04.10.2014 Views

CHAPTER 14 - Iskandar Malaysia

CHAPTER 14 - Iskandar Malaysia

CHAPTER 14 - Iskandar Malaysia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SECTION B<br />

PLANNING AND IMPLEMENTATION<br />

C. System Development<br />

The following recommendations are proposed:<br />

■ Provide gas piping system for all sectors (industrial, commercial<br />

and residential);<br />

■ Extend area of coverage for “City Gas System”; and<br />

■ Gas pipes should use the common “service utility tunnel”.<br />

As a minimum, Gas <strong>Malaysia</strong> should implement a gas piping network in<br />

future large developments. A comprehensive piping system in housing<br />

areas should also be promoted.<br />

D. Gas Supply Strategies<br />

It is recommended that a strategic plan should be prepared by SJER<br />

to identify all the utility providers. The gas distribution system should<br />

cover major development areas such as Tanjung Pelepas Port, Pasir<br />

Gudang Port, Johor Bahru City Centre and Senai Cargo Hub, as well as<br />

supporting development areas, such Bandar Nusajaya and Danga Bay.<br />

SJER should promote the use of piped gas in new development areas,<br />

especially for high-rise housing, mixed use development projects and<br />

projects within 2 km of the existing reserve pipeline. Pipelines should<br />

also be connected to Bandar Nusajaya, Pasir Gudang Port and PTP<br />

to support these mega township developments. Common trenching<br />

should be used where possible, to be implemented in stages, so that<br />

future maintenance work or upgrades can be done systematically<br />

without digging up roads.<br />

<strong>14</strong> - 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!