UNCLASSIFIED<br />

OPERATIONAL PROCEDURE – <strong>Connection</strong> <strong>Guidelines</strong> for High<br />

Voltage <strong>Connection</strong>s and Embedded Generators<br />

<strong>CEOP8079</strong><br />

1 INTRODUCTION<br />

This Operational Procedure is designed to cover the requirements that need to be satisfied<br />

by a retail customer or registered participant as a <strong>Connection</strong> Applicant to ensure that<br />

<strong>Essential</strong> <strong>Energy</strong>‟s minimum standards for High Voltage (HV) connection are met.<br />

This Operational Procedure applies to all HV load and generator connections.<br />

2 WHY THESE INSTRUCTIONS ARE IMPORTANT<br />

To ensure a safe and consistent standard is met when undertaking High Voltage connections<br />

and Embedded Generators to the <strong>Essential</strong> <strong>Energy</strong> Distribution Network (the Grid).<br />

23 November 2012 - Issue 7<br />

Approved By: Group Manager Major Customer Engagement<br />

Page 5 of 36<br />

UNCLASSIFIED<br />

UNCONTROLLED COPY IF PRINTED