27.09.2014 Views

CEOP8079 - Connection Guidelines - Essential Energy

CEOP8079 - Connection Guidelines - Essential Energy

CEOP8079 - Connection Guidelines - Essential Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIED<br />

OPERATIONAL PROCEDURE – <strong>Connection</strong> <strong>Guidelines</strong> for High<br />

Voltage <strong>Connection</strong>s and Embedded Generators<br />

<strong>CEOP8079</strong><br />

3 CONNECTION ENQUIRY – PROCESS FLOW CHART<br />

Applies to all new HV and embedded generator connections and the modification of existing<br />

connection agreements.<br />

23 November 2012 - Issue 7<br />

Approved By: Group Manager Major Customer Engagement<br />

Page 6 of 36<br />

UNCLASSIFIED<br />

UNCONTROLLED COPY IF PRINTED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!