Project Title: Step Six - Dredging<br />
from 34-foot Contour<br />
Summary:<br />
Dredging of the lake bottom from the<br />
%-foot contour shoreward would<br />
deepen approximately 78% of the lake<br />
by another foot and essentially prolong<br />
the life of <strong>Lake</strong> <strong>Panasoffkee</strong> by at least<br />
100 years (Figure 3). It should be<br />
appreciated that this option would<br />
affect most of the lake bottom and a<br />
considerable amount of submersed<br />
vegetation. Implementation of this<br />
step would remove at least 4,000,000<br />
cubic yards of sediment in addition to<br />
that proposed in Step Two and Step<br />
Three. A demonstrated ability of<br />
desirable submersed plants to<br />
adequately recolonize dredged zones<br />
is a prerequisite for implementation of<br />
this step.<br />
Figure 3, Step Six - Removal of sediment from 34' contour to<br />
shorellne (383 contour), does not include woody / shrubby<br />
Ufecl.<br />
Agency or Local Government Partnering:<br />
Due to the estimated cost of this project, the District will seek funding from a variety of state<br />
and federal sources, including the FDOT mitigation banking program. Permitting will be<br />
coordinated with the USACOE and the FDEP.<br />
18