SNTGN “TRANSGAZ” SA Medias Annual Management Report for 2007<br />
Consequently, the elaboration and completion of the maintenance programme focused<br />
on boosting the efficiency of the repair works, on reasonably using the allocated funds<br />
and on correlating with Transgaz’ investment programme.<br />
The deadlines for completion of works, as provided in contracts, were generally<br />
observed. Delays thereto were objectively justified (unfavourable weather conditions,<br />
priority of other works, etc.) without endangering gas transmission capacity, over peak<br />
periods.<br />
The maintenance works were supervised by all Transgaz’ departments involved, in<br />
close co-operation with the contracted constructors and service providers specified in<br />
the maintenance programme.<br />
2.2.3. Investment programme<br />
The scientific and engineering research activity, in the field of gas transmission,<br />
playing an important role in the Romanian medium and long-term Energy Strategy, is<br />
mainly directed at NTS development, rehabilitation, modernization and safety increase<br />
by:<br />
building of new transmission pipelines, high pressure joints and meteringregulating<br />
stations necessary for the gas supply to new distributions;<br />
construction of land equipment and transmission pipelines related to underground<br />
gas storage facilities;<br />
modernization of gas metering systems and equipment;<br />
development of new compressor capacities and upgrading of the current<br />
compressor stations;<br />
modernization of technological nodes;<br />
modernization and automation of the cathodic protection stations;<br />
gas odorisation;<br />
implementation of new processes and technologies;<br />
environmental protection, labour security and health.<br />
According to the programme data of the Romanian medium-term Energy Strategy (up<br />
to 2013), the scientific and engineering research activity within the Research,<br />
Engineering and Regulation Department shall be focused on great complexity strategic<br />
works:<br />
• construction, on the Romanian territory, of transit capacities integrated into the<br />
Caspian-Western Europe gas transmission corridor (Nabucco project);<br />
• completion of the Szeged (Hungaria) - Arad (Romania) pipeline;<br />
• Negru Vodă IV Import Gas Station;<br />
• Romania - Ukraine (Siret region) interconnection pipeline;<br />
• rehabilitation of the DN 1000 mm Isaccea - Negru Vodă transit pipeline.<br />
Page 27 of 54