UNCLASSIFIED<br />

OPERATIONAL PROCEDURE - <strong>Elster</strong> <strong>LCR</strong>-<strong>212</strong> <strong>Single</strong> <strong>Phase</strong><br />

<strong>Load</strong> <strong>Control</strong> Ripple Receiver Installation and<br />

Use<br />

CEOP8086<br />

It is also possible to execute test switching operations with the programmer however, the<br />

input of the receiver is not tested through the serial interface. To test the input of the<br />

receiver, a TT-2 test transmitter can be used or a remote signal from a frequency injection<br />

plant can be called upon.<br />

When programming receivers not mounted and powered up on a switchboard, a suitable<br />

“receiver power-up cradle” shall be used.<br />

22 March 2011 - Issue 3<br />

Approved By: General Manager Technical Services<br />

Page 14 of 17<br />

UNCLASSIFIED<br />

UNCONTROLLED COPY IF PRINTED