URBAN INFRASTRUCTURE <strong>CHAPTER</strong> <strong>14</strong> | PART 4<br />

Local<br />

Authority<br />

PMU<br />

Capacity<br />

(MVA)<br />

Voltage<br />

(kV)<br />

Supply<br />

(MVA)<br />

Maximum<br />

Demand<br />

(MW MD)<br />

PBT Pasir<br />

Gudang<br />

(PBTPG)<br />

PGIE 3 x 60 132/22 180 96.63<br />

Tg. Langsat 2 x 60 132/22 120 24.38<br />

PGDT 2 x 60 132/22 120 65.00<br />

Cahaya Baru 2 x 60 132/22 120 48.75<br />

PGPS 1 x 30 132/22 30 <strong>14</strong>.63<br />

Titan P.<br />

Gudang<br />

Titan Tg.<br />

Langsat<br />

Antara Steel<br />

Mill<br />

– 132 – 15.50<br />

– 132 – 22.27<br />

– 132 – 54.82<br />

Sub Total 570 341.98<br />

GRAND TOTAL 2040.00 994.98<br />

Main Sub Station (PMU) 132/22 kV Kangkar Tebrau<br />

C. Projected Demand for Power<br />

Demand for power is projected based on future projections for<br />

economic growth as well as the physical development growth within<br />

the SJER area.<br />

Source : Regional Load Forecast and Load Desegregation Report, 1997-2009<br />

As illustrated, the current supply outstrips demand. The capacity from all<br />

the intake substations in SJER in the year 2003 is 1249.50MW compared<br />

to the actual total demand of 653 MW.<br />

Table <strong>14</strong>.3: Demand of Power Supply Compared to The Capacity<br />

D. Meeting Demand for Power<br />

Consumption of electricity within SJER will increase from 1,334 MW<br />

in 2005 to 2,819 MW by the year 2025. The increase is in line with<br />

the physical development of the area. The Table <strong>14</strong>.4 illustrates the<br />

projected growth in demand for power from different user bases<br />

(housing, commercial, industry and street lightings).<br />

Usage 2003<br />

Capacity (MW) 1249.50<br />

Demand (MW) 653.00<br />

TNB’s coverage should extend to 100% of SJER and be sufficient to meet<br />

demand. The reserve margin needs to be maintained at a minimum of<br />

25%.<br />

Source: SJER CDP 2025<br />

Balance (MW) 596.50<br />

<strong>14</strong> - 3