The new recommended alternative includes complete replacement of most of the existing stormwater infrastructure in this drainage<br />

area and potential modification of the water quality BMP to include up to two additional baffle boxes. The additional baffle boxes are<br />

expected to provide increased pollutant removal effectiveness and a less frequent maintenance interval, when compared with the<br />

single baffle box alternative.<br />

Implementation of BMPs in this improvement area includes the following tasks: design, development of construction documents,<br />

construction permitting, bidding and contractor selection, construction of the BMPs and other improvements, and construction<br />

engineering and inspection.<br />

Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection<br />

ordinances.<br />

The City of Clearwater has an impressive track record of developing, implementing and enforcing water conservation measures.<br />

The City has met the requirements of the Northern <strong>Tampa</strong> <strong>Bay</strong> <strong>Water</strong> Use Caution Area stipulations included in its <strong>Water</strong> Use<br />

Permit. The 2010 <strong>Water</strong> Year compliance per capita water consumption for the City of Clearwater was 80 gpcd. This is well below<br />

the required 130 gpcd for Year 2001 required in the <strong>Water</strong> Use Caution Area regulations. The City has also implemented a<br />

consumptive use rate structure in October 2006 to ensure efficient use of reclaimed water which reduces the use of potable water<br />

for irrigation needs.<br />

Funding Source<br />

Prior Funding<br />

FY2013<br />

Budget<br />

FY2014<br />

Budget<br />

Future<br />

Funding<br />

Total Funding<br />

Applicant Share 550,000 1,000,000 1,550,000<br />

Pinellas Anclote 550,000 1,000,000 1,550,000<br />

Total 1,100,000 2,000,000 3,100,000<br />

Matching Fund Reduction<br />

Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />

Timelines<br />

Select Consultant 12/01/2012<br />

Design & Permitting Complete 12/01/2013<br />

Construction Commence 06/01/2014<br />

Construction Complete 10/01/2015<br />