07.09.2014 Views

Alafia River Minimum Flows and Levels - Southwest Florida Water ...

Alafia River Minimum Flows and Levels - Southwest Florida Water ...

Alafia River Minimum Flows and Levels - Southwest Florida Water ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Julian day 301 (October 28) to Julian day 109 (April 19) of the following calendar<br />

year. Using these definitions: Blocks 1, 2, <strong>and</strong> 3 are 65, 176 <strong>and</strong> 124 days in<br />

length, respectively (Table 2-6).<br />

The three flow blocks were utilized for development of minimum flows for the<br />

<strong>Alafia</strong> <strong>River</strong> <strong>and</strong> are evident in a hydrograph of median daily flows for the Lithia<br />

gage site (Figure 2-16). Lowest flows, which are typically confined to the river<br />

channel, occur during Block 1. Highest flows, which are often sufficient for<br />

inundating the river floodplain, occur during Block 3, although high flows may<br />

also occur during Block 2. Medium flows occur during Block 2.<br />

Table 2-5. Beginning Julian days for the Wet <strong>and</strong> Dry periods (Blocks 1 <strong>and</strong> 3) <strong>and</strong> ending<br />

date for the Wet period at five different gage stations in the SWFWMD.<br />

Begin Dry<br />

(Block 1)<br />

Begin Wet<br />

(Block 3)<br />

End Wet<br />

(Block 3)<br />

<strong>Alafia</strong> at Lithia 106 175 296<br />

Hillsborough at<br />

112 176 296<br />

Zephyrhills<br />

Myakka at Sarasota 115 181 306<br />

Peace at Arcadia 110 174 299<br />

Withlacoochee at Croom 130 208 306<br />

Mean w/o<br />

110 176 300<br />

Withlacoochee<br />

Mean with<br />

Withlacoochee<br />

114 183 301<br />

Table 2-6. Beginning <strong>and</strong> ending calendar dates for annual flow Blocks 1, 2, <strong>and</strong> 3 for the<br />

<strong>Alafia</strong>, Hillsborough, Myakka <strong>and</strong> Peace <strong>River</strong>s for non-leap years. Calendar dates apply<br />

for both non-leap years <strong>and</strong> leap years.<br />

Start Date (Julian Day) End Date (Julian Day) Number of Days<br />

Block 1 April 20 (110) June 24 (175) 65<br />

Block 2 October 28 (301) April 19 (109) 176<br />

Block 3 June 25 (176) October 27 (300) 124<br />

2-37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!