UNCLASSIFIED<br />

OPERATIONAL PROCEDURE – <strong>Connection</strong> <strong>Guidelines</strong> for High<br />

Voltage <strong>Connection</strong>s and Embedded Generators<br />

<strong>CEOP8079</strong><br />

The key objective of this stage is to finalise the technical and commercial arrangements<br />

applicable to the connection, including, if necessary, the negotiation of performance<br />

standards pursuant to clause 5.3.4A of the NER.<br />

This stage is finalised when the <strong>Connection</strong> Applicant accepts <strong>Essential</strong> <strong>Energy</strong>‟s offer to<br />

connect.<br />

8.2 Information to be provided with <strong>Connection</strong> Application<br />

The <strong>Connection</strong> Applicant must include the following information in a connection application:<br />

Proposed negotiated performance standards pursuant to clause 5.3.4A of the NER<br />

Detailed system planning data as detailed in Schedule 5.5 of the NER<br />

Preferred connection date<br />

Reliability requirements (N, N-1)<br />

Preferred connection location and arrangement<br />

Project status<br />

Company information<br />

The power transfer requirements<br />

Schedule of connection equipment<br />

The application fee<br />

Details of the land tenure for the electricity works including land owner agreements,<br />

the consultation processes and easement requirements or land acquisitions that<br />

remain outstanding; and (This information must be provided, easements should be<br />

registered and any decision to connect without is at the absolute discretion of<br />

<strong>Essential</strong> <strong>Energy</strong>).<br />

Other relevant information that may be required by <strong>Essential</strong> <strong>Energy</strong> includes but is not<br />

limited to:<br />

A detailed construction program<br />

Details of assets to be transferred to <strong>Essential</strong> <strong>Energy</strong><br />

Full copy of all approvals required by environmental laws for the construction and<br />

operation of the assets and all documents that supported the application for such<br />

approvals and compliance with them<br />

The requirements for route corridor, centreline, access (particularly permanent access)<br />

to the electricity works, and/or details of land required for infrastructure, survey and<br />

design options analysis<br />

If requested, draft route/ corridor, centreline, access and land requirements are best<br />

initially obtained by GPS survey but after investigation must be fixed by formal<br />

registered survey to enable the prompt registration of appropriate plans for the<br />

acquisition of land or grant of easements<br />

Land owner agreements, consultation processes and easement requirements or land<br />

acquisitions by agreement<br />

All relevant <strong>Essential</strong> <strong>Energy</strong> design specifications<br />

Approved materials list, approved equipment may if available be purchased from<br />

<strong>Essential</strong> <strong>Energy</strong> or by negotiation with the manufacturer.<br />

23 November 2012 - Issue 7<br />

Approved By: Group Manager Major Customer Engagement<br />

Page 11 of 36<br />

UNCLASSIFIED<br />

UNCONTROLLED COPY IF PRINTED