16.09.2014 Views

caution - Toro

caution - Toro

caution - Toro

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Removal (Fig. 6)<br />

1. Position machine on a clean, level surface. Lower<br />

cutting deck and engage parking brake.<br />

3<br />

2. Fully raise wing deck, stop engine and remove key<br />

from the ignition switch. Remove three (3) washer head<br />

screws and shield strap that secure flex shield to wing<br />

deck. Lower wing deck.<br />

2<br />

3. Remove hydraulic motor from wing deck (see Cutting<br />

Deck Motor Removal in the Service and Repairs<br />

Section of Chapter 4 -- Hydraulic System).<br />

4. Remove cap screw and lock nut that secure lift cylinder<br />

clevis to the wing deck (Fig. 7).<br />

5. Remove switch shield (item 50) from center deck.<br />

1<br />

1. Hydraulic motor<br />

2. Flange head screw<br />

Figure 7<br />

3. Lift cylinder clevis<br />

2<br />

6. Support wing deck to prevent it from falling as links<br />

are removed.<br />

Front of center deck<br />

7. Remove cap screw (item 29) from pivot pin on upper<br />

end of both links. Cap screw on rear link also uses a flat<br />

washer (item 28).<br />

NOTE: When removing pivot pins from deck, note location<br />

of thrust washers (item 6) and hardened spacers<br />

(item 42).<br />

8. Remove flange nut (item 19) from carriage bolt (item<br />

26) and pull pivot pins (item 18) from deck. Locate and<br />

retrieve thrust washers (item 6) and hardened spacers<br />

(item 42) from between links and deck brackets.<br />

0.060” to 0.090”<br />

(1.5 to 2.2 mm)<br />

(wing lowered & latched)<br />

9. Slide the wing deck away from the center deck.<br />

10.If required, remove link(s) from wing deck by removing<br />

lock nut and flat washer that secure tapered stud to<br />

deck. Press tapered stud from deck to remove link assembly.<br />

Remove foam washer (item 42) and link skid.<br />

Installation (Fig. 6)<br />

Wing opens this way<br />

Figure 8<br />

1. Park machine on a clean, level surface. Stop engine,<br />

engage parking brake and remove key from the ignition<br />

switch.<br />

2. If links were removed from wing deck, thoroughly<br />

clean tapered stud on link and mounting boss of wing<br />

deck. Place foam washer on tapered stud and insert<br />

stud into deck mounting boss. Position link skid to stud<br />

and secure with flat washer and lock nut. Torque lock nut<br />

from 160 to 180 ft -lb (217 to 244 N -m).<br />

NOTE: Pivot latches (item 8) may need to be manually<br />

opened prior to wing deck installation. If necessary, use<br />

a pry bar to carefully open latch.<br />

3. Position the wing deck to the center deck.<br />

1<br />

2<br />

Figure 9<br />

0.380” to 0.620”<br />

(9.7 to 15.7 mm)<br />

1. Wing deck blade 2. Center deck blade<br />

Cutting Deck<br />

Groundsmaster 4100--D<br />

Page 8 - 11<br />

Cutting Deck

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!