REMOVE<br />

PROJECT BOUNDARY<br />

WILD DOG<br />

EXHIBIT<br />

FENCE TO REMAIN<br />

PRZEWALSKI'S<br />

HORSE HABITAT<br />

(AREA TO BE PROTECTED<br />

DURING CONSTRUCTION)<br />

ANIMAL CHUTE/TUNNEL<br />

BELOW PATH,<br />

PROTECT IN PLACE<br />

MAINTAIN SLOPE AND<br />

BARRIER CONDITION<br />

STRUCTURE<br />

TO REMAIN<br />

2<br />

FENCE<br />

REMAIN<br />

REMAIN<br />

FENCE<br />

REMOVE<br />

FENCE<br />

FENCE<br />

REMOVE<br />

FENCE<br />

FENCE<br />

REMOVE<br />

REMAIN<br />

11<br />

17<br />

19 19<br />

17<br />

REMAIN<br />

FENCE<br />

FENCE<br />

REMOVE<br />

FENCE TO REMAIN<br />

HABITAT<br />

(AREA TO BE PROTECTED<br />

DURING CONSTRUCTION)<br />

Demo Legend<br />

Demolish all pavement (asphalt, concrete, unit<br />

pavers), steps and gravel.<br />

Existing Building to Remain<br />

Existing Building to be Removed<br />

Wooden Deck and Shade Structures to be Removed<br />

Project Boundary<br />

Construction Fence and Gate,<br />

See ST-803<br />

MEADOW VALE RD.<br />

<strong>GENERAL</strong> <strong>DEMOLITION</strong> <strong>NOTES</strong><br />

1. All demolition material shall be properly disposed of off site by<br />

Contractor unless otherwise noted or directed by Owner.<br />

2. Provide appropriate protection for existing site features to remain.<br />

Repair and/or replace at Contractor's expense any existing site features<br />

designated to remain that are damaged during site work to the<br />

pre-existing condition.<br />

3. The <strong>Zoo</strong> shall remain open during construction. Contractor shall<br />

coordinate with Owner closing of <strong>Zoo</strong> paths and phasing of walkways<br />

prior to construction.Contractor shall protect the general public from<br />

construction areas during construction. Contractor shall coordinate<br />

construction fencing and access requirements with Owner's<br />

Representative prior to construction.<br />

4. Contractor shall be responsible for protection from construction related<br />

damage to any adjacent <strong>Zoo</strong> areas, vegetation, and structures.<br />

5. Where existing pavement is removed Contractor to provide clean<br />

sawcut edge.<br />

6. The plans and notes provided here are for reference only and may not<br />

illustrate the complete scope of demolition required. Contractor shall<br />

visit site to review and assess the requirements. Contractor shall verify<br />

all existing and proposed conditions and elevations prior to<br />

construction. Contractor shall notify Owner's Representative of<br />

discrepancies prior to construction.<br />

7. Remove and salvage all site furniture within project limits, including<br />

all benches, trash containers and all associated footings. Return<br />

furniture to Owner.<br />

8. Remove and salvage all informational signage and graphics within<br />

work limits. Store on site. Location to be coordinated with Owner.<br />

9. Remove and salvage all natural boulders and store on site. Location to<br />

be coordinated with Owner.<br />

10.Prior to demolition, the Owner shall remove all stored items from<br />

buildings to be demolished. Owner to salvage animal support features<br />

unless otherwise stated.<br />

11.All items being removed/demolished to be removed/demolished one<br />

(1) metere below proposed new construction or proposed grade unless<br />

otherwise noted.<br />

12.Existing utilities to be protected for re-use in proposed design.<br />

See Civil Engineering drawings.<br />

13.Where fill is required use appropriate fill for proposed future use. See<br />

geotech report, civil/structual engineering drawings and specifications.<br />

14.Posts, bollards and footings associated with barriers, structures and<br />

exhibits being demolished to be removed.<br />

15.Staging areas and on-site storage of Contractor equipment shall be<br />

reviewed and approved by the Owner prior to the beginning of<br />

construction.<br />

16.Establish erosion controls prior to construction commencement.<br />

17.Contractor to verify that all demolition be in compliance with all<br />

applicable codes.<br />

18.No work shall be performed within the dripline of trees to remain<br />

unless specially identified in the drawings. No materials or equiptment<br />

shall be placed within the drip line of trees and tree protection fencing<br />

unless specially allowed by Owner. See D-120 for Tree Protection and<br />

Removal Plan.<br />

19.Salvage for reuse Nelson waterers in exhibits being demolished. See<br />

ST-105 for waterer schedule. Owner to verify.<br />

11<br />

FENCE TO REMAIN<br />

19<br />

<strong>DEMOLITION</strong> LEDGEND <strong>NOTES</strong><br />

1<br />

2<br />

Sheds and animal holding buildings and other noted structures to be<br />

demolished one (1) metere below proposed new construction or<br />

proposed grade. Materials to be removed and hauled off site. Utilities to<br />

be disconnected and capped. Prior to demolition, Owner will salvage<br />

equipment and other items.<br />

Sheds, animal holdings and other noted structures to remain to be<br />

protected during construction.<br />

REMOVE<br />

FENCE<br />

FENCE TO<br />

REMAIN<br />

1<br />

3<br />

4<br />

Exhibit rockwork, moat walls and cave. See D-110 for demolition plan.<br />

Asphalt and base course materials to be removed. Joints should be saw<br />

cut where existing paving meets new paving. See Layout plans for exact<br />

cut locations.<br />

5<br />

Concrete pad and base course materials to be removed.<br />

17<br />

HOLDING<br />

BUILDING 2<br />

6<br />

7<br />

8<br />

Not used.<br />

Unit pavers, bricks and base course to be removed.<br />

Relocate natural boulders on site, typical.<br />

POND 4<br />

9<br />

Protect in place view railing.<br />

10<br />

Exhibit <strong>Zoo</strong> Rock to remain. Protect in place during construction.<br />

11<br />

All fences, gates and posts (including but not limited to: post and wire<br />

fences, chainlink fences, exhibit handrails, exclusion fences, stock<br />

fences and hot wire fences) to be removed unless otherwise noted. All<br />

accompanying footings to be removed. Removed exclusion fences to be<br />

salvaged and stored during construction for reuse.<br />

PROJECT BOUNDARY<br />

12<br />

Remove debris in planter island.<br />

POND 4<br />

13<br />

Remove hydro. Verify location and extent with E-Drawings.<br />

14<br />

Exhibit mesh within the project area to be removed unless otherwise<br />

noted<br />

15<br />

Not Used<br />

12<br />

3<br />

3<br />

11<br />

11<br />

SEE SHEET D-101<br />

MATCH LINE<br />

16<br />

17<br />

18<br />

19<br />

Not Used<br />

Remove asphalt as required to accommodate cattle grate. See Site<br />

drawing for location.<br />

Section of Tiger Barrier to be removed. Coordinate with Giant Panda<br />

Documents for exact location.<br />

Section of existing barrier to be removed. Coordinate with layout<br />

drawings.<br />

CAUCUSIAN<br />

TAHR<br />

EXHIBIT<br />

PROTECT BARRIER<br />

EDGE<br />

3<br />

3<br />

4<br />

11<br />

11<br />

5<br />

5<br />

YURTS TO<br />

REMAIN<br />

2<br />

11<br />

REMOVE<br />

FENCE<br />

19<br />

FENCE<br />

REMAIN<br />

20<br />

21<br />

22<br />

Protect existing site features in place.<br />

Kangaroo barriers and gates/vestibules to remain and protected in place.<br />

Remove exhibit barrier, structure, slab.<br />

CAVE<br />

12<br />

1<br />

5<br />

5<br />

11<br />

N<br />

5 0 5 10 15 meters<br />

PROJECT BOUNDARY<br />

4<br />

PROTECT BARRIER<br />

EDGE<br />

EXHIBIT<br />

2<br />

11<br />

5<br />

1<br />

14<br />

14<br />

POND 4<br />

REMOVE<br />

FENCE<br />

2<br />

FENCE<br />

HILL


REMOVE<br />

<strong>GENERAL</strong> <strong>DEMOLITION</strong> <strong>NOTES</strong><br />

See D-100 for General Demolition notes.<br />

12<br />

CAUCUSIAN<br />

TAHR<br />

EXHIBIT<br />

PROTECT BARRIER<br />

EDGE<br />

3<br />

3<br />

3<br />

CAVE<br />

3<br />

11<br />

4<br />

1<br />

11<br />

11<br />

11<br />

5<br />

5<br />

YURTS TO<br />

REMAIN<br />

2<br />

11<br />

SEE SHEET D-100<br />

MATCH LINE<br />

<strong>DEMOLITION</strong> LEDGEND <strong>NOTES</strong><br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

Sheds and animal holding buildings and other noted structures to be<br />

demolished one (1) metere below proposed new construction or<br />

proposed grade. Materials to be removed and hauled off site. Utilities to<br />

be disconnected and capped. Prior to demolition, Owner will salvage<br />

equipment and other items.<br />

Sheds, animal holdings and other noted structures to remain to be<br />

protected during construction.<br />

Exhibit rockwork, moat walls and cave. See D-110 for demolition plan.<br />

Asphalt and base course materials to be removed. Joints should be saw<br />

cut where existing paving meets new paving. See Layout plans for exact<br />

cut locations.<br />

Concrete pad and base course materials to be removed.<br />

Not used.<br />

Unit pavers, bricks and base course to be removed.<br />

Relocate natural boulders on site, typical.<br />

Protect in place view railing.<br />

POND 3<br />

PROJECT BOUNDARY<br />

4<br />

PROTECT BARRIER<br />

EDGE<br />

EXHIBIT<br />

12<br />

5<br />

2<br />

11<br />

5<br />

1<br />

5<br />

14<br />

14<br />

11<br />

POND 4<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

Exhibit <strong>Zoo</strong> Rock to remain. Protect in place during construction.<br />

All fences, gates and posts (including but not limited to: post and wire<br />

fences, chainlink fences, exhibit handrails, exclusion fences, stock<br />

fences and hot wire fences) to be removed unless otherwise noted. All<br />

accompanying footings to be removed. Removed exclusion fences to be<br />

salvaged and stored during construction for reuse.<br />

Remove debris in planter island.<br />

Remove hydro. Verify location and extent with E-Drawings.<br />

Exhibit mesh within the project area to be removed unless otherwise<br />

noted<br />

Not Used<br />

16<br />

Not Used<br />

2<br />

FENCE<br />

HILL<br />

17<br />

18<br />

Remove asphalt as required to accommodate cattle grate. See Site<br />

drawing for location.<br />

Section of Tiger Barrier to be removed. Coordinate with Giant Panda<br />

Documents for exact location.<br />

19<br />

Section of existing barrier to be removed. Coordinate with layout<br />

drawings.<br />

CAMEL<br />

YARDS<br />

TO REMAIN<br />

20<br />

21<br />

Protect existing site features in place.<br />

Kangaroo barriers and gates/vestibules to remain and protected in place.<br />

2<br />

CAMEL<br />

HOLDING<br />

7<br />

22<br />

Remove exhibit barrier, structure, slab.<br />

SIKA DEER<br />

EXHIBIT<br />

CAMEL YARD<br />

BARRIER TO<br />

REMAIN<br />

7<br />

GATE TO<br />

REMAIN<br />

4<br />

BUTTERFLY<br />

MEADOW<br />

1<br />

1<br />

PROJECT BOUNDARY<br />

4<br />

CONSTRUCTION<br />

FENCE<br />

13<br />

4<br />

18<br />

EXISTING<br />

TIGER<br />

EXHIBIT<br />

FENCE TO REMAIN<br />

11<br />

PATH TO<br />

REMAIN<br />

PROJECT BOUNDARY<br />

21<br />

KANGAROO<br />

EXHIBIT<br />

(AREA TO BE PROTECTED<br />

DURING CONSTRUCTION)<br />

7<br />

12<br />

21<br />

9 20<br />

18<br />

1<br />

18<br />

11<br />

APPROXIMATE EURASIA<br />

PANDA DELINEATION (SEE<br />

ST100.1). COORDINATE<br />

PAVEMENT CUTLINES AND<br />

FENCE CUTS WITHIN GIANT<br />

PANDA AREA WITH GIANT<br />

PANDA DRAWINGS.<br />

FENCE TO REMAIN<br />

RED PANDA<br />

EXHIBIT<br />

TRAM<br />

SHELTER<br />

Demo Legend<br />

Demolish all pavement (asphalt, concrete, unit<br />

pavers), steps and gravel.<br />

Existing Building to Remain<br />

Existing Building to be Removed<br />

Wooden Deck and Shade Structures to be Removed<br />

AUSTRAILASIA<br />

PAVILION<br />

21<br />

8<br />

22<br />

18<br />

TIGER<br />

EXHIBIT<br />

11<br />

13<br />

4<br />

Project Boundary<br />

Construction Fence and Gate,<br />

See ST-803<br />

5 0 5 10 15 meters<br />

N<br />

4<br />

FENCE TO REMAIN<br />

PROJECT BOUNDARY


MOAT<br />

<strong>GENERAL</strong> ROCKWORK DEMO. <strong>NOTES</strong><br />

1. See D-100 for General Demolition Notes.<br />

2.Control cuts shall be cut in rockwork before demolition to prevent<br />

damage to rockwork remaining.<br />

3. Verify needed rockwork demolition with Snow Leopard Enclosure<br />

post footing/caisson locations. Survey illustrates rockwork above grade.<br />

Addtional rockwork demolition may be required below grade.<br />

MOAT WALL TO<br />

REMAIN<br />

EDGE OF CONCRETE<br />

MOAT SLAB<br />

6<br />

ROCKWORK DEMO. LEGEND <strong>NOTES</strong><br />

1<br />

2<br />

3<br />

Remove rockwork and/or concrete moat. Verify enough rockwork is<br />

removed to construct post footings. See Layout and Structural<br />

drawings for Snow Leopard Enclosure.<br />

Remove wall 1.2M below finish grade.<br />

Remove rockwork for installation of Snowleopard post caisson. See<br />

Site and Structural drawings for caisson size and location.<br />

4<br />

Selective demolition at cave portals. See ST501.<br />

5<br />

Rockwork may require demolition if there is conflict with proposed<br />

wall.<br />

6<br />

Remove and stockpile granite boulders to <strong>Zoo</strong> approved location.<br />

Stones to be used for proposed Snow Leopard Exhibit.<br />

SEE D-100<br />

MOAT<br />

5<br />

7<br />

8<br />

Remove rockwork for installation of Snow Leopard post caisson. See<br />

Site and Structural drawings for caisson size and location. Cut to have<br />

an irregular edge. Only remove moat concrete slab do not remove<br />

cave or moat wall footing.<br />

Existing cave opening to be protected. Rockwork on slope beside<br />

entry shall remain to retain earth. Coordinate rockwork removal with<br />

enclosure guy anchor locations.<br />

3<br />

1<br />

APPROXIMATE EDGE<br />

OF ROCKWORK AT<br />

EXISTING FINISH<br />

GRADE.<br />

2<br />

1<br />

3<br />

CAVE<br />

(BELOW GRADE)<br />

7<br />

2<br />

MOAT<br />

MOAT<br />

8<br />

4<br />

7<br />

TAHR<br />

EXHIBIT<br />

CAVE<br />

N<br />

PROJECT BOUNDARY<br />

APPROXIMATE EDGE<br />

OF ROCKWORK AT<br />

EXISTING FINISH<br />

GRADE.<br />

OLD FINCH AVE<br />

1 0 1 2 3 4 meters<br />

POND<br />

3<br />

POND 4<br />

MEADOWVALE RD<br />

N<br />

POND<br />

5


PRZEWALSKI'S HORSE EXHIBITS<br />

PROTECT TREES WITHIN 6m OF<br />

WORK DURING WORK<br />

CAUCUSIAN<br />

TAHR<br />

EXHIBIT<br />

YURTS TO<br />

REMAIN<br />

CAVE<br />

PROTECT<br />

PLANTING<br />

POND 3<br />

PROTECT BARRIER<br />

EDGE<br />

EXHIBIT<br />

PROJECT BOUNDARY<br />

SIKA DEER<br />

EXHIBIT<br />

CAMEL<br />

HOLDING<br />

BUTTERFLY<br />

MEADOW<br />

PROJECT BOUNDARY<br />

PROJECT BOUNDARY<br />

EXISTING<br />

TIGER<br />

EXHIBIT<br />

PROJECT BOUNDARY<br />

APPROXIMATE EURASIA<br />

PANDA DELINEATION (SEE<br />

ST100.1). COORDINATE<br />

WORK WITHIN GIANT PANDA<br />

AREA WITH GIANT PANDA<br />

DRAWINGS.<br />

RED PANDA<br />

EXHIBIT<br />

KANGAROO<br />

EXHIBIT<br />

AUSTRAILASIA<br />

PAVILION<br />

TIGER<br />

EXHIBIT<br />

5 0 5 10 15 meters<br />

N<br />

OLD FINCH AVE<br />

PROJECT BOUNDARY<br />

POND<br />

3<br />

POND 4<br />

MEADOWVALE RD<br />

N<br />

POND<br />

5