Total 1,305,000 1,305,000 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S. Timelines Construction Milestone Projected Date Complete 12/31/2015 Design and Permitting Milestone Projected Date Complete 06/30/2014 Project Completion and Certification Milestone Projected Date Contract Close-out 12/31/2016 86

Return to TOC SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2014 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name Lakewood Estates Piping Project Number N531 Cooperator City of Dunedin Department Engineering Contact Person Thomas Burke Address P. O. Box 1348 City Sate Zip Dunedin, FL 346971348 Phone # 727-298-3175 Email tburke@dunedinfl.net Project Type: Water Supply X Water Quality X Flood Protection Natural Systems Strategic Initiatives: X Water Quality Maintenance and Improvement Water Quality Monitoring Alternative Water Supply Conservation Reclaimed Water Regional Water Supply Planning X Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: Charlotte Citrus Desoto Hardee Hernando Highlands Hillsborough Lake Levy Manatee Marion Pasco X Pinellas Sarasota Sumter Polk Project Description: The Lakewood Estates Piping project is a stormwater management project identified in the City of Dunedin's Master Drainage Plan to alleviate flooding in the east-central part of the City's Spring Branch Watershed. That part of the City is among the older developed parts of the City which has limited capacity for either treatment or drainage needs. In implementing its Master Drainage Plan, and as indicated in the City's Stormwater Utility CIP, the City is programmed to construct the Lakewood Estates Piping project in FY2014. The City CIP identifes this as Project Number 531401. As indicated in the project image, the primary project components, comprising increased size storm sewers and stormwater treatment units, would be constructed in and around Pinewood Drive. Water quality improvements would be achieved in part with the construction of either continuous deflective separation (CDS) units. In addition, where soil and groundwater conditions permit, perforated pipe will be constructed to allow collected stormwaters to recharge the local groundwater system and to minimize the discharge of stormwater and pollutant materials into Spring Branch, Stevenson Creek and, eventually, St Joseph Sound. The proposed use of CDS units and of perforated pipe for stormwater treatment and reduced rates of discharge is consistent with the methods recently completed, with SWFWMD grant funding, in the Orangewood Outfall project and planned for the President Street Outfall project. With grant funding, the City would proceed on the basis of in-house design methods similar to those used for other projects. This will allow all project construction to be completed in FY 2014. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. The City of Dunedin is continuing to aggressively improve its stromwater management facilities with emphasis on reducing the volume, while improving the quality, of stormwater discharged into area waterways. The City Code of Ordinances established standards, regulations and procedures in the development, management and enforcement of water conservation and flood protection. The City remains in compliance with the requirements set forth in the NPDES MS4 operating permit. In addition, the City maintains an active cooperation with Pinellas County and adjacent communities in monitoring water quality and activities which may influence area waterways. Funding Source Prior Funding FY2013 Budget FY2014 Budget Future Funding Total Funding Applicant Share 968,000 968,000 Pinellas Anclote 968,000 968,000 87

Total 1,305,000 1,305,000<br />

Matching Fund Reduction<br />

Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />

Timelines<br />

Construction<br />

Milestone<br />

Projected Date<br />

Complete 12/31/2015<br />

Design and Permitting<br />

Milestone<br />

Projected Date<br />

Complete 06/30/2014<br />

Project Completion and Certification<br />

Milestone<br />

Projected Date<br />

Contract Close-out 12/31/2016<br />