OPERATIONAL PROCEDURE – <strong>Connection</strong> <strong>Guidelines</strong> for High<br />
Voltage <strong>Connection</strong>s and Embedded Generators<br />
<strong>CEOP8079</strong><br />
1 INTRODUCTION<br />
This Operational Procedure is designed to cover the requirements that need to be satisfied<br />
by a retail customer or registered participant as a <strong>Connection</strong> Applicant to ensure that<br />
<strong>Essential</strong> <strong>Energy</strong>‟s minimum standards for High Voltage (HV) connection are met.<br />
This Operational Procedure applies to all HV load and generator connections.<br />
2 WHY THESE INSTRUCTIONS ARE IMPORTANT<br />
To ensure a safe and consistent standard is met when undertaking High Voltage connections<br />
and Embedded Generators to the <strong>Essential</strong> <strong>Energy</strong> Distribution Network (the Grid).<br />