Full Version - Essential Energy
Full Version - Essential Energy
Full Version - Essential Energy
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Customer information<br />
The following publications are available at<br />
www.countryenergy.com.au, from customer service<br />
centres or through our call centre on 13 23 56.<br />
Network and pricing<br />
Capital contributions<br />
Electricity network services pricing and service<br />
Information Package 2001<br />
Electricity Supply Standard<br />
Network price list August 2002<br />
Reimbursement scheme for rural and large<br />
load customers<br />
Electricity Network Performance Report<br />
Wagga Wagga Gas Network Pricing 2005<br />
Adelong, Gundagai and Tumut Gas Transportation<br />
Charges November 2004<br />
Bombala and Cooma Gas Transportation Charges<br />
November 2004<br />
SW Slopes Gas Transportation Charges<br />
November 2004<br />
CE Gas Access Arrangement Wagga Wagga Gas<br />
Network 1999<br />
Proposed network improvements<br />
Electricity System Development Review 2002<br />
Joint TransGrid and Country <strong>Energy</strong> request for<br />
proposals for demand management or local<br />
generation on the Mid North Coast<br />
Retail regulation<br />
Country <strong>Energy</strong> regulated retail price list – July 2005<br />
Standard form customer supply contract (Electricity)<br />
Summary for small retail customers of standard form<br />
electricity connection contract<br />
Your rights regarding bills and charges for electricity<br />
Standard form customer connection contract<br />
Negotiated short form customer connection contract<br />
Standard Form Contract – terms and conditions for the<br />
supply of natural gas<br />
Summary for small retail customers of Country <strong>Energy</strong><br />
Standard form gas contract<br />
Your rights regarding bills and charges for gas<br />
Electricity Industry Guideline No.13: Greenhouse gas<br />
disclosure on electricity customers’ bills<br />
Guideline No.10: Confidentiality and explicit informed<br />
consent – electricity and gas<br />
Victorian Interim Operating Procedure – wrongful<br />
disconnections<br />
Corporate<br />
Annual Report 2003-2004<br />
Bushfire risk management<br />
Connecting to the electricity network<br />
Country <strong>Energy</strong>’s Privacy Policy<br />
Environment Policy<br />
Identifying potential cogeneration sites<br />
Sponsorship Guidelines<br />
Statement of Affairs for the Period Ending<br />
30 June 2003<br />
Vegetation Management Plan<br />
What all residents should know about living with<br />
electricity easements<br />
What to do if the lights go out<br />
Safety<br />
Christmas lights safety checklist<br />
Customer Installation Safety Plan<br />
Electrical hazard awareness<br />
Electrical Safety Rules Code of Practice<br />
Health and Safety Policy<br />
Keep structures a safe distance<br />
Public Electrical Safety Awareness Plan<br />
Safety first handbook<br />
Natural gas safety and you<br />
Structures near powerlines<br />
Safety fact sheets<br />
97<br />
COUNTRY ENERGY ANNUAL REPORT 2004–2005