Total 1,305,000 1,305,000 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S. Timelines Construction Milestone Projected Date Complete 12/31/2015 Design and Permitting Milestone Projected Date Complete 06/30/2014 Project Completion and Certification Milestone Projected Date Contract Close-out 12/31/2016 86
Return to TOC SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2014 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name Lakewood Estates Piping Project Number N531 Cooperator City of Dunedin Department Engineering Contact Person Thomas Burke Address P. O. Box 1348 City Sate Zip Dunedin, FL 346971348 Phone # 727-298-3175 Email tburke@dunedinfl.net Project Type: Water Supply X Water Quality X Flood Protection Natural Systems Strategic Initiatives: X Water Quality Maintenance and Improvement Water Quality Monitoring Alternative Water Supply Conservation Reclaimed Water Regional Water Supply Planning X Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: Charlotte Citrus Desoto Hardee Hernando Highlands Hillsborough Lake Levy Manatee Marion Pasco X Pinellas Sarasota Sumter Polk Project Description: The Lakewood Estates Piping project is a stormwater management project identified in the City of Dunedin's Master Drainage Plan to alleviate flooding in the east-central part of the City's Spring Branch Watershed. That part of the City is among the older developed parts of the City which has limited capacity for either treatment or drainage needs. In implementing its Master Drainage Plan, and as indicated in the City's Stormwater Utility CIP, the City is programmed to construct the Lakewood Estates Piping project in FY2014. The City CIP identifes this as Project Number 531401. As indicated in the project image, the primary project components, comprising increased size storm sewers and stormwater treatment units, would be constructed in and around Pinewood Drive. Water quality improvements would be achieved in part with the construction of either continuous deflective separation (CDS) units. In addition, where soil and groundwater conditions permit, perforated pipe will be constructed to allow collected stormwaters to recharge the local groundwater system and to minimize the discharge of stormwater and pollutant materials into Spring Branch, Stevenson Creek and, eventually, St Joseph Sound. The proposed use of CDS units and of perforated pipe for stormwater treatment and reduced rates of discharge is consistent with the methods recently completed, with SWFWMD grant funding, in the Orangewood Outfall project and planned for the President Street Outfall project. With grant funding, the City would proceed on the basis of in-house design methods similar to those used for other projects. This will allow all project construction to be completed in FY 2014. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. The City of Dunedin is continuing to aggressively improve its stromwater management facilities with emphasis on reducing the volume, while improving the quality, of stormwater discharged into area waterways. The City Code of Ordinances established standards, regulations and procedures in the development, management and enforcement of water conservation and flood protection. The City remains in compliance with the requirements set forth in the NPDES MS4 operating permit. In addition, the City maintains an active cooperation with Pinellas County and adjacent communities in monitoring water quality and activities which may influence area waterways. Funding Source Prior Funding FY2013 Budget FY2014 Budget Future Funding Total Funding Applicant Share 968,000 968,000 Pinellas Anclote 968,000 968,000 87
- Page 41 and 42: Return to TOC SOUTHWEST FLORIDA WAT
- Page 43 and 44: Return to TOC SOUTHWEST FLORIDA WAT
- Page 45 and 46: Return to TOC SOUTHWEST FLORIDA WAT
- Page 47 and 48: Return to TOC SOUTHWEST FLORIDA WAT
- Page 49 and 50: Return to TOC SOUTHWEST FLORIDA WAT
- Page 51 and 52: Return to TOC SOUTHWEST FLORIDA WAT
- Page 53 and 54: Return to TOC SOUTHWEST FLORIDA WAT
- Page 55 and 56: Return to TOC SOUTHWEST FLORIDA WAT
- Page 57 and 58: Return to TOC SOUTHWEST FLORIDA WAT
- Page 59 and 60: Return to TOC SOUTHWEST FLORIDA WAT
- Page 61 and 62: Return to TOC Project Name Project
- Page 63 and 64: Return to TOC Project Name Project
- Page 65 and 66: Return to TOC SOUTHWEST FLORIDA WAT
- Page 67 and 68: Return to TOC SOUTHWEST FLORIDA WAT
- Page 69 and 70: Return to TOC SOUTHWEST FLORIDA WAT
- Page 71 and 72: Return to TOC SOUTHWEST FLORIDA WAT
- Page 73 and 74: Return to TOC SOUTHWEST FLORIDA WAT
- Page 75 and 76: Return to TOC SOUTHWEST FLORIDA WAT
- Page 77 and 78: Return to TOC SOUTHWEST FLORIDA WAT
- Page 79 and 80: Return to TOC SOUTHWEST FLORIDA WAT
- Page 81 and 82: Return to TOC SOUTHWEST FLORIDA WAT
- Page 83 and 84: Return to TOC SOUTHWEST FLORIDA WAT
- Page 85 and 86: Return to TOC SOUTHWEST FLORIDA WAT
- Page 87 and 88: Return to TOC SOUTHWEST FLORIDA WAT
- Page 89 and 90: Return to TOC SOUTHWEST FLORIDA WAT
- Page 91: Return to TOC SOUTHWEST FLORIDA WAT
- Page 95 and 96: Return to TOC SOUTHWEST FLORIDA WAT
- Page 97 and 98: Return to TOC SOUTHWEST FLORIDA WAT
- Page 99 and 100: Return to TOC SOUTHWEST FLORIDA WAT
- Page 101 and 102: Return to TOC SOUTHWEST FLORIDA WAT
- Page 103 and 104: Return to TOC SOUTHWEST FLORIDA WAT
- Page 105 and 106: Return to TOC SOUTHWEST FLORIDA WAT
- Page 107 and 108: Return to TOC SOUTHWEST FLORIDA WAT
- Page 109 and 110: Return to TOC SOUTHWEST FLORIDA WAT
- Page 111 and 112: Return to TOC SOUTHWEST FLORIDA WAT
- Page 113 and 114: Return to TOC SOUTHWEST FLORIDA WAT
- Page 115 and 116: Return to TOC SOUTHWEST FLORIDA WAT
- Page 117 and 118: Return to TOC SOUTHWEST FLORIDA WAT
- Page 119 and 120: Return to TOC SOUTHWEST FLORIDA WAT
- Page 121 and 122: Return to TOC SOUTHWEST FLORIDA WAT
- Page 123 and 124: Return to TOC SOUTHWEST FLORIDA WAT
- Page 125 and 126: Return to TOC SOUTHWEST FLORIDA WAT
- Page 127 and 128: Return to TOC SOUTHWEST FLORIDA WAT
- Page 129 and 130: Return to TOC SOUTHWEST FLORIDA WAT
- Page 131 and 132: Return to TOC SOUTHWEST FLORIDA WAT
- Page 133 and 134: Return to TOC SOUTHWEST FLORIDA WAT
- Page 135 and 136: Return to TOC SOUTHWEST FLORIDA WAT
- Page 137 and 138: Return to TOC SOUTHWEST FLORIDA WAT
- Page 139 and 140: Return to TOC SOUTHWEST FLORIDA WAT
- Page 141 and 142: Return to TOC SOUTHWEST FLORIDA WAT
Total 1,305,000 1,305,000<br />
Matching Fund Reduction<br />
Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />
Timelines<br />
Construction<br />
Milestone<br />
Projected Date<br />
Complete 12/31/2015<br />
Design and Permitting<br />
Milestone<br />
Projected Date<br />
Complete 06/30/2014<br />
Project Completion and Certification<br />
Milestone<br />
Projected Date<br />
Contract Close-out 12/31/2016<br />