04.10.2014 Views

Aerial Lift Platform Operator Daily Checklist - Nasa

Aerial Lift Platform Operator Daily Checklist - Nasa

Aerial Lift Platform Operator Daily Checklist - Nasa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Aerial</strong> <strong>Lift</strong> <strong>Platform</strong> <strong>Operator</strong><br />

<strong>Daily</strong> <strong>Checklist</strong><br />

GRC BUILDING LIFT PLATFORM ID NUMBER CAPACITY<br />

MODEL NUMBER<br />

S/N<br />

MONTH/YEAR<br />

The following items below shall be<br />

checked daily.<br />

TON<br />

ITEM NUMBERS<br />

Test run, observe operation for malfunctions for:<br />

1.<br />

a. Horn<br />

b. Alarms - including tilt sensor<br />

c. Gauges - visual<br />

d. Limit switch<br />

e. Machine functions<br />

f. Auxiliary control<br />

2.<br />

a. Parking brake<br />

In forward gear, push the accelerator with the<br />

brake set<br />

b. Service brake<br />

Accelerate, apply brakes, 2nd boom up<br />

c. Steering<br />

Operate steering through full range of motion<br />

3.<br />

a. Boom; Jib up/down; rotate; 2nd up/down<br />

Raise boom up 5' and then lower<br />

Drive speed 1 ft/sec/lift 2nd boom 1 ft.<br />

b. Scissors type platform<br />

Raise the platform 5' then lower<br />

Perform a visual inspection of the following<br />

parts/inspection issue:<br />

4.<br />

a. Battery fluid leaks and proper fluid level<br />

b. Hydraulic power unit, tank, hoses, fittings,<br />

cylinders, and manifolds<br />

c. Proper hydraulic oil level<br />

d. Electrical components, wiring , and electrical<br />

cables<br />

5.<br />

a. Tires and wheels<br />

b. Nuts, bolts, and other fasteners<br />

c. Drive motors<br />

6.<br />

a. Break release components<br />

b. Boom wear pads<br />

7.<br />

a. <strong>Platform</strong> entry mid-rail/gate<br />

b. Lanyard anchor points<br />

8.<br />

a. Cracks in welds or structural components<br />

DATE<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

1 2 3 4 5 6 7 8 OPERATOR<br />

b. Dents or damage<br />

c. Chassis trays are in place, latched and properly<br />

connected<br />

GRC 61 (MAY 13)<br />

30<br />

31<br />

Y = OK<br />

N = See comments


Inspector's Report<br />

URGENCY OF RECOMMENDED ACTION<br />

DATE/ITEM<br />

CORRECTIVE ACTION<br />

REQUIRED<br />

STOP USE OF LIFT<br />

PLATFORM UNTIL<br />

REPAIRS ARE<br />

COMPLETED<br />

REPAIR ITEMS DUE BY<br />

(DATE):<br />

ORDER REPAIR PARTS<br />

(WORK ORDER #, PR#)<br />

GRC 61 (MAY 13)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!