Financial Reporting for SWITCH-Asia projects - presentation
Financial Reporting for SWITCH-Asia projects - presentation Financial Reporting for SWITCH-Asia projects - presentation
European Union Implementation of grants contracts by beneficiaries 1
- Page 2 and 3: Agenda PART I Basic principles Ge
- Page 4 and 5: The principle of non-cumulative No
- Page 6 and 7: The principle of co-financing Grant
- Page 8 and 9: Agenda PART I Basic principles Ge
- Page 10 and 11: Key responsibilities of the main pa
- Page 12 and 13: Contract-award Procedures If implem
- Page 14 and 15: Nationality Rule Definition: Partic
- Page 16 and 17: Contract-award Procedures Services
- Page 18 and 19: Contract-award Procedures < €200,
- Page 20 and 21: Eligible costs Definition: • Real
- Page 22 and 23: Eligible costs • Indicated in the
- Page 24 and 25: Eligible or ineligible? Which of th
- Page 26 and 27: Preparation of The budget 26
- Page 28 and 29: The budget • Article 14 of Genera
- Page 30 and 31: Agenda PART I Basic principles Ge
- Page 32 and 33: Pre-financings conditions of paymen
- Page 34 and 35: First pre-financing Maximum amount
- Page 36 and 37: First pre-financing Payment delays
- Page 38 and 39: Further instalments of pre-financin
- Page 40 and 41: Further instalments of pre-financin
- Page 42 and 43: Further instalments of pre-financin
- Page 44 and 45: Further instalments of pre-financin
- Page 46 and 47: Further instalments of pre-financin
- Page 48 and 49: Necessary documents: Article 15.1.
- Page 50 and 51: Final payment Determination of fina
European Union<br />
Implementation of grants<br />
contracts by beneficiaries<br />
1
Agenda<br />
PART I<br />
Basic principles<br />
General Obligations<br />
Contract-award procedures<br />
Eligible costs<br />
Payment procedures<br />
Technical and <strong>Financial</strong> reporting<br />
PART II<br />
Grants 2013<br />
2
What is a grant?<br />
<strong>Financial</strong> contribution, by way of donation,<br />
in order to co-finance:<br />
action<br />
3
The principle of non-cumulative<br />
No single beneficiary may receive more than one grant<br />
4<br />
financed by the European Union <strong>for</strong> a given action.
The principle of non-retroactive<br />
Grants may only cover costs incurred after the date<br />
on which the contract is signed.<br />
5
The principle of co-financing<br />
Grants may not finance the entire cost of the action<br />
6
The principle of non-profit<br />
Grants may not have the purpose or effect of<br />
producing a profit <strong>for</strong> the beneficiary<br />
(profit = surplus of receipts over the costs)<br />
7
Agenda<br />
PART I<br />
Basic principles<br />
General Obligations<br />
Contract-award procedures<br />
Eligible costs<br />
Payment procedures<br />
Technical and <strong>Financial</strong> reporting<br />
PART II<br />
Grants 2013<br />
8
I<br />
Contractual framework<br />
Description of the action<br />
II General Conditions<br />
III Budget<br />
IV Contract-award procedures<br />
V<br />
Standard request <strong>for</strong> payment<br />
VI Template <strong>for</strong> narrative and financial reports<br />
(interim and final)<br />
VII Template <strong>for</strong> expenditure verification<br />
VIII Template <strong>for</strong> financial guarantee<br />
In case of doubt, read carefully all the<br />
documents !<br />
9
Key responsibilities of the main parties<br />
in project implementation<br />
The European Union<br />
• Contracting Authority<br />
• Endorses all documents<br />
required by the grant contract<br />
• Makes payments as required<br />
in the grant contract and after<br />
approval of relevant reports<br />
• Conducts financial and<br />
technical monitoring of the<br />
project<br />
• Conducts necessary ex-post<br />
checks on Beneficiary’s<br />
compliance with contractual<br />
requirements<br />
The Beneficiary<br />
• Directly responsible <strong>for</strong><br />
project implementation<br />
• Ensures project is carried out<br />
according to the action plan,<br />
indicators, and resources set<br />
out in Description of Action<br />
in Annex 1<br />
• Provides interim and final<br />
reports and request <strong>for</strong><br />
payments<br />
• Facilitates monitoring by EU<br />
• Ensures an adequate project<br />
publicity/visibility<br />
10
Agenda<br />
PART I<br />
Basic principles<br />
General Obligations<br />
Contract-award procedures<br />
Eligible costs<br />
Payment procedures<br />
Technical and <strong>Financial</strong> reporting<br />
PART II<br />
Grants 2013<br />
11
Contract-award Procedures<br />
If implementation of the Action involves the<br />
conclusion of contracts by the Beneficiary, the<br />
contract-award procedures set out in<br />
Annex IV shall apply.<br />
12
Contract-award Procedures<br />
General Principles:<br />
• BEST VALUE FOR MONEY = the contract must be<br />
awarded to the technically compliant tender being<br />
the most economically advantageous one (ie, the<br />
tender offering the best price-quality ratio);<br />
• following the principles of transparency and fair<br />
competition <strong>for</strong> potential contractors and taking care<br />
to avoid any conflicts of interest;<br />
• must comply with the rules set out in Annex IV which<br />
includes rules of origin;<br />
• In the event of failure to comply with the above<br />
rules, expenditure on the operations in question is<br />
not eligible <strong>for</strong> Community financing;<br />
• The EC will carry out ex post checks on Beneficiaries'<br />
compliance with the rules.<br />
13
Nationality Rule<br />
Definition:<br />
Participation in tender procedures is open on equal terms to natural<br />
and legal persons of certain nationalities.<br />
Applicable regulation:<br />
DCI: Financing instrument <strong>for</strong> the cooperation development<br />
(Regulation (EC) N° 1905/2006 of the EP and of the Council - OJ L<br />
378/1 of 27.12.2006)<br />
http://ec.europa.eu/europeaid/work/procedures/implementation/eligibility/index_en.htm<br />
• All European Union member States<br />
Includes but is not limited to:<br />
• Malaysia, China, India, Indonesia, Philippines, Thailand<br />
• Exclude Singapore, Hong Kong, Japan, South Korea (= not eligible)<br />
14
Rule of Origin (supplies)<br />
Definition<br />
Supplies must originate from certain states, and contractors must<br />
present proof of origin.<br />
Applicable regulation:<br />
DCI: Financing instrument <strong>for</strong> the cooperation development<br />
(Regulation (EC) N° 1905/2006 of the EP and of the Council - OJ L<br />
378/1 of 27.12.2006)<br />
http://ec.europa.eu/europeaid/work/procedures/implementation/eligibility/index_en.htm<br />
Includes but is not limited to:<br />
• All European Union member States<br />
• Malaysia, China, India, Indonesia, Philippines, Thailand<br />
• Exclude Singapore, Hong Kong, Japan, South Korea (= not eligible)<br />
15
Contract-award Procedures<br />
Services<br />
> €200,000<br />
Restricted<br />
international<br />
tender,<br />
following<br />
publication of<br />
procurement<br />
notice<br />
< €200,000 but > €10,000<br />
Negotiated procedure without<br />
publication<br />
≤ €10,000<br />
Single tender<br />
Supplies<br />
> €150,000<br />
International<br />
open tender<br />
procedure,<br />
following<br />
publication of<br />
procurement<br />
notice<br />
€10,000<br />
Negotiated<br />
procedure<br />
without<br />
publication<br />
≤ €10,000<br />
Single tender<br />
Works<br />
≥ €5,000,000<br />
International<br />
open tender<br />
procedure,<br />
following<br />
publication of<br />
procurement<br />
notice<br />
€10,000<br />
Negotiated<br />
procedure<br />
without<br />
publication<br />
≤ €10,000<br />
Single tender<br />
16
Contract-award Procedures<br />
≤ €10,000 Single tender<br />
The Beneficiary may place orders on the<br />
basis of a single tender<br />
This rule does not prohibit the<br />
Beneficiary to consult more than one<br />
service provider/supplier<br />
17
Contract-award Procedures<br />
< €200,000 but > €10,000 Negotiated<br />
procedure (service contracts)<br />
• The Beneficiary does not have to publish the<br />
procurement notice;<br />
• The Beneficiary consults at least three suppliers of its<br />
choice and negotiates the terms of the contract with<br />
one or more of them;<br />
• The Terms of References (TORs) and/or Technical<br />
Specifications must be drafted clearly.<br />
• The time-limits <strong>for</strong> receipt of offers and requests to<br />
participate must be long enough to allow interested<br />
parties a reasonable and appropriate period to prepare<br />
and submit their tenders.<br />
18
Agenda<br />
PART I<br />
Basic principles<br />
General Obligations<br />
Contract-award procedures<br />
Eligible costs<br />
Payment procedures<br />
Technical and <strong>Financial</strong> reporting<br />
PART II<br />
Grants 2013<br />
19
Eligible costs<br />
Definition:<br />
• Real Costs incurred by the beneficiary<br />
• During implementation of action<br />
• Indicated in the estimated budget<br />
• Necessary <strong>for</strong> implementing action<br />
• Identifiable + verifiable<br />
• Compliant with accounting standards<br />
• Reasonable and justified<br />
20
Eligible costs<br />
Definition:<br />
• Incurred by the beneficiary<br />
• During implementation of action<br />
• Indicated in the estimated budget<br />
• Necessary <strong>for</strong> implementing action<br />
• Identifiable + verifiable<br />
• Compliant with accounting standards<br />
• Reasonable and justified<br />
21
Eligible costs<br />
• Indicated in the estimated overall budget<br />
To be considered eligible, all costs must have<br />
been entered as eligible costs in the estimated<br />
budget.<br />
Any amendment of the estimated budget (higher<br />
than 15% per heading) which would alter the<br />
action or work programme planned may be<br />
allowed only if it has been subject of a written<br />
supplementary agreement between the parties.<br />
22
Direct eligible costs<br />
Necessary to implement the action<br />
• Staff – Heading 1<br />
• Travel expenses – Heading 2<br />
• Equipment and supplies – Heading 3<br />
• Local office – Heading 4<br />
• Other costs and services – Heading 5<br />
• Others - Heading 6<br />
Real costs : analytical accounting system<br />
Indirect eligible costs<br />
Flat-rate : max 7% of direct costs<br />
23
Eligible or ineligible?<br />
Which of the following can be considered eligible <strong>for</strong> a grant financed by the Commission:<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
cost of bank transactions<br />
cost of external auditing<br />
credits to third parties<br />
cost of translation<br />
provision <strong>for</strong> reserve<br />
currency exchange losses<br />
cost of financial guarantee<br />
purchase of land or buildings (real estate)<br />
cost of electricity <strong>for</strong> the part of building used to implement the project<br />
debts and provisions <strong>for</strong> losses<br />
security cost of the building <strong>for</strong> the part used to implement the project<br />
costs covered by another action;<br />
administrative and management cost<br />
cost of new computers to be used only by the project staff<br />
insurance cost<br />
maintenance cost<br />
interest owed<br />
rent<br />
24
Eligible or ineligible?<br />
Which of the following can be considered eligible <strong>for</strong> a grant financed by the Commission:<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
cost of bank transactions<br />
cost of external auditing<br />
credits to third parties<br />
cost of translation<br />
provision <strong>for</strong> reserve<br />
currency exchange losses<br />
cost of financial guarantee<br />
purchase of land or buildings (real estate)<br />
cost of electricity <strong>for</strong> the part of building used to implement the project<br />
debts and provisions <strong>for</strong> losses<br />
security cost of the building <strong>for</strong> the part used to implement the project<br />
costs covered by another action;<br />
administrative and management cost<br />
cost of new computers to be used only by the project staff<br />
insurance cost<br />
maintenance cost<br />
interest owed<br />
rent<br />
25
Preparation of The budget<br />
26
The budget<br />
Question :<br />
You are analyzing the Human<br />
Resources heading of the budget<br />
that has been distributed. What<br />
are your remarks? Are there any<br />
not acceptable costs?<br />
27
The budget<br />
• Article 14 of General Conditions:<br />
Direct costs (Art. 14.2.)<br />
• Human Resources<br />
• Actual gross salaries including social security<br />
charges and other remuneration-related costs<br />
• It concerns staff from Beneficiary or its<br />
partners<br />
• They must not exceed those normally borne by<br />
the Beneficiary or its partners<br />
• No fees accepted!<br />
28
The Budget<br />
• Article 14 of General Conditions:<br />
Direct costs (Art. 14.2.)<br />
• Subsistence costs<br />
• Per diems:<br />
• Covers accommodation, meals and local travel<br />
within the place of mission<br />
• requires an overnight stay away from the base<br />
of operations<br />
• Must not exceed the rates at the time of<br />
contract signature and those normally borne<br />
by the beneficiary or its partners<br />
29
Agenda<br />
PART I<br />
Basic principles<br />
General Obligations<br />
Contract-award procedures<br />
Eligible costs<br />
Payment procedures<br />
Technical and <strong>Financial</strong> reporting<br />
PART II<br />
Grants 2013<br />
30
Payment Procedures<br />
See Article 4 of the Special Conditions and<br />
Article 15 of the General Conditions<br />
1. Initial Pre-financing, paid within 45 days, as from<br />
the date of reception by the Contracting authority of<br />
signed contract<br />
2. Further Pre-financing, paid within 45 days of the<br />
Contracting Authority approving interim report<br />
3. Final Payment, paid within 45 days of the<br />
Contracting Authority approving final report<br />
31
Pre-financings<br />
conditions of payments<br />
• Detailed in the grant contract<br />
• Determined by:<br />
• Duration<br />
• Progress of the action<br />
• Costs incurred by the beneficiary<br />
32
1. First pre-financing<br />
2. Further instalments of pre-financing<br />
3. Final payment<br />
33
First pre-financing<br />
Maximum amount to pay (Art 15.1. GC)<br />
Option 1: < 12 months & < 100.000 EUR<br />
80% of the EC contribution<br />
Option 2: >12 months & > 100.000 EUR<br />
80% of the part of the estimated budget <strong>for</strong> Year 1<br />
financed by Contracting Authority<br />
34
First pre-financing<br />
Reception of the signed contract<br />
Check correct amounts in Article 4.2. of Special<br />
Conditions<br />
Article 4.3. of Special Conditions no need of<br />
payment request if Art 4.3. reads as follows:<br />
“The first installment of pre-financing, shall be paid to<br />
the Beneficiary within 45 days, as from the date of<br />
reception by the Contracting authority of signed<br />
Contract…”<br />
Original payment request, if applicable<br />
Only in the absence of Article 4.3. (see above)<br />
35
First pre-financing<br />
Payment delays<br />
Contractual deadlines: Article 4.3. of the<br />
Special Conditions<br />
45 days after receipt of signed contract<br />
36
1. First pre-financing<br />
2. Further instalments of pre-financing<br />
3. Final payment<br />
37
Further instalments of pre-financing<br />
Amount to pay (Article 15.1. of GC)<br />
Designed to normally cover the Beneficiary’s<br />
financing needs <strong>for</strong> each 12 months period<br />
Percentage to eligible costs laid down in Article<br />
3.2. of SC<br />
38
Further instalments of pre-financing<br />
<br />
Necessary documents:<br />
Article 15.1. of General Conditions<br />
• Request <strong>for</strong> payment con<strong>for</strong>ming to Annex V<br />
• Expenditure Verification report, if required under Art<br />
15.6<br />
• Interim report<br />
• Budget <strong>for</strong>ecast <strong>for</strong> the next 12 month period<br />
39
Further instalments of pre-financing<br />
Check amount to be paid<br />
Art. 15.1. of GC:<br />
-Rule of 70%<br />
• Further instalment of pre-financing if part of the<br />
expenditure actually incurred funded by the EC = 70% of<br />
previous payment and 100% of any previous payment<br />
• Where consumption < 70%, the next instalment of pre-<br />
financing payment is reduced by unused amount of<br />
previous instalment of pre-financing.<br />
-Total sum of pre-financing never > 90% of the total<br />
amount financed by the Contracting Authority.<br />
40
Further instalments of pre-financing<br />
<strong>Reporting</strong> Obligations<br />
Article 2 of GC:<br />
• The reports must contain a narrative and a financial<br />
section and shall con<strong>for</strong>m to the model in Annex VI<br />
• Every request <strong>for</strong> payment must be accompanied by<br />
an interim report<br />
• Any additional reporting requirement shall be set out<br />
in the Special Conditions<br />
• Every 12 month-period If the Beneficiary fails to<br />
comply with this obligation, he must in<strong>for</strong>m the<br />
Contracting Authority of the reasons and provide a<br />
summary of progress in the Action.<br />
41
Further instalments of pre-financing<br />
Expenditure Verification report<br />
Definition: report on the verification of the<br />
Action´s expenditure produced by an approved<br />
auditor who meets the specific conditions of ToR.<br />
Purpose:<br />
The Auditor examines the factual in<strong>for</strong>mation in the<br />
<strong>Financial</strong> Report of the Beneficiary and compares it with<br />
the terms and conditions of the Grant Contract.<br />
It is not an exhaustive control but based on a sampling<br />
methodology.<br />
He does not provide an audit opinion. The EC will<br />
assess itself the factual findings by budgetary heading<br />
and draws its own conclusions.<br />
42
Further instalments of pre-financing<br />
Article 15.6. of General Conditions<br />
Based on the expenditure verification report the<br />
Contracting Authority determines the total amount<br />
of eligible expenditure which may be deducted from<br />
the total sum of pre-financing under the contract<br />
(clearance).<br />
43
Further instalments of pre-financing<br />
Expenditure Verification report<br />
When: (Art. 15.6)<br />
• Any request <strong>for</strong> pre-financing in case of grants > EUR<br />
750.000<br />
• Any final report <strong>for</strong> grants > EUR 100 000<br />
Template: in line with model in Annex VII<br />
44
Further instalments of pre-financing<br />
Article 15.7, 15.9, 15.10 and 15.11 of<br />
General Conditions<br />
<br />
Any interest or equivalent benefits accruing from<br />
pre-financing paid shall be mentioned in the interim<br />
and final reports<br />
Conditions:<br />
Pre-financing < 250 000 EUR<br />
not due to the EC and may be used to the Action<br />
250 000 EUR < Pre-financing < 750 000 EUR<br />
deducted from the payment of the balance<br />
Pre-financing > 750 000 EUR<br />
recovery at the end of each financial year<br />
45
Further instalments of pre-financing<br />
Main further checks:<br />
Compliance with templates (Annex VI)<br />
Amounts are arithmetically correct<br />
Expenditure incurred within implementation period<br />
No double-counting of direct costs in previous<br />
reports<br />
Exchange rates applied are correct (Art. 15.8. of<br />
GC)<br />
Transfers limit to 15% of initial amount of main<br />
heading (Art. 9.2. of GC)<br />
Contingency reserve authorised in advanced (Art<br />
14.3 of GC)<br />
46
1. First pre-financing<br />
2. Further instalments of pre-financing<br />
3. Final payment<br />
47
Necessary documents:<br />
Article 15.1. of the General Conditions:<br />
• Request <strong>for</strong> payment of the balance (Annex V)<br />
• Expenditure verification report<br />
• Final report<br />
Final payment<br />
Contractual Conditions<br />
• Transfer of ownership, if applicable (Art 7.3. =><br />
equipment and vehicles with purchase cost > EUR<br />
5000)<br />
Approval by EC of the final implementation<br />
report and validation of expenditure in the final<br />
statement<br />
All work done must correspond to the objectives laid<br />
down in the grant agreement.<br />
Conclusions from Ops will be taken into account when<br />
assessing financial report<br />
48
Final payment<br />
Contractual Conditions<br />
Main further checks:<br />
Respect of deadline <strong>for</strong> submission of final report: 3 or 6<br />
months after end date of implementation (Art. 2.3. of<br />
G.C.)<br />
Compliance with templates (Annex VI)<br />
Amounts are arithmetically correct<br />
No double-counting of direct costs in previous reports<br />
Exchange rates applied are correct (Art. 15.8. of GC)<br />
Transfers limit to 15% of initial amount of main heading<br />
except taxes (Art. 9.2. of GC)<br />
Contingency reserve authorised in advanced (Art 14.3<br />
of GC)<br />
Transfers of ownership attached to the report (Art 7.3.)<br />
49
Final payment<br />
Determination of final amount<br />
Co-financing (Art. 3 of SC):<br />
The amount does not exceed the maximum<br />
absolute value <strong>for</strong> the Community Grant<br />
The % of the total eligible costs is also<br />
respected<br />
50
Final payment<br />
Determination of final amount<br />
The amount of the grant becomes final:<br />
After acceptance of the final reports !<br />
Possible notified Suspension by Contracting<br />
Authority<br />
clarification/ corrections maximum 30 days<br />
Art 2.3 / 15.1.CG<br />
51
Agenda<br />
PART I<br />
Basic principles<br />
General Obligations<br />
Contract-award procedures<br />
Eligible costs<br />
Payment procedures<br />
Technical and <strong>Financial</strong> reporting<br />
PART II<br />
Grants 2013<br />
52
<strong>Reporting</strong><br />
• There are 2 types of reporting (Article 2.1 General Conditions):<br />
1. Interim Report :<br />
• A mid-term report (generally covers 12 months period)<br />
• Consists of narrative and financial sections<br />
• If no expenditure verification report required, the<br />
financial section is accompanied by a list detailing each<br />
item of expenditure incurred in the period covered by<br />
the report, and indicating <strong>for</strong> each its title, amount,<br />
relevant heading in the Budget of the Action and the<br />
reference of the justifying document<br />
• Should be submitted within 30 days of the end of the<br />
period covered by the report<br />
2. Final Report :<br />
• Covers the entire period of implementation<br />
• Summarizes and updates all the in<strong>for</strong>mation<br />
contained in the Interim Reports completed with the<br />
last period; references to previous reports will not be<br />
considered<br />
• Consists of narrative and financial sections<br />
• Must be submitted within 3 to 6 months after the end<br />
of implementation period.<br />
53
<strong>Reporting</strong><br />
Important note:<br />
The in<strong>for</strong>mation provided in the narrative report<br />
must correspond to the financial in<strong>for</strong>mation<br />
that appears in the financial report<br />
54
<strong>Reporting</strong><br />
• Report should:<br />
- con<strong>for</strong>m to the <strong>for</strong>mat in Annex VI<br />
- be drafted in English<br />
- be clear and concise<br />
- focus on assessment of progress towards achieving<br />
results (“results-based reports”), and not simply list<br />
activities undertaken and inputs provided<br />
- cover the activities as a whole regardless of which<br />
part of it is financed by the EU<br />
- Include details on the progress of visibility activities<br />
• Any report will be considered approved if there is no<br />
written approval by the EU within 45 days of submission<br />
• The EU may request additional in<strong>for</strong>mation at any time and<br />
the in<strong>for</strong>mation must be supplied within 30 days of the<br />
request<br />
55
<strong>Financial</strong> Report<br />
• con<strong>for</strong>m to the <strong>for</strong>mat in Annex VI<br />
• conversion into euro of the real costs shall be done at the<br />
rate made up by the average of the rates published in<br />
In<strong>for</strong>Euro <strong>for</strong> the months covered by the relevant report<br />
In<strong>for</strong>Euro:<br />
http://ec.europa.eu/budget/in<strong>for</strong>euro/index.cfm<br />
Month Currency Rate Average<br />
déc-11 EUR/SGD 1,7306<br />
nov-11 EUR/SGD 1,7588<br />
oct-11 EUR/SGD 1,7626<br />
sept-11 EUR/SGD 1,7399<br />
août-11 EUR/SGD 1,7169<br />
juil-11 EUR/SGD 1,7799<br />
juin-11 EUR/SGD 1,7613<br />
1,755725<br />
mai-11 EUR/SGD 1,8191<br />
avr-11 EUR/SGD 1,7782<br />
mars-11 EUR/SGD 1,754<br />
févr-11 EUR/SGD 1,7542<br />
janv-11 EUR/SGD 1,7132<br />
56
GRANTS 2013<br />
57
Main changes: Call For Proposals<br />
Eligibility of applicants<br />
New:<br />
- Multi-Beneficiary<br />
contract<br />
- Beneficiary (ies),<br />
coordinator<br />
- Affiliated entities<br />
58
Main changes: Call For Proposals<br />
BEFORE 2013<br />
implementing<br />
partner 1<br />
Only 1 LEF is entered in the system<br />
Applicant<br />
CONTRACT is<br />
signed by<br />
applicant only<br />
(Beneficiary)<br />
implementing<br />
partner 2<br />
59
Main changes: Call For Proposals<br />
AS FROM 01.01.2013<br />
MULTI-BENEFICIARY CASE<br />
All the signatory LEFs are entered in the<br />
system.<br />
Co-applicant 1<br />
Mandate<br />
Lead Applicant<br />
CONTRACT is<br />
signed by all the<br />
beneficiaries<br />
Mandate<br />
Co-applicant 2<br />
60
Main changes: Call For Proposals<br />
MULTI – BENEFICIARY GRANT CONTRACT<br />
= More than one beneficiary is part of the<br />
contract<br />
61
Main changes: Call For Proposals<br />
Applicant/ Coordinator:<br />
- Plays the role of lead applicant/ Main beneficiary<br />
- Gets a mandate from the rest of co-applicants<br />
:<br />
- To submit the proposal<br />
- To sign the contract<br />
- To represent all during execution of the<br />
contract<br />
- Assumes all financial responsibility of the contract<br />
62
Main changes: Call For Proposals<br />
AS FROM 01.01.2013<br />
MULTI-BENEFICIARY CASE WITH AFFILIATED ENTITIES<br />
Note : Applicants and<br />
Beneficiaries may (or<br />
not) have affiliated<br />
entities, but these never<br />
sign the contract.<br />
All the signatory LEFs are entered in the<br />
system.<br />
Co-applicant 1<br />
Affiliated Entity 1<br />
Affiliated Entity 2<br />
Lead Applicant<br />
CONTRACT is<br />
signed by all the<br />
beneficiaries<br />
Co-applicant 2<br />
Affiliated Entity 3<br />
63
Main changes: Call For Proposals<br />
Affilitiated enities:<br />
- They are third parties to the contract but benefit<br />
partially from beneficiaries rights (eligibility<br />
of<br />
costs)<br />
- Entities <strong>for</strong>ming part of a beneficiary, with legal<br />
or capital link with the beneficiary<br />
- Their costs are considered costs of the entity to<br />
which they are affiliated<br />
64
Main changes: Call <strong>for</strong> Proposal<br />
Simplified cost options<br />
(lump sums, unit costs, flat-rate<br />
funding)<br />
- Limited to € 60.000 per beneficiary to the grant<br />
contract (exclusive of 7% of indirect costs)<br />
- Proposed by the beneficiary<br />
- Approval of Contracting Authority during contract<br />
phase<br />
- Guidelines and check-list (NEW annex K)<br />
- The used methods should be clearly described<br />
65
Main changes: Contractual matters<br />
Interest on pre-financing:<br />
- Not due to the Union any more<br />
- No need to open interest bearing accounts<br />
- No more reporting<br />
Payments deadlines:<br />
- One single time limit<br />
- No more sub limits <strong>for</strong> approval<br />
- 30/60/90 depending on the type of payment<br />
66
Main changes: Contractual matters<br />
Expenditure verification report needed with<br />
Previous:<br />
Any request <strong>for</strong> pre-financing<br />
: > € 750 000<br />
New:<br />
Any request <strong>for</strong> pre-financing: > € 5 000 000<br />
67
Main changes: Contractual matters<br />
‣ Amendments to the contracts:<br />
Ceiling increased from 15% to 25% <strong>for</strong> transfers<br />
between main budget headings<br />
Not to be used to modify:<br />
- Amounts or rates of the simplified cost options<br />
- Contributions in kind<br />
- Indirect costs 68
shana.IMPENS@ec.europa.eu<br />
69
Thank You<br />
70