caution - Toro
caution - Toro
caution - Toro
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Removal (Fig. 6)<br />
1. Position machine on a clean, level surface. Lower<br />
cutting deck and engage parking brake.<br />
3<br />
2. Fully raise wing deck, stop engine and remove key<br />
from the ignition switch. Remove three (3) washer head<br />
screws and shield strap that secure flex shield to wing<br />
deck. Lower wing deck.<br />
2<br />
3. Remove hydraulic motor from wing deck (see Cutting<br />
Deck Motor Removal in the Service and Repairs<br />
Section of Chapter 4 -- Hydraulic System).<br />
4. Remove cap screw and lock nut that secure lift cylinder<br />
clevis to the wing deck (Fig. 7).<br />
5. Remove switch shield (item 50) from center deck.<br />
1<br />
1. Hydraulic motor<br />
2. Flange head screw<br />
Figure 7<br />
3. Lift cylinder clevis<br />
2<br />
6. Support wing deck to prevent it from falling as links<br />
are removed.<br />
Front of center deck<br />
7. Remove cap screw (item 29) from pivot pin on upper<br />
end of both links. Cap screw on rear link also uses a flat<br />
washer (item 28).<br />
NOTE: When removing pivot pins from deck, note location<br />
of thrust washers (item 6) and hardened spacers<br />
(item 42).<br />
8. Remove flange nut (item 19) from carriage bolt (item<br />
26) and pull pivot pins (item 18) from deck. Locate and<br />
retrieve thrust washers (item 6) and hardened spacers<br />
(item 42) from between links and deck brackets.<br />
0.060” to 0.090”<br />
(1.5 to 2.2 mm)<br />
(wing lowered & latched)<br />
9. Slide the wing deck away from the center deck.<br />
10.If required, remove link(s) from wing deck by removing<br />
lock nut and flat washer that secure tapered stud to<br />
deck. Press tapered stud from deck to remove link assembly.<br />
Remove foam washer (item 42) and link skid.<br />
Installation (Fig. 6)<br />
Wing opens this way<br />
Figure 8<br />
1. Park machine on a clean, level surface. Stop engine,<br />
engage parking brake and remove key from the ignition<br />
switch.<br />
2. If links were removed from wing deck, thoroughly<br />
clean tapered stud on link and mounting boss of wing<br />
deck. Place foam washer on tapered stud and insert<br />
stud into deck mounting boss. Position link skid to stud<br />
and secure with flat washer and lock nut. Torque lock nut<br />
from 160 to 180 ft -lb (217 to 244 N -m).<br />
NOTE: Pivot latches (item 8) may need to be manually<br />
opened prior to wing deck installation. If necessary, use<br />
a pry bar to carefully open latch.<br />
3. Position the wing deck to the center deck.<br />
1<br />
2<br />
Figure 9<br />
0.380” to 0.620”<br />
(9.7 to 15.7 mm)<br />
1. Wing deck blade 2. Center deck blade<br />
Cutting Deck<br />
Groundsmaster 4100--D<br />
Page 8 - 11<br />
Cutting Deck