Table <strong>14</strong>.<strong>14</strong>: Estimated Water Supply Infrastructure Cost<br />
Zone 1 – MBJB<br />
Bil. Project Project Cost (RM) Proposed Agency<br />
1 Constructed of reinforcement concrete water tank 156,122,482 SAJH/Developer<br />
2 Constructed of common trenching 34,335,000 SAJH<br />
3 Constructed new pipelines 1,260,000 SAJH<br />
4 Replace the old pipelines. 37,800,000 SAJH<br />
Total 229,517,482<br />
Zone 2 – MPJBT<br />
Bil. Project Project Cost (RM) Proposed Agency<br />
1 Constructed of reinforcement concrete water tank <strong>14</strong>9,160,052 SAJH/Developer<br />
2 Constructed of common trenching 16,000,000 SAJH<br />
3 Constructed new pipelines 1,260,000 SAJH<br />
4 Replace the old pipelines. 18,900,000 SAJH<br />
Total 185,320,052<br />
Zone 3 – MPKu<br />
Bil. Project Project Cost (RM) Proposed Agency<br />
1 Constructed of reinforcement concrete water tank 62,063,176 SAJH/Developer<br />
2 Constructed of common trenching 6,300,000 SAJH<br />
4 Replace the old pipelines. 18,900,000 SAJH<br />
Total 87,263,176<br />
Zone 4 – PBTDJB<br />
Bil. Project Project Cost Proposed Agency<br />
1 Constructed of reinforcement concrete water tank 155,623,580 SAJH/Developer<br />
Total 155,623,580<br />
Zone 5 - PBT Pasir Gudang<br />
Bil. Project Project Cost (RM) Proposed Agency<br />
1 Constructed of reinforcement concrete water tank 95,000,000 SAJH/Developer<br />
2 Constructed of common trenching 7,000,000 SAJH<br />
4 Replace the old pipelines. 10,000,000 SAJH<br />
Total 112,000,000<br />
Grand Total for Water Supply 769,724,291<br />