Financial Reporting for SWITCH-Asia projects - presentation

Financial Reporting for SWITCH-Asia projects - presentation Financial Reporting for SWITCH-Asia projects - presentation

switch.asia.eu
from switch.asia.eu More from this publisher
07.09.2014 Views

European Union Implementation of grants contracts by beneficiaries 1

European Union<br />

Implementation of grants<br />

contracts by beneficiaries<br />

1


Agenda<br />

PART I<br />

Basic principles<br />

General Obligations<br />

Contract-award procedures<br />

Eligible costs<br />

Payment procedures<br />

Technical and <strong>Financial</strong> reporting<br />

PART II<br />

Grants 2013<br />

2


What is a grant?<br />

<strong>Financial</strong> contribution, by way of donation,<br />

in order to co-finance:<br />

action<br />

3


The principle of non-cumulative<br />

No single beneficiary may receive more than one grant<br />

4<br />

financed by the European Union <strong>for</strong> a given action.


The principle of non-retroactive<br />

Grants may only cover costs incurred after the date<br />

on which the contract is signed.<br />

5


The principle of co-financing<br />

Grants may not finance the entire cost of the action<br />

6


The principle of non-profit<br />

Grants may not have the purpose or effect of<br />

producing a profit <strong>for</strong> the beneficiary<br />

(profit = surplus of receipts over the costs)<br />

7


Agenda<br />

PART I<br />

Basic principles<br />

General Obligations<br />

Contract-award procedures<br />

Eligible costs<br />

Payment procedures<br />

Technical and <strong>Financial</strong> reporting<br />

PART II<br />

Grants 2013<br />

8


I<br />

Contractual framework<br />

Description of the action<br />

II General Conditions<br />

III Budget<br />

IV Contract-award procedures<br />

V<br />

Standard request <strong>for</strong> payment<br />

VI Template <strong>for</strong> narrative and financial reports<br />

(interim and final)<br />

VII Template <strong>for</strong> expenditure verification<br />

VIII Template <strong>for</strong> financial guarantee<br />

In case of doubt, read carefully all the<br />

documents !<br />

9


Key responsibilities of the main parties<br />

in project implementation<br />

The European Union<br />

• Contracting Authority<br />

• Endorses all documents<br />

required by the grant contract<br />

• Makes payments as required<br />

in the grant contract and after<br />

approval of relevant reports<br />

• Conducts financial and<br />

technical monitoring of the<br />

project<br />

• Conducts necessary ex-post<br />

checks on Beneficiary’s<br />

compliance with contractual<br />

requirements<br />

The Beneficiary<br />

• Directly responsible <strong>for</strong><br />

project implementation<br />

• Ensures project is carried out<br />

according to the action plan,<br />

indicators, and resources set<br />

out in Description of Action<br />

in Annex 1<br />

• Provides interim and final<br />

reports and request <strong>for</strong><br />

payments<br />

• Facilitates monitoring by EU<br />

• Ensures an adequate project<br />

publicity/visibility<br />

10


Agenda<br />

PART I<br />

Basic principles<br />

General Obligations<br />

Contract-award procedures<br />

Eligible costs<br />

Payment procedures<br />

Technical and <strong>Financial</strong> reporting<br />

PART II<br />

Grants 2013<br />

11


Contract-award Procedures<br />

If implementation of the Action involves the<br />

conclusion of contracts by the Beneficiary, the<br />

contract-award procedures set out in<br />

Annex IV shall apply.<br />

12


Contract-award Procedures<br />

General Principles:<br />

• BEST VALUE FOR MONEY = the contract must be<br />

awarded to the technically compliant tender being<br />

the most economically advantageous one (ie, the<br />

tender offering the best price-quality ratio);<br />

• following the principles of transparency and fair<br />

competition <strong>for</strong> potential contractors and taking care<br />

to avoid any conflicts of interest;<br />

• must comply with the rules set out in Annex IV which<br />

includes rules of origin;<br />

• In the event of failure to comply with the above<br />

rules, expenditure on the operations in question is<br />

not eligible <strong>for</strong> Community financing;<br />

• The EC will carry out ex post checks on Beneficiaries'<br />

compliance with the rules.<br />

13


Nationality Rule<br />

Definition:<br />

Participation in tender procedures is open on equal terms to natural<br />

and legal persons of certain nationalities.<br />

Applicable regulation:<br />

DCI: Financing instrument <strong>for</strong> the cooperation development<br />

(Regulation (EC) N° 1905/2006 of the EP and of the Council - OJ L<br />

378/1 of 27.12.2006)<br />

http://ec.europa.eu/europeaid/work/procedures/implementation/eligibility/index_en.htm<br />

• All European Union member States<br />

Includes but is not limited to:<br />

• Malaysia, China, India, Indonesia, Philippines, Thailand<br />

• Exclude Singapore, Hong Kong, Japan, South Korea (= not eligible)<br />

14


Rule of Origin (supplies)<br />

Definition<br />

Supplies must originate from certain states, and contractors must<br />

present proof of origin.<br />

Applicable regulation:<br />

DCI: Financing instrument <strong>for</strong> the cooperation development<br />

(Regulation (EC) N° 1905/2006 of the EP and of the Council - OJ L<br />

378/1 of 27.12.2006)<br />

http://ec.europa.eu/europeaid/work/procedures/implementation/eligibility/index_en.htm<br />

Includes but is not limited to:<br />

• All European Union member States<br />

• Malaysia, China, India, Indonesia, Philippines, Thailand<br />

• Exclude Singapore, Hong Kong, Japan, South Korea (= not eligible)<br />

15


Contract-award Procedures<br />

Services<br />

> €200,000<br />

Restricted<br />

international<br />

tender,<br />

following<br />

publication of<br />

procurement<br />

notice<br />

< €200,000 but > €10,000<br />

Negotiated procedure without<br />

publication<br />

≤ €10,000<br />

Single tender<br />

Supplies<br />

> €150,000<br />

International<br />

open tender<br />

procedure,<br />

following<br />

publication of<br />

procurement<br />

notice<br />

€10,000<br />

Negotiated<br />

procedure<br />

without<br />

publication<br />

≤ €10,000<br />

Single tender<br />

Works<br />

≥ €5,000,000<br />

International<br />

open tender<br />

procedure,<br />

following<br />

publication of<br />

procurement<br />

notice<br />

€10,000<br />

Negotiated<br />

procedure<br />

without<br />

publication<br />

≤ €10,000<br />

Single tender<br />

16


Contract-award Procedures<br />

≤ €10,000 Single tender<br />

The Beneficiary may place orders on the<br />

basis of a single tender<br />

This rule does not prohibit the<br />

Beneficiary to consult more than one<br />

service provider/supplier<br />

17


Contract-award Procedures<br />

< €200,000 but > €10,000 Negotiated<br />

procedure (service contracts)<br />

• The Beneficiary does not have to publish the<br />

procurement notice;<br />

• The Beneficiary consults at least three suppliers of its<br />

choice and negotiates the terms of the contract with<br />

one or more of them;<br />

• The Terms of References (TORs) and/or Technical<br />

Specifications must be drafted clearly.<br />

• The time-limits <strong>for</strong> receipt of offers and requests to<br />

participate must be long enough to allow interested<br />

parties a reasonable and appropriate period to prepare<br />

and submit their tenders.<br />

18


Agenda<br />

PART I<br />

Basic principles<br />

General Obligations<br />

Contract-award procedures<br />

Eligible costs<br />

Payment procedures<br />

Technical and <strong>Financial</strong> reporting<br />

PART II<br />

Grants 2013<br />

19


Eligible costs<br />

Definition:<br />

• Real Costs incurred by the beneficiary<br />

• During implementation of action<br />

• Indicated in the estimated budget<br />

• Necessary <strong>for</strong> implementing action<br />

• Identifiable + verifiable<br />

• Compliant with accounting standards<br />

• Reasonable and justified<br />

20


Eligible costs<br />

Definition:<br />

• Incurred by the beneficiary<br />

• During implementation of action<br />

• Indicated in the estimated budget<br />

• Necessary <strong>for</strong> implementing action<br />

• Identifiable + verifiable<br />

• Compliant with accounting standards<br />

• Reasonable and justified<br />

21


Eligible costs<br />

• Indicated in the estimated overall budget<br />

To be considered eligible, all costs must have<br />

been entered as eligible costs in the estimated<br />

budget.<br />

Any amendment of the estimated budget (higher<br />

than 15% per heading) which would alter the<br />

action or work programme planned may be<br />

allowed only if it has been subject of a written<br />

supplementary agreement between the parties.<br />

22


Direct eligible costs<br />

Necessary to implement the action<br />

• Staff – Heading 1<br />

• Travel expenses – Heading 2<br />

• Equipment and supplies – Heading 3<br />

• Local office – Heading 4<br />

• Other costs and services – Heading 5<br />

• Others - Heading 6<br />

Real costs : analytical accounting system<br />

Indirect eligible costs<br />

Flat-rate : max 7% of direct costs<br />

23


Eligible or ineligible?<br />

Which of the following can be considered eligible <strong>for</strong> a grant financed by the Commission:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

cost of bank transactions<br />

cost of external auditing<br />

credits to third parties<br />

cost of translation<br />

provision <strong>for</strong> reserve<br />

currency exchange losses<br />

cost of financial guarantee<br />

purchase of land or buildings (real estate)<br />

cost of electricity <strong>for</strong> the part of building used to implement the project<br />

debts and provisions <strong>for</strong> losses<br />

security cost of the building <strong>for</strong> the part used to implement the project<br />

costs covered by another action;<br />

administrative and management cost<br />

cost of new computers to be used only by the project staff<br />

insurance cost<br />

maintenance cost<br />

interest owed<br />

rent<br />

24


Eligible or ineligible?<br />

Which of the following can be considered eligible <strong>for</strong> a grant financed by the Commission:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

cost of bank transactions<br />

cost of external auditing<br />

credits to third parties<br />

cost of translation<br />

provision <strong>for</strong> reserve<br />

currency exchange losses<br />

cost of financial guarantee<br />

purchase of land or buildings (real estate)<br />

cost of electricity <strong>for</strong> the part of building used to implement the project<br />

debts and provisions <strong>for</strong> losses<br />

security cost of the building <strong>for</strong> the part used to implement the project<br />

costs covered by another action;<br />

administrative and management cost<br />

cost of new computers to be used only by the project staff<br />

insurance cost<br />

maintenance cost<br />

interest owed<br />

rent<br />

25


Preparation of The budget<br />

26


The budget<br />

Question :<br />

You are analyzing the Human<br />

Resources heading of the budget<br />

that has been distributed. What<br />

are your remarks? Are there any<br />

not acceptable costs?<br />

27


The budget<br />

• Article 14 of General Conditions:<br />

Direct costs (Art. 14.2.)<br />

• Human Resources<br />

• Actual gross salaries including social security<br />

charges and other remuneration-related costs<br />

• It concerns staff from Beneficiary or its<br />

partners<br />

• They must not exceed those normally borne by<br />

the Beneficiary or its partners<br />

• No fees accepted!<br />

28


The Budget<br />

• Article 14 of General Conditions:<br />

Direct costs (Art. 14.2.)<br />

• Subsistence costs<br />

• Per diems:<br />

• Covers accommodation, meals and local travel<br />

within the place of mission<br />

• requires an overnight stay away from the base<br />

of operations<br />

• Must not exceed the rates at the time of<br />

contract signature and those normally borne<br />

by the beneficiary or its partners<br />

29


Agenda<br />

PART I<br />

Basic principles<br />

General Obligations<br />

Contract-award procedures<br />

Eligible costs<br />

Payment procedures<br />

Technical and <strong>Financial</strong> reporting<br />

PART II<br />

Grants 2013<br />

30


Payment Procedures<br />

See Article 4 of the Special Conditions and<br />

Article 15 of the General Conditions<br />

1. Initial Pre-financing, paid within 45 days, as from<br />

the date of reception by the Contracting authority of<br />

signed contract<br />

2. Further Pre-financing, paid within 45 days of the<br />

Contracting Authority approving interim report<br />

3. Final Payment, paid within 45 days of the<br />

Contracting Authority approving final report<br />

31


Pre-financings<br />

conditions of payments<br />

• Detailed in the grant contract<br />

• Determined by:<br />

• Duration<br />

• Progress of the action<br />

• Costs incurred by the beneficiary<br />

32


1. First pre-financing<br />

2. Further instalments of pre-financing<br />

3. Final payment<br />

33


First pre-financing<br />

Maximum amount to pay (Art 15.1. GC)<br />

Option 1: < 12 months & < 100.000 EUR<br />

80% of the EC contribution<br />

Option 2: >12 months & > 100.000 EUR<br />

80% of the part of the estimated budget <strong>for</strong> Year 1<br />

financed by Contracting Authority<br />

34


First pre-financing<br />

Reception of the signed contract<br />

Check correct amounts in Article 4.2. of Special<br />

Conditions<br />

Article 4.3. of Special Conditions no need of<br />

payment request if Art 4.3. reads as follows:<br />

“The first installment of pre-financing, shall be paid to<br />

the Beneficiary within 45 days, as from the date of<br />

reception by the Contracting authority of signed<br />

Contract…”<br />

Original payment request, if applicable<br />

Only in the absence of Article 4.3. (see above)<br />

35


First pre-financing<br />

Payment delays<br />

Contractual deadlines: Article 4.3. of the<br />

Special Conditions<br />

45 days after receipt of signed contract<br />

36


1. First pre-financing<br />

2. Further instalments of pre-financing<br />

3. Final payment<br />

37


Further instalments of pre-financing<br />

Amount to pay (Article 15.1. of GC)<br />

Designed to normally cover the Beneficiary’s<br />

financing needs <strong>for</strong> each 12 months period<br />

Percentage to eligible costs laid down in Article<br />

3.2. of SC<br />

38


Further instalments of pre-financing<br />

<br />

Necessary documents:<br />

Article 15.1. of General Conditions<br />

• Request <strong>for</strong> payment con<strong>for</strong>ming to Annex V<br />

• Expenditure Verification report, if required under Art<br />

15.6<br />

• Interim report<br />

• Budget <strong>for</strong>ecast <strong>for</strong> the next 12 month period<br />

39


Further instalments of pre-financing<br />

Check amount to be paid<br />

Art. 15.1. of GC:<br />

-Rule of 70%<br />

• Further instalment of pre-financing if part of the<br />

expenditure actually incurred funded by the EC = 70% of<br />

previous payment and 100% of any previous payment<br />

• Where consumption < 70%, the next instalment of pre-<br />

financing payment is reduced by unused amount of<br />

previous instalment of pre-financing.<br />

-Total sum of pre-financing never > 90% of the total<br />

amount financed by the Contracting Authority.<br />

40


Further instalments of pre-financing<br />

<strong>Reporting</strong> Obligations<br />

Article 2 of GC:<br />

• The reports must contain a narrative and a financial<br />

section and shall con<strong>for</strong>m to the model in Annex VI<br />

• Every request <strong>for</strong> payment must be accompanied by<br />

an interim report<br />

• Any additional reporting requirement shall be set out<br />

in the Special Conditions<br />

• Every 12 month-period If the Beneficiary fails to<br />

comply with this obligation, he must in<strong>for</strong>m the<br />

Contracting Authority of the reasons and provide a<br />

summary of progress in the Action.<br />

41


Further instalments of pre-financing<br />

Expenditure Verification report<br />

Definition: report on the verification of the<br />

Action´s expenditure produced by an approved<br />

auditor who meets the specific conditions of ToR.<br />

Purpose:<br />

The Auditor examines the factual in<strong>for</strong>mation in the<br />

<strong>Financial</strong> Report of the Beneficiary and compares it with<br />

the terms and conditions of the Grant Contract.<br />

It is not an exhaustive control but based on a sampling<br />

methodology.<br />

He does not provide an audit opinion. The EC will<br />

assess itself the factual findings by budgetary heading<br />

and draws its own conclusions.<br />

42


Further instalments of pre-financing<br />

Article 15.6. of General Conditions<br />

Based on the expenditure verification report the<br />

Contracting Authority determines the total amount<br />

of eligible expenditure which may be deducted from<br />

the total sum of pre-financing under the contract<br />

(clearance).<br />

43


Further instalments of pre-financing<br />

Expenditure Verification report<br />

When: (Art. 15.6)<br />

• Any request <strong>for</strong> pre-financing in case of grants > EUR<br />

750.000<br />

• Any final report <strong>for</strong> grants > EUR 100 000<br />

Template: in line with model in Annex VII<br />

44


Further instalments of pre-financing<br />

Article 15.7, 15.9, 15.10 and 15.11 of<br />

General Conditions<br />

<br />

Any interest or equivalent benefits accruing from<br />

pre-financing paid shall be mentioned in the interim<br />

and final reports<br />

Conditions:<br />

Pre-financing < 250 000 EUR<br />

not due to the EC and may be used to the Action<br />

250 000 EUR < Pre-financing < 750 000 EUR<br />

deducted from the payment of the balance<br />

Pre-financing > 750 000 EUR<br />

recovery at the end of each financial year<br />

45


Further instalments of pre-financing<br />

Main further checks:<br />

Compliance with templates (Annex VI)<br />

Amounts are arithmetically correct<br />

Expenditure incurred within implementation period<br />

No double-counting of direct costs in previous<br />

reports<br />

Exchange rates applied are correct (Art. 15.8. of<br />

GC)<br />

Transfers limit to 15% of initial amount of main<br />

heading (Art. 9.2. of GC)<br />

Contingency reserve authorised in advanced (Art<br />

14.3 of GC)<br />

46


1. First pre-financing<br />

2. Further instalments of pre-financing<br />

3. Final payment<br />

47


Necessary documents:<br />

Article 15.1. of the General Conditions:<br />

• Request <strong>for</strong> payment of the balance (Annex V)<br />

• Expenditure verification report<br />

• Final report<br />

Final payment<br />

Contractual Conditions<br />

• Transfer of ownership, if applicable (Art 7.3. =><br />

equipment and vehicles with purchase cost > EUR<br />

5000)<br />

Approval by EC of the final implementation<br />

report and validation of expenditure in the final<br />

statement<br />

All work done must correspond to the objectives laid<br />

down in the grant agreement.<br />

Conclusions from Ops will be taken into account when<br />

assessing financial report<br />

48


Final payment<br />

Contractual Conditions<br />

Main further checks:<br />

Respect of deadline <strong>for</strong> submission of final report: 3 or 6<br />

months after end date of implementation (Art. 2.3. of<br />

G.C.)<br />

Compliance with templates (Annex VI)<br />

Amounts are arithmetically correct<br />

No double-counting of direct costs in previous reports<br />

Exchange rates applied are correct (Art. 15.8. of GC)<br />

Transfers limit to 15% of initial amount of main heading<br />

except taxes (Art. 9.2. of GC)<br />

Contingency reserve authorised in advanced (Art 14.3<br />

of GC)<br />

Transfers of ownership attached to the report (Art 7.3.)<br />

49


Final payment<br />

Determination of final amount<br />

Co-financing (Art. 3 of SC):<br />

The amount does not exceed the maximum<br />

absolute value <strong>for</strong> the Community Grant<br />

The % of the total eligible costs is also<br />

respected<br />

50


Final payment<br />

Determination of final amount<br />

The amount of the grant becomes final:<br />

After acceptance of the final reports !<br />

Possible notified Suspension by Contracting<br />

Authority<br />

clarification/ corrections maximum 30 days<br />

Art 2.3 / 15.1.CG<br />

51


Agenda<br />

PART I<br />

Basic principles<br />

General Obligations<br />

Contract-award procedures<br />

Eligible costs<br />

Payment procedures<br />

Technical and <strong>Financial</strong> reporting<br />

PART II<br />

Grants 2013<br />

52


<strong>Reporting</strong><br />

• There are 2 types of reporting (Article 2.1 General Conditions):<br />

1. Interim Report :<br />

• A mid-term report (generally covers 12 months period)<br />

• Consists of narrative and financial sections<br />

• If no expenditure verification report required, the<br />

financial section is accompanied by a list detailing each<br />

item of expenditure incurred in the period covered by<br />

the report, and indicating <strong>for</strong> each its title, amount,<br />

relevant heading in the Budget of the Action and the<br />

reference of the justifying document<br />

• Should be submitted within 30 days of the end of the<br />

period covered by the report<br />

2. Final Report :<br />

• Covers the entire period of implementation<br />

• Summarizes and updates all the in<strong>for</strong>mation<br />

contained in the Interim Reports completed with the<br />

last period; references to previous reports will not be<br />

considered<br />

• Consists of narrative and financial sections<br />

• Must be submitted within 3 to 6 months after the end<br />

of implementation period.<br />

53


<strong>Reporting</strong><br />

Important note:<br />

The in<strong>for</strong>mation provided in the narrative report<br />

must correspond to the financial in<strong>for</strong>mation<br />

that appears in the financial report<br />

54


<strong>Reporting</strong><br />

• Report should:<br />

- con<strong>for</strong>m to the <strong>for</strong>mat in Annex VI<br />

- be drafted in English<br />

- be clear and concise<br />

- focus on assessment of progress towards achieving<br />

results (“results-based reports”), and not simply list<br />

activities undertaken and inputs provided<br />

- cover the activities as a whole regardless of which<br />

part of it is financed by the EU<br />

- Include details on the progress of visibility activities<br />

• Any report will be considered approved if there is no<br />

written approval by the EU within 45 days of submission<br />

• The EU may request additional in<strong>for</strong>mation at any time and<br />

the in<strong>for</strong>mation must be supplied within 30 days of the<br />

request<br />

55


<strong>Financial</strong> Report<br />

• con<strong>for</strong>m to the <strong>for</strong>mat in Annex VI<br />

• conversion into euro of the real costs shall be done at the<br />

rate made up by the average of the rates published in<br />

In<strong>for</strong>Euro <strong>for</strong> the months covered by the relevant report<br />

In<strong>for</strong>Euro:<br />

http://ec.europa.eu/budget/in<strong>for</strong>euro/index.cfm<br />

Month Currency Rate Average<br />

déc-11 EUR/SGD 1,7306<br />

nov-11 EUR/SGD 1,7588<br />

oct-11 EUR/SGD 1,7626<br />

sept-11 EUR/SGD 1,7399<br />

août-11 EUR/SGD 1,7169<br />

juil-11 EUR/SGD 1,7799<br />

juin-11 EUR/SGD 1,7613<br />

1,755725<br />

mai-11 EUR/SGD 1,8191<br />

avr-11 EUR/SGD 1,7782<br />

mars-11 EUR/SGD 1,754<br />

févr-11 EUR/SGD 1,7542<br />

janv-11 EUR/SGD 1,7132<br />

56


GRANTS 2013<br />

57


Main changes: Call For Proposals<br />

Eligibility of applicants<br />

New:<br />

- Multi-Beneficiary<br />

contract<br />

- Beneficiary (ies),<br />

coordinator<br />

- Affiliated entities<br />

58


Main changes: Call For Proposals<br />

BEFORE 2013<br />

implementing<br />

partner 1<br />

Only 1 LEF is entered in the system<br />

Applicant<br />

CONTRACT is<br />

signed by<br />

applicant only<br />

(Beneficiary)<br />

implementing<br />

partner 2<br />

59


Main changes: Call For Proposals<br />

AS FROM 01.01.2013<br />

MULTI-BENEFICIARY CASE<br />

All the signatory LEFs are entered in the<br />

system.<br />

Co-applicant 1<br />

Mandate<br />

Lead Applicant<br />

CONTRACT is<br />

signed by all the<br />

beneficiaries<br />

Mandate<br />

Co-applicant 2<br />

60


Main changes: Call For Proposals<br />

MULTI – BENEFICIARY GRANT CONTRACT<br />

= More than one beneficiary is part of the<br />

contract<br />

61


Main changes: Call For Proposals<br />

Applicant/ Coordinator:<br />

- Plays the role of lead applicant/ Main beneficiary<br />

- Gets a mandate from the rest of co-applicants<br />

:<br />

- To submit the proposal<br />

- To sign the contract<br />

- To represent all during execution of the<br />

contract<br />

- Assumes all financial responsibility of the contract<br />

62


Main changes: Call For Proposals<br />

AS FROM 01.01.2013<br />

MULTI-BENEFICIARY CASE WITH AFFILIATED ENTITIES<br />

Note : Applicants and<br />

Beneficiaries may (or<br />

not) have affiliated<br />

entities, but these never<br />

sign the contract.<br />

All the signatory LEFs are entered in the<br />

system.<br />

Co-applicant 1<br />

Affiliated Entity 1<br />

Affiliated Entity 2<br />

Lead Applicant<br />

CONTRACT is<br />

signed by all the<br />

beneficiaries<br />

Co-applicant 2<br />

Affiliated Entity 3<br />

63


Main changes: Call For Proposals<br />

Affilitiated enities:<br />

- They are third parties to the contract but benefit<br />

partially from beneficiaries rights (eligibility<br />

of<br />

costs)<br />

- Entities <strong>for</strong>ming part of a beneficiary, with legal<br />

or capital link with the beneficiary<br />

- Their costs are considered costs of the entity to<br />

which they are affiliated<br />

64


Main changes: Call <strong>for</strong> Proposal<br />

Simplified cost options<br />

(lump sums, unit costs, flat-rate<br />

funding)<br />

- Limited to € 60.000 per beneficiary to the grant<br />

contract (exclusive of 7% of indirect costs)<br />

- Proposed by the beneficiary<br />

- Approval of Contracting Authority during contract<br />

phase<br />

- Guidelines and check-list (NEW annex K)<br />

- The used methods should be clearly described<br />

65


Main changes: Contractual matters<br />

Interest on pre-financing:<br />

- Not due to the Union any more<br />

- No need to open interest bearing accounts<br />

- No more reporting<br />

Payments deadlines:<br />

- One single time limit<br />

- No more sub limits <strong>for</strong> approval<br />

- 30/60/90 depending on the type of payment<br />

66


Main changes: Contractual matters<br />

Expenditure verification report needed with<br />

Previous:<br />

Any request <strong>for</strong> pre-financing<br />

: > € 750 000<br />

New:<br />

Any request <strong>for</strong> pre-financing: > € 5 000 000<br />

67


Main changes: Contractual matters<br />

‣ Amendments to the contracts:<br />

Ceiling increased from 15% to 25% <strong>for</strong> transfers<br />

between main budget headings<br />

Not to be used to modify:<br />

- Amounts or rates of the simplified cost options<br />

- Contributions in kind<br />

- Indirect costs 68


shana.IMPENS@ec.europa.eu<br />

69


Thank You<br />

70