Research Schedule<br />

The research work has been carried out between April and November 2006 according to the<br />

following time schedule:<br />

April–May:<br />

June–July:<br />

Preparation phase<br />

Main phase of field research<br />

August–September: Evaluation of research data and writing of draft report<br />

October:<br />

November:<br />

Final field trip to Khovd, mapping and discussions with stakeholders<br />

Map production and writing of final report<br />

Note: The heads of the four different research groups are responsible for the scientific<br />

accuracy and quality of the information.<br />