SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT<br />

FY2014 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM<br />

Project Name<br />

Design & Construction - Pasco County Saddlebrook Golf Course Reclaimed <strong>Water</strong> Transmission and<br />

Pump Station Project<br />

Project Number N450<br />

Cooperator<br />

Pasco County<br />

Department<br />

Utilities<br />

Contact Person Pamela Wright<br />

Address<br />

7536 State Street<br />

City Sate Zip New Port Richey, FL 34654<br />

Phone #<br />

727-847-8145 ext7825<br />

Email<br />

pwright@pascocountyfl.net<br />

Project Type:<br />

X <strong>Water</strong> Supply <strong>Water</strong> Quality Flood Protection Natural Systems<br />

Strategic Initiatives:<br />

<strong>Water</strong> Quality Maintenance and Improvement <strong>Water</strong> Quality Monitoring<br />

Alternative <strong>Water</strong> Supply Conservation<br />

X Reclaimed <strong>Water</strong> <strong>Region</strong>al <strong>Water</strong> Supply Planning<br />

Emergency Flood Response Floodplain <strong>Management</strong><br />

Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery<br />

Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring<br />

Indicate All Counties to Benefit From Project:<br />

Charlotte Citrus Desoto Hardee Hernando Highlands Hillsborough Lake<br />

Levy Manatee Marion X Pasco Pinellas Sarasota Sumter Polk<br />

Project Description:<br />

This proposed multi-year FY2013 and FY2014 project is for the design and construction of 1,100 linear feet of 8-inch diameter<br />

reclaimed water transmission main and a pump station to supply Saddlebrook Golf Course with additional supply.<br />

The project will supply the Saddlebrook Golf Course with an additional 0.50 million gallons per day (mgd) of reclaimed water to<br />

offset 0.38 mgd of potable quality groundwater (current irrigation source deep wells and some reclaimed water). The estimated<br />

cost/benefit amortized at 8 percent over 30 years is $0.15 per thousand gallons offset.<br />

The total cost of the project is estimated to be $240,000. We requested $120,000 in FY2013 funding from the <strong>District</strong> for 50% of the<br />

funding. Our project schedule shows that only $30,000 of the share will be used in FY2013. Therefore, we are requesting the<br />

remaining share of $90,000 to be funded in FY2014.<br />

Currently the golf course utilizes the County's reclaimed water by filling a pond system with reclaimed water. However, the golf<br />

course is limited to the amount of reuse supply they can use due to the location of the pond system and the size of the booster<br />

pump. This project will allow the County to establish a larger supply and a larger booster pump station which will enable the golf<br />

course to increase their use of reclaimed water for irrigation purposes.<br />

Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection<br />

ordinances.<br />

Pasco County adopted Ordinance 01-08 requiring the following: one day/week irrigation restrictions for potable water; curtailed use<br />

of potable water for irrigation when rain has occurred within 24 hours; scheduled availability and restricted use of reclaimed water<br />

irrigation to distribute limited supply to as many customers as possible; washing of non-business, personal vehicles only using low<br />

volume methods and over non-impervious surfaces; prohibiting aesthetic uses of water unless such use also provides a necessary<br />

aeration or water quality benefit; and the use of reclaimed water for road construction activities when available. Enforcement of this<br />

ordinance is by designated County personnel and law enforcement officers. During <strong>Water</strong> Year 2012, 100% of Pasco County<br />

Utilities' wastewater was reused. The bulk rate charged for the use of reclaimed water is $0.47 per 1,000 gallons (normal rate),<br />

$0.21 per 1,000 gallons (surplus rate), and a flat rate of $10.26 per month residential irrigation. Pasco County's potable water rates<br />