Total 1 $2,128,000 1 $2,128,000 1 $2,128,000 1<br />
Ag<br />
Due to the estimated cost of this project, the District will seek funding from a variety of state<br />
and federal sources, including the FDOT mitigation banking permitting will be<br />
coordinated with the USACOE and the FDEP.<br />
Project Title: Step Three - East<br />
Side Emergent Removal - Tied to<br />
the 35-foot Contour<br />
Summary:<br />
There is a broad band of emergent<br />
vegetation along the eastern<br />
IOU Illicit<br />
shoreline of <strong>Lake</strong> <strong>Panasoffkee</strong> that<br />
runs from just south of Shell Point to<br />
the southern end of the lake (Figure<br />
2). This band of ememenl<br />
vegetation is composed largely of<br />
1<br />
~ickerelweed. cattail and arrowhead.<br />
Although much of the vegetation is<br />
rooted to the lake bottom, a<br />
substantial amount could be<br />
classified as tussocks and much of<br />
the tussock oroblern on the lake is<br />
generated bythis band of vegetation.<br />
I<br />
~igu~ 2.<br />
The band is more than 1.000 feet<br />
Wide in so&<br />
1<br />
sections, and is SO Three - Removal of East vegeloflon and<br />
sediments from the 36' Contour.<br />
dense and impenetrable that much of<br />
it does not provide productive fish step Five - ~emwal of woodylshrubby vegetation and<br />
habitat. Removal of this vegetation ~ s ~ o ~ m d ~ n ~<br />
would improve fish habitat, restore<br />
much of the eastern shoreline and improve navigation. Dredging to a depth of two to three<br />
feet Will open the area to fish and encourage the growth of submersed vegetation while<br />
discouraging emergents. It is proposed that sediment be dredged from the 35-foot contour<br />
toward the shore, and the area be sloped or stepped so that a narrow emergent zone is<br />
preserved. The entire project area is almost 800 acres, and this step would remove upwards