Tampa Bay Region - Southwest Florida Water Management District
Tampa Bay Region - Southwest Florida Water Management District
Tampa Bay Region - Southwest Florida Water Management District
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
• Allow for increased system reliability (and utilization) of the reclaimed water system<br />
• Increased energy efficiency through variable frequency drive and control systems for the pumping system<br />
• Allow for additional stormwater storage and treatment capacity at the golf course (onsite ponds currently serve dual purpose<br />
of stormwater treatment and reclaimed water storage for irrigation)<br />
Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection<br />
ordinances.<br />
The City of Tarpon Springs has a Stormwater Division, <strong>Water</strong> Distribution Division, and <strong>Water</strong> Meter Repair Division, which are<br />
responsible for maintaining and evaluating the operating conditions of each component. Each Division performs any required<br />
repairs and performs specific preventative maintenance tasks to ensure conservation of our water supply. The City of Tarpon<br />
Springs Law Enforcement Officers are responsible for enforcing the mandated water restrictions within the City. City conservation<br />
efforts, including inverted rate structures (ordinance attached), an extensive and popular reclaimed water program, and former toilet<br />
rebate program through Pinellas County Utilities have resulted in a measurable reduction in our per capita water consumption to<br />
less than 110 gal/capita/day. City leadership remains committed to water conservation and has maintained watering restrictions<br />
that are more stringent than currently required by the <strong>District</strong>.<br />
Funding Source<br />
Prior Funding<br />
FY2013<br />
Budget<br />
FY2014<br />
Budget<br />
Future<br />
Funding<br />
Total Funding<br />
Applicant Share 119,814 1,483,393 681,790 2,284,997<br />
Pinellas Anclote 119,814 1,483,393 681,790 2,284,997<br />
Total 239,628 2,966,786 1,363,580 4,569,994<br />
Matching Fund Reduction<br />
Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />
Timelines<br />
RW Pumping System (Future Request)<br />
Milestone<br />
Projected Date<br />
Begin Construction 08/30/2015<br />
Complete and Certify Construction 06/30/2016<br />
RW Storage System (FY2014 CFI Request)<br />
Milestone<br />
Projected Date<br />
Complete and Certify Construction 08/30/2015<br />
RW Storage System (FY2014 CFI Request)<br />
Milestone<br />
Projected Date<br />
Begin Construction 10/30/2014<br />
RW Storage and Pumping System (FY 2014 CFI Request)<br />
Milestone<br />
Projected Date<br />
Complete Design 07/30/2014<br />
RW Storage and Pumping System (FY2014 CFI Request)<br />
Milestone<br />
Projected Date<br />
Begin Design 10/30/2013<br />
RW Valves and Telemetry (FY2013 Funded)<br />
Milestone<br />
Projected Date<br />
Begin Design 10/30/2012<br />
Complete Design 04/30/2013<br />
Begin Construction 06/30/2013<br />
Complete and Certify Construction 12/21/2013<br />
60