CHAPTER 14 - Iskandar Malaysia
CHAPTER 14 - Iskandar Malaysia
CHAPTER 14 - Iskandar Malaysia
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SECTION B<br />
PLANNING AND IMPLEMENTATION<br />
C. System Development<br />
The following recommendations are proposed:<br />
■ Provide gas piping system for all sectors (industrial, commercial<br />
and residential);<br />
■ Extend area of coverage for “City Gas System”; and<br />
■ Gas pipes should use the common “service utility tunnel”.<br />
As a minimum, Gas <strong>Malaysia</strong> should implement a gas piping network in<br />
future large developments. A comprehensive piping system in housing<br />
areas should also be promoted.<br />
D. Gas Supply Strategies<br />
It is recommended that a strategic plan should be prepared by SJER<br />
to identify all the utility providers. The gas distribution system should<br />
cover major development areas such as Tanjung Pelepas Port, Pasir<br />
Gudang Port, Johor Bahru City Centre and Senai Cargo Hub, as well as<br />
supporting development areas, such Bandar Nusajaya and Danga Bay.<br />
SJER should promote the use of piped gas in new development areas,<br />
especially for high-rise housing, mixed use development projects and<br />
projects within 2 km of the existing reserve pipeline. Pipelines should<br />
also be connected to Bandar Nusajaya, Pasir Gudang Port and PTP<br />
to support these mega township developments. Common trenching<br />
should be used where possible, to be implemented in stages, so that<br />
future maintenance work or upgrades can be done systematically<br />
without digging up roads.<br />
<strong>14</strong> - 26