‣ As shown by the hydrological and climatological data the Buyant Gol in recent years<br />
had enough water to irrigate additionally the potential rehabilitation areas. The<br />
situation can be improved by the reconstruction of Janjin Boolt headwork round 5 km<br />
downstream of Buyant Gol bridge near Khovd Khot. The discharge of this headwork<br />
has to be regulated by the authorities and a more intelligent channel distribution<br />
system would avoid water waste. The transpiration of the water surface of the area<br />
behind the headwork cannot be calculated because the only available data are focused<br />
on the whole drainage basin of Buyant Gol. The calculated transpiration amount of<br />
only 56 mm/a, mentioned above, is fixed on this area and seems to be very low, what<br />
is very improbable under the conditions of this arid zone.<br />
‣ A further extension of the irrigated cultikvation area could be guaranteed by a change<br />
of the irrigation methods. Surface flooding–the most common method of nowadays --<br />
wastes water to in a high amount. Drip irrigation for melons, potatoes, onions etc.<br />
would be much more effective but more costly, however, drip irrigation systems must<br />
be fully serviced all over the year, especially in fall before the start of the frost period.<br />
The water quality for drip irrigation is suitable.<br />