16.09.2014 Views

caution - Toro

caution - Toro

caution - Toro

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONTINUES TO SHEET 2<br />

WHEN THE PTO SWITCH IS MOVED TO THE ENGAGE POSITION, PTO SWITCH<br />

CONTINUES TO SHEET 2<br />

CONTINUES TO SHEET 2<br />

(OPTIONAL CRUISE<br />

CONTROL KIT)<br />

(OPTIONAL CRUISE<br />

CONTROL KIT)<br />

TERMINALS 4 & 5 ARE MOMENTARILY CONNECTED ALLOWING A CURRENT<br />

PATH TO ENERGIZE THE PTO RELAY, THE DECK POSITION SWITCHES AND<br />

THE PTO SOLENOIDS. DIODES D1-B, D1-C AND D1 -D WILL THEN CREATE<br />

A LATCHING CIRCUIT TO KEEP THE PTO RELAY ENERGIZED WHEN THE PTO<br />

SWITCH IS IN THE ON POSITION.<br />

(OPTIONAL CRUISE<br />

CONTROL KIT)<br />

(OPTIONAL CRUISE<br />

CONTROL KIT)<br />

(IGNITION SWITCH IN RUN)<br />

(OPTIONAL CRUISE<br />

CONTROL KIT)<br />

FRONT DECK<br />

PTO SOLENOID<br />

(DISENGAGED)<br />

(NOT IN NEUTRAL)<br />

2WD SOLENOID<br />

LEFT DECK<br />

PTO SOLENOID<br />

(DECK LOWERED)<br />

RIGHT DECK<br />

PTO SOLENOID<br />

(OCCUPIED)<br />

(IN 4WD)<br />

(DECK LOWERED)<br />

PTO OVERTEMP<br />

SHUTDOWN RELAY<br />

CONTINUES TO SHEET 2<br />

WHEN THE CUTTING DECK LIFT LEVER IS MOVED TO LOWER THE DECK,<br />

THE DECK LOWER SWITCH CLOSES TO ENERGIZE THE DOWN LATCHING<br />

RELAY. THIS PROVIDES A CURRENT PATH FOR THE PTO SWITCH. THE DECK<br />

RAISE SWITCH AND DIODE D3 CREATE A LATCHING CIRCUIT TO KEEP THE<br />

DOWN LATCHING RELAY ENERGIZED. IF THE LIFT LEVER IS MOVED TO RAISE<br />

THE DECK, THE DOWN LATCHING RELAY IS DE -ENERGIZED PREVENTING<br />

AVAILABLE CURRENT FOR THE PTO CIRCUIT.<br />

Groundsmaster 4100--D<br />

Run (Mow) Circuits<br />

Power Current<br />

Control Current<br />

Indication Current<br />

Page 9 - 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!