license agreement<br />
1 29 The applicant shall evaluate all requests forco location on the facility by<br />
additional carrier s and make agood faith<br />
determination <strong>of</strong> each such<br />
requesting carrier scompatibility with the applicant at this location If in<br />
the good faith determination <strong>of</strong> the applicant the co location is technically<br />
compatible then the applicant shall accommodate such additional carrier<br />
if applicable business terms can be successfully negotiated All requests<br />
forco location shall be reviewed and approved by the <strong>City</strong> and require a<br />
separate license agreement