Coorperation Strategy - Albania 2010-2013 - Deza - CH
Coorperation Strategy - Albania 2010-2013 - Deza - CH
Coorperation Strategy - Albania 2010-2013 - Deza - CH
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ALBANIA <strong>2010</strong>–<strong>2013</strong><br />
• to what extent portfolio management relates to<br />
national processes;<br />
• whether portfolio management is sensitive to<br />
risks and context/scenario developments.<br />
Assessing results and reporting: The monitoring<br />
process for the CS is tied to the annual reporting<br />
and planning process and is under the<br />
responsibility of the Swiss Cooperation Office. As<br />
far as possible country outputs and outcomes are<br />
assessed jointly with the main stakeholder groups<br />
of the Swiss cooperation. Project and programme<br />
implementing partners are included for the assessment<br />
of the portfolio outputs and outcomes.<br />
The monitoring is structured according to the main<br />
components of the CS. The key product of the<br />
monitoring process is the result statement, i.e. a<br />
critical overall assessment on both the extent and<br />
how the results are achieved with an emphasis on<br />
plausible “output and outcome” and “portfolio to<br />
country level” contributions.<br />
Reporting on CS monitoring, overall assessment<br />
of performance, and steering decisions are done<br />
by the means of the annual report delivered by the<br />
Swiss Cooperation Office to SDC and SECO<br />
headquarters.<br />
The monitoring of the CS will be done against the<br />
following Results Framework (in synopsis, see<br />
next page), more detailed results frameworks per<br />
component or sub-component of the CS being<br />
elaborated separately.<br />
23