Hilti HIT-HY 150 MAX post-installed rebars - coBuilder

Hilti HIT-HY 150 MAX post-installed rebars - coBuilder

Hilti HIT-HY 150 MAX post-installed rebars - coBuilder

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Hilti</strong> <strong>HIT</strong>-<strong>HY</strong> <strong>150</strong> <strong>MAX</strong><br />

<strong>post</strong>-<strong>installed</strong> <strong>rebars</strong><br />

Minimum anchorage length<br />

According to ETA-08/0202, the multiplication factor for minimum anchorage length is 1,0 for all approved drilling<br />

methods.<br />

Minimum anchorage and lap lengths for C20/25; maximum hole lengths<br />

Diameter d s<br />

[mm]<br />

Rebar<br />

f y,k<br />

[N/mm²]<br />

l b,min *<br />

[mm]<br />

Hammer drilling,<br />

Compressed air drilling<br />

l 0,min *<br />

[mm]<br />

l max<br />

[mm]<br />

8 500 113 200 1000<br />

10 500 142 200 1000<br />

12 500 170 200 1000<br />

14 500 198 210 1000<br />

16 500 227 240 <strong>150</strong>0<br />

18 500 255 270 2000<br />

20 500 284 300 2000<br />

22 500 312 330 2000<br />

24 500 340 360 2000<br />

25 500 354 375 2000<br />

* l b,min (8.6) and l 0,min (8.11) are calculated for good bond conditions with maximum utilisation of rebar yield<br />

strength f yk = 500 N/mm² and α 6 = 1,0<br />

846<br />

09 / 2012