SECTION B<br />

PLANNING AND IMPLEMENTATION<br />

<strong>14</strong>.3 Power Supply<br />

The provision of sufficient and uninterrupted electric power is essential to<br />

support urban growth. With this in mind, the generation and distribution<br />

of power needs to be properly planned, making use of the latest<br />

technology as required.<br />

B. Current Main Substation and Capacity<br />

The present supply of electric power in the study area is sufficient. Based<br />

on Table <strong>14</strong>.2, the capacity of 23 main intake substations could meet<br />

the demand of SJER and produce 2040 MVA with a maximum capacity<br />

of 994MV. Figure <strong>14</strong>.1 shows the location of the intake substations in the<br />

study areas.<br />

UI 1:<br />

UI 2:<br />

KEY DIRECTION<br />

Ensure sufficient supply of power to cater for the growth of<br />

SJER and to support its objective of becoming a world class<br />

sustainable conurbation.<br />

To ensure that the reliability of power within SJER meets the<br />

standards set for MSC Cybercities and Cybercentres.<br />

Table <strong>14</strong>.2: List of Sub-station (PMU) and Demand (MVA) in SJER, 2003<br />

Local<br />

Authority<br />

Majlis<br />

Bandaraya<br />

Johor Bahru<br />

(MBJB)<br />

PMU<br />

Capacity<br />

(MVA)<br />

Voltage<br />

(kV)<br />

Supply<br />

(MVA)<br />

Maximum<br />

Demand<br />

(MW MD)<br />

Kangkar 2X60 132/22 120.00 65.00<br />

Tebrau 2X60 132/22 120.00 70.00<br />

Stulang<br />

Darat<br />

2X45 132/22 90.00 60.00<br />

A. Enhance the Reliability of Power Supply<br />

The following proposed targets will be set for SJER i.e.:<br />

■ Improve System Average Interruption Duration Index (SAIDI) from<br />

the current 105 minutes/customer/year (2004) 1 to less than 20<br />

minutes/customer/year; and<br />

■ System Average Interruption Frequency Indexes (SAIFI) from 1.11<br />

(2004) to less than 0.5<br />

Table <strong>14</strong>.1: Performance Of The Electricity Supply Services<br />

Name of Cities<br />

Johor Bahru<br />

Kuala Lumpur<br />

Putrajaya<br />

Performance<br />

Index : SAIDI<br />

105<br />

99<br />

2<br />

Name of Cities<br />

Johor Bahru<br />

Kuala Lumpur<br />

Putrajaya<br />

Performance<br />

Index : SAIFI<br />

1.11<br />

0.84<br />

0.01<br />

Majlis Perbandaran<br />

Johor Bahru<br />

Tengah<br />

(MPJBT)<br />

Majlis Daerah<br />

Kulai<br />

(MDK)<br />

Majidee 2X60 132/22 120.00 80.00<br />

Tampoi Ind. 2X60 132/22 120.00 60.00<br />

Tebrau<br />

Central<br />

2X60 132/22 120.00 60.00<br />

Kempas 2X60 132/22 120.00 60.00<br />

Sub total 810.00 455.00<br />

Tg. Kupang 2X60 132/22 120.00 60.00<br />

Ulu Tiram 2X60 132/22 120.00 60.00<br />

Skudai 2X60 132/22 120.00 70.00<br />

Sub Total 360.00 190.00<br />

Saleng 2X30 132/11 60.00 20.00<br />

Seelong 2X30 132/11 60.00 15.00<br />

Singapore<br />

15<br />

Singapore<br />

0.10<br />

Bukit Batu 2X30 132/11 60.00 12.00<br />

France<br />

USA<br />

52<br />

88<br />

Michigan<br />

London<br />

1.35<br />

0.40<br />

Johor<br />

Tengah ITC<br />

2X30 132/11 60.00<br />

11.00<br />

Japan<br />

New York<br />

0.02<br />

0.99<br />

Senai Hitec 2X30 132/11 60.00 15.00<br />

Sub Total 300.00 73.00<br />

Source: Report on The Performance Of The Electricity Supply Services In<br />

<strong>Malaysia</strong>, Interim Report 1st Half 2004<br />

1 Report on The Performance Of The Electricity Supply Services In<br />

<strong>Malaysia</strong>, Interim Report 1st Half 2004<br />

<strong>14</strong> - 2