Project Title: Step Six - Dredging<br />

from 34-foot Contour<br />

Summary:<br />

Dredging of the lake bottom from the<br />

%-foot contour shoreward would<br />

deepen approximately 78% of the lake<br />

by another foot and essentially prolong<br />

the life of <strong>Lake</strong> <strong>Panasoffkee</strong> by at least<br />

100 years (Figure 3). It should be<br />

appreciated that this option would<br />

affect most of the lake bottom and a<br />

considerable amount of submersed<br />

vegetation. Implementation of this<br />

step would remove at least 4,000,000<br />

cubic yards of sediment in addition to<br />

that proposed in Step Two and Step<br />

Three. A demonstrated ability of<br />

desirable submersed plants to<br />

adequately recolonize dredged zones<br />

is a prerequisite for implementation of<br />

this step.<br />

Figure 3, Step Six - Removal of sediment from 34' contour to<br />

shorellne (383 contour), does not include woody / shrubby<br />

Ufecl.<br />

Agency or Local Government Partnering:<br />

Due to the estimated cost of this project, the District will seek funding from a variety of state<br />

and federal sources, including the FDOT mitigation banking program. Permitting will be<br />

coordinated with the USACOE and the FDEP.<br />