UNCLASSIFIED<br />

OPERATIONAL PROCEDURE – <strong>Connection</strong> <strong>Guidelines</strong> for High<br />

Voltage <strong>Connection</strong>s and Embedded Generators<br />

<strong>CEOP8079</strong><br />

14.3.3 Protection Coordination<br />

14.3.4 Auditing<br />

<strong>Essential</strong> <strong>Energy</strong> requires full grading with the <strong>Connection</strong> Applicant‟s first line of<br />

protection to guarantee correct fault discrimination<br />

The <strong>Connection</strong> Applicant, in liaison with <strong>Essential</strong> <strong>Energy</strong>‟s protection group, will<br />

negotiate settings to the generator‟s protection equipment. These settings may not be<br />

modified without <strong>Essential</strong> <strong>Energy</strong>‟s prior agreement.<br />

<strong>Essential</strong> <strong>Energy</strong> may need to audit maintenance records at any time upon negotiation<br />

with the <strong>Connection</strong> Applicant<br />

<strong>Essential</strong> <strong>Energy</strong> may request that maintenance be carried out within a nominated<br />

time period and relevant records forwarded to <strong>Essential</strong> <strong>Energy</strong>.<br />

14.3.5 HV Operations under Normal Conditions<br />

14.3.5.1 Planned Switching Not Involving <strong>Essential</strong> <strong>Energy</strong><br />

The operation of all high voltage equipment at the <strong>Connection</strong> Applicant‟s site beyond<br />

and inclusive of the connection point is the <strong>Connection</strong> Applicant‟s responsibility and<br />

will normally be carried out by the <strong>Connection</strong> Applicant‟s authorised Operating Staff<br />

or authorised service provider<br />

The <strong>Connection</strong> Applicant must notify <strong>Essential</strong> <strong>Energy</strong>‟s Network Operations before<br />

any major new item of high voltage equipment is commissioned.<br />

14.3.5.2 Planned Switching Involving <strong>Essential</strong> <strong>Energy</strong><br />

The <strong>Connection</strong> Applicant must give <strong>Essential</strong> <strong>Energy</strong> Network Operations at least<br />

fifteen business days prior notice of when the <strong>Connection</strong> Applicant plans to carry out<br />

routine maintenance of high voltage equipment that will require <strong>Essential</strong> <strong>Energy</strong> to<br />

carry out network switching operations. When <strong>Essential</strong> <strong>Energy</strong> requires the<br />

generator‟s equipment to be isolated for routine work on <strong>Essential</strong> <strong>Energy</strong>‟s<br />

equipment, then the times will be negotiated on an individual job basis.<br />

14.3.6 HV Regulatory Requirements<br />

14.3.6.1 <strong>Connection</strong> Applicant’s Obligations<br />

The <strong>Connection</strong> Applicant as a high voltage customer must comply with this Schedule<br />

11<br />

The <strong>Connection</strong> Applicant‟s installation must be operated, isolated and made safe for<br />

work in accordance with the requirements of Electricity Supply (Safety and Network<br />

Management) Regulation 2008, which imposes obligations on network operators<br />

The <strong>Connection</strong> Applicant must comply with the <strong>Essential</strong> <strong>Energy</strong> Network<br />

Management Plan Chapter 1 and Chapter 2<br />

The <strong>Connection</strong> Applicant (or their accredited service provider) must have a set of<br />

Electrical Safety Rules, complying with the Network Management Plan, Codes of<br />

Practice and AS 2467-2008 Maintenance of Electrical Switchgear and Appendix A<br />

Example of Electrical Safety Rules, covering the operation of the electrical installation<br />

All employees engaged in work on the <strong>Connection</strong> Applicant‟s high voltage electrical<br />

apparatus must be trained, assessed for competence and audited by the <strong>Connection</strong><br />

Applicant as being competent to work in accordance with the <strong>Connection</strong> Applicant‟s<br />

Electrical Safety Rules<br />

23 November 2012 - Issue 7<br />

Approved By: Group Manager Major Customer Engagement<br />

Page 28 of 36<br />

UNCLASSIFIED<br />

UNCONTROLLED COPY IF PRINTED