SECTION III: CHAPTER 1 OIL WELL DERRICK STABILITY: GUYWIRE ANCHOR SYSTEMS A. INTRODUCTION Work-over Rigs are mast type devices that vary significantly from crane or other boom (mast) type equipment. Work-over Rigs experience constant and varying dynamic loading conditions. They are subjected to various compression forces, along with jarring and wind loading. Other forces induced by pipe, tubing, etc. being stacked in the derrick and workers aloft on the derrick platform, as well as an ever-changing number of lateral and vertical forces are also present. Because of a work-over rig's dynamic environment, the health and safety of the operation is dependent upon the stability of the rig and its guy anchor system. according to the type of soil and its holding capacity, methods of installing guywire anchors, integrity of the system, and acceptable parameters in lieu of actual pull testing should be established. Investigation into each fatal incident has determined that the cause of the upset was component failure rather than total system failure. This clearly illustrates the fact that the integrity of the system is no sounder than its weakest component. CAUSAL FACTORS There is no specific OSHA standard that addresses the stability of derricks in the oilwell drilling and servicing industry, see Figure III:1-1. But because of the fatality record there is a need for a guideline detailing the type of temporary stability systems A. Introduction.......................................III:1-1 B. Types of Guywire Anchors...............III:1-2 C. Stability Considerations...................III:1-3 D. Observations, directions, and Conclusions................................III:1-5 E. Bibliography.......................................III:1-6 gure III:1-1. Oilwell Servicing Derrick Fi III:1-1
- Page 1: OR-OSHA TECHNICAL MANUAL OR-OSHA TE
- Page 5 and 6: C. STABILITY CONSIDERATIONS FOUNDAT
- Page 7 and 8: D. OBSERVATIONS, DIRECTIONS, AND CO
- Page 9 and 10: SECTION III: CHAPTER 2 PETROLEUM RE
- Page 11 and 12: Year Process name Purpose By-produc
- Page 13 and 14: Crude oils are also defined in term
- Page 15 and 16: (dicycloparaffins) found in the hea
- Page 17 and 18: and boilers can leave deposits of v
- Page 19 and 20: C. PETROLEUM REFINING OPERATIONS IN
- Page 21 and 22: Table III:2-3 OVERVIEW OF PETROLEUM
- Page 23 and 24: D. DESCRIPTION OF PETROLEUM REFININ
- Page 25 and 26: CRUDE OIL DISTILLATION (FRACTIONATI
- Page 27 and 28: Even though these are closed proces
- Page 29 and 30: The solvent is separated from the p
- Page 31 and 32: Table III:2-9 VISBREAKING PROCESS F
- Page 33 and 34: HEALTH AND SAFETY CONSIDERATIONS Fi
- Page 35 and 36: Figure III:2-14 Fluid Catalytic Cra
- Page 37 and 38: HYDROCRACKING Hydrocracking is a tw
- Page 39 and 40: egeneration and changeover. Catalys
- Page 41 and 42: CATALYTIC HYDROTREATING Catalytic h
- Page 43 and 44: chemicals and other hazards such as
- Page 45 and 46: needed to prevent HCl from entering
- Page 47 and 48: ALKYLATION Alkylation combines low-
- Page 49 and 50: HEALTH AND SAFETY CONSIDERATIONS Fi
- Page 51 and 52: Figure III:2-23 Molecular Sieve Dry
SECTION III: CHAPTER 1<br />
OIL WELL DERRICK STABILITY: GUYWIRE<br />
ANCHOR SYSTEMS<br />
A. INTRODUCTION<br />
Work-over Rigs are mast type devices that vary significantly<br />
from crane or other boom (mast) type equipment. Work-over<br />
Rigs experience constant and varying dynamic loading<br />
conditions. They are subjected to various compression<br />
forces, along with jarring and wind loading. Other forces<br />
induced by pipe, tubing, etc. being stacked in the derrick and<br />
workers aloft on the derrick platform, as well as an<br />
ever-changing number of lateral and vertical forces are also<br />
present. Because of a work-over rig's dynamic environment,<br />
the health and safety of the operation is dependent upon the<br />
stability of the rig and its guy anchor system.<br />
according to the type of soil and its holding capacity, methods<br />
of installing guywire anchors, integrity of the system, and<br />
acceptable parameters in lieu of actual pull testing should be<br />
established.<br />
Investigation into each fatal incident has determined that the<br />
cause of the upset was component failure rather than total<br />
system failure. This clearly illustrates the fact that the<br />
integrity of the system is no sounder than its weakest<br />
component.<br />
CAUSAL FACTORS<br />
There is no specific OSHA standard that addresses the<br />
stability of derricks in the oilwell drilling and servicing<br />
industry, see Figure III:1-1. But because of the fatality record<br />
there is a need for a guideline detailing the type of temporary<br />
stability systems<br />
A. Introduction.......................................III:1-1<br />
B. Types of Guywire Anchors...............III:1-2<br />
C. Stability Considerations...................III:1-3<br />
D. Observations, directions, and<br />
Conclusions................................III:1-5<br />
E. Bibliography.......................................III:1-6<br />
gure III:1-1. Oilwell Servicing Derrick<br />
Fi<br />
III:1-1