CHAPTER 14 - Iskandar Malaysia
CHAPTER 14 - Iskandar Malaysia
CHAPTER 14 - Iskandar Malaysia
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
URBAN INFRASTRUCTURE <strong>CHAPTER</strong> <strong>14</strong> | PART 4<br />
Figure <strong>14</strong>.3: Concept of Rainwater Harvesting For Residential Building<br />
Location Usage Q Depth (m)<br />
IKBN Skudai D 10.00 75.00<br />
Gutter to collect<br />
rainwater<br />
Rainwater distribution pipe<br />
for non-drinking use such as<br />
gardening and toilet<br />
flushing.<br />
Water main for domestic use from<br />
water authority reticulation system<br />
Source: SJER CDP 2025<br />
Water tank for<br />
domestic water<br />
supply from water<br />
authority<br />
Collection pipe from<br />
gutter to rainwater<br />
storage tank<br />
Rainwater storage<br />
tank<br />
Kg. Seri G. Pulai D 10.00 104.00<br />
Kelab Golf DiRaja D 1.00 30.00<br />
Kg. Sg. Tiram D 5.00 90.00<br />
Kg. Pulai D 5.00 35.00<br />
Kg. Ulu Choh D 5.00 130.00<br />
TOTAL 123<br />
Source: SJER CDP 2025<br />
D. Wastewater<br />
The drainage system and the sewerage treatment plant are two sources<br />
of wastewater. Surface run-offs and treated effluent from sewerage<br />
treatment plants shall be disposed in the river systems of the SJER and<br />
can be used as a water source particularly for non-domestic uses such<br />
as municipal landscaping and gardening.<br />
C. Ground Water<br />
Within the study area ground water is projected to represent only 0.2%<br />
of total water supply in the year 2025. Nevertheless, it is important,<br />
particularly for the drinking water industry, Table below shows the<br />
location and capacity of ground water.<br />
Table <strong>14</strong>.13: List of Tube Well in SJER<br />
Location Usage Q Depth (m)<br />
Kulai Besar Oil Mill D 10.00 8.00<br />
Kulai Besar Oil Mill D 10.00 8.00<br />
As such, it is paramount that treated effluent discharge into the river<br />
system is properly managed and water quality of rivers are maintained<br />
to the required standards.<br />
E. Construction Cost<br />
Estimates of the cost of developing the water supply system are<br />
based on current year, 2006. The cost in Zone 1, MBJB is expected<br />
to be higher than that of other zones. The cost of the water supply<br />
infrastructure is summarised in the Table <strong>14</strong>.<strong>14</strong>.<br />
Kulai Besar Oil Mill D 10.00 7.80<br />
Larkin Industrial I 10.00 163.00<br />
Larkin Industrial I 10.00 160.00<br />
Kulai Evegreen MW 5.00 200.00<br />
Ocean, U. Tiram MW 6.00 115.82<br />
Ocean, U. Tiram MW 1.00 30.4<br />
Kg. Murni Jaya D 5.00 104.00<br />
Kg. Kuala Kabung D 5.00 124.00<br />
Kg. Air Manis D 5.00 110.00<br />
SM Senai D 10.00 93.00<br />
<strong>14</strong> - 9