URBAN INFRASTRUCTURE <strong>CHAPTER</strong> <strong>14</strong> | PART 4<br />
Local<br />
Authority<br />
PMU<br />
Capacity<br />
(MVA)<br />
Voltage<br />
(kV)<br />
Supply<br />
(MVA)<br />
Maximum<br />
Demand<br />
(MW MD)<br />
PBT Pasir<br />
Gudang<br />
(PBTPG)<br />
PGIE 3 x 60 132/22 180 96.63<br />
Tg. Langsat 2 x 60 132/22 120 24.38<br />
PGDT 2 x 60 132/22 120 65.00<br />
Cahaya Baru 2 x 60 132/22 120 48.75<br />
PGPS 1 x 30 132/22 30 <strong>14</strong>.63<br />
Titan P.<br />
Gudang<br />
Titan Tg.<br />
Langsat<br />
Antara Steel<br />
Mill<br />
– 132 – 15.50<br />
– 132 – 22.27<br />
– 132 – 54.82<br />
Sub Total 570 341.98<br />
GRAND TOTAL 2040.00 994.98<br />
Main Sub Station (PMU) 132/22 kV Kangkar Tebrau<br />
C. Projected Demand for Power<br />
Demand for power is projected based on future projections for<br />
economic growth as well as the physical development growth within<br />
the SJER area.<br />
Source : Regional Load Forecast and Load Desegregation Report, 1997-2009<br />
As illustrated, the current supply outstrips demand. The capacity from all<br />
the intake substations in SJER in the year 2003 is 1249.50MW compared<br />
to the actual total demand of 653 MW.<br />
Table <strong>14</strong>.3: Demand of Power Supply Compared to The Capacity<br />
D. Meeting Demand for Power<br />
Consumption of electricity within SJER will increase from 1,334 MW<br />
in 2005 to 2,819 MW by the year 2025. The increase is in line with<br />
the physical development of the area. The Table <strong>14</strong>.4 illustrates the<br />
projected growth in demand for power from different user bases<br />
(housing, commercial, industry and street lightings).<br />
Usage 2003<br />
Capacity (MW) 1249.50<br />
Demand (MW) 653.00<br />
TNB’s coverage should extend to 100% of SJER and be sufficient to meet<br />
demand. The reserve margin needs to be maintained at a minimum of<br />
25%.<br />
Source: SJER CDP 2025<br />
Balance (MW) 596.50<br />
<strong>14</strong> - 3