UNCLASSIFIED<br />
OPERATIONAL PROCEDURE – <strong>Connection</strong> <strong>Guidelines</strong> for High<br />
Voltage <strong>Connection</strong>s and Embedded Generators<br />
<strong>CEOP8079</strong><br />
The connection enquiry must include the following information (refer to Attachment A –<br />
Summary NER Schedule 5.4 <strong>Connection</strong> Enquiry) to be adequate:<br />
Expected type of load/ generation<br />
Preliminary system planning data as listed in Schedule 5.4 of the NER<br />
Required connection timeframes<br />
Reliability requirements (eg N, N-1)<br />
Preferred connection location<br />
Alternative connection locations<br />
Proposed route of any easements and location of land on which the Electricity Works are<br />
to be constructed or installed<br />
Project status<br />
Company information.<br />
The key objective of this stage is to assist the <strong>Connection</strong> Applicant to determine a single<br />
preferred connection option before advancing to a formal <strong>Connection</strong> Application. It also<br />
clarifies the information required to achieve an NER compliant <strong>Connection</strong> Application.<br />
5.3 <strong>Connection</strong> Enquiry Response<br />
<strong>Essential</strong> <strong>Energy</strong> must respond to the <strong>Connection</strong> Applicant in accordance with clause 5.3.3<br />
of the NER on receiving an adequate connection enquiry and must:<br />
Within 5 business days advise the <strong>Connection</strong> Applicant if any further information is<br />
required to process the connection enquiry<br />
Within 10 business days advise the <strong>Connection</strong> Applicant:<br />
o<br />
o<br />
o<br />
if another TNSP or DNSP is to be involved<br />
if any of the connection works are contestable<br />
of a preliminary programme indicating milestones<br />
Within 20 business days advise the <strong>Connection</strong> Applicant:<br />
o<br />
o<br />
o<br />
o<br />
o<br />
o<br />
o<br />
o<br />
o<br />
o<br />
the technical requirements<br />
the access standards (automatic)<br />
the applicable plant standards<br />
the nominal voltage level<br />
if AEMO is to be involved in any of the above<br />
the connection application requirements<br />
specifications of the facility to be connected<br />
power transfer capability<br />
the fee applicable for <strong>Essential</strong> <strong>Energy</strong> to process an application to connect; and<br />
any other information required pursuant to an application to connect.<br />
<strong>Essential</strong> <strong>Energy</strong> may also be able to assist the <strong>Connection</strong> Applicant in reviewing their<br />
analysis of the various connection options to determine the required information necessary<br />
for a valid connection application. This service is outside the NER framework and the<br />
<strong>Connection</strong> Applicant may be required to enter into a CISA and/or LAIA at this time.<br />
23 November 2012 - Issue 7<br />