Tampa Bay Region - Southwest Florida Water Management District
Tampa Bay Region - Southwest Florida Water Management District Tampa Bay Region - Southwest Florida Water Management District
Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. The Town has obtained a conservation easement to protect the seagrasses and mangroves in the project area. Funding Source Prior Funding FY2013 Budget FY2014 Budget Future Funding Total Funding Applicant Share 400,000 470,000 870,000 Pinellas Anclote 400,000 470,000 870,000 Total 800,000 940,000 1,740,000 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S. Timelines A - 10/1/2012 Milestone Projected Date Design and Permitting 07/31/2013 B - 08/1/2013 Milestone Projected Date Bidding - Construction 09/30/2013 C - 10/31/2013 Milestone Projected Date Construction 07/01/2014 38
Return to TOC SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2014 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name Stormwater Improvements - Flood Protection - Hillsborough County - Providence Road Project Number N436 Cooperator Hillsborough County BOCC Department Contact Person James Barrington Address 601 E. Kennedy Blvd, 20th Floo City Sate Zip Tampa, FL 33602 Phone # 813-307-4427 Email barringtonj@hillsboroughcounty.org Project Type: Water Supply X Water Quality X Flood Protection X Natural Systems Strategic Initiatives: X Water Quality Maintenance and Improvement Water Quality Monitoring Alternative Water Supply Conservation Reclaimed Water Regional Water Supply Planning X Emergency Flood Response X Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery X Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: Charlotte Citrus Desoto Hardee Hernando Highlands X Hillsborough Lake Levy Manatee Marion Pasco Pinellas Sarasota Sumter Polk Project Description: District has approved $500,000 for this project in FY13 Cooperative Fund distribution. The Alafia River watershed management master plan study was completed in 2001, updated 2010. Many projects were identified to alleviate flooding, enhance water quality, and protect the natural system. AR-4, Providence Road drainage improvement, is one of the projects to be implemented. In the Tributary N-11 drainage system, which drains Providence Road and Crescent Lake Drive, there are two flooding LOS deficiencies that were identified in the flooding conditions assessments. The modeling results indicate that 0.9 feet of water will inundate the intersection of Providence Road and Watson Road during the 25-year storm. This flooding problem is one of the most severe with respect to both flood depth and extent of inundation in the entire watershed, and was clearly evident during and after the Tropical Storm Gabrielle in September 2001. This intersection was inundated by > a foot of water, severe road, property and house flooding occurred downstream of this intersection all the way to the Alafia River. It was flooded during Hurricane Frances (2004) with 5 separate flooding complaint locations including; Watson Rd/Providence Rd intersection, Two other Providence Rd. locations, Cresent Lake Dr and Mathers Ln. The entire drainage system from the Watson Road intersection to the river needs improvements to alleviate flooding. Almost every driveway culvert in the Providence Road channel downstream of this intersection is crushed, buried or silted up. The problem is compounded by the extremely flat grade of the channel. A LOS deficiency was also identified at the cross drain under Crescent Lake Drive, which is part of the downstream drainage system. Further downstream is the Alafia Drive cross drain where both structures are unmaintained, aged and insufficient. Additionally, the channel downstream of the Alafia Drive crossing is undersized and needs to be widened to convey the higher flows resulting from removing the upstream constrictions in the drainage system. The alternative includes the replacement of all the undersized culverts within the Crescent Lake Drive/Providence Road conveyance system with 4’ x 8’ or 5’X8’ RCBCs and upgrade the creeks and ditches. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. Water Conservation: Hillsborough County was the premier local government to criminalize the violation of water use restrictions, and to adopt a civil citation process for the enforcement of the same in July 1993. A fulltime Water Conservation Manager assures 39
- Page 1: Fiscal Year 2014 Cooperative Fundin
- Page 4 and 5: N507 - Pasco County - Wesley Center
- Page 7 and 8: Return to TOC SOUTHWEST FLORIDA WAT
- Page 9 and 10: Return to TOC SOUTHWEST FLORIDA WAT
- Page 11 and 12: Return to TOC SOUTHWEST FLORIDA WAT
- Page 13 and 14: Return to TOC SOUTHWEST FLORIDA WAT
- Page 15 and 16: Return to TOC SOUTHWEST FLORIDA WAT
- Page 17 and 18: Return to TOC SOUTHWEST FLORIDA WAT
- Page 19 and 20: Return to TOC SOUTHWEST FLORIDA WAT
- Page 21 and 22: Return to TOC SOUTHWEST FLORIDA WAT
- Page 23 and 24: Return to TOC SOUTHWEST FLORIDA WAT
- Page 25 and 26: Return to TOC SOUTHWEST FLORIDA WAT
- Page 27 and 28: Return to TOC SOUTHWEST FLORIDA WAT
- Page 29 and 30: Return to TOC Project Name Project
- Page 31 and 32: Return to TOC SOUTHWEST FLORIDA WAT
- Page 33 and 34: Return to TOC SOUTHWEST FLORIDA WAT
- Page 35 and 36: Return to TOC Project Name Project
- Page 37 and 38: Return to TOC SOUTHWEST FLORIDA WAT
- Page 39 and 40: Return to TOC SOUTHWEST FLORIDA WAT
- Page 41 and 42: Return to TOC SOUTHWEST FLORIDA WAT
- Page 43: Return to TOC SOUTHWEST FLORIDA WAT
- Page 47 and 48: Return to TOC SOUTHWEST FLORIDA WAT
- Page 49 and 50: Return to TOC SOUTHWEST FLORIDA WAT
- Page 51 and 52: Return to TOC SOUTHWEST FLORIDA WAT
- Page 53 and 54: Return to TOC SOUTHWEST FLORIDA WAT
- Page 55 and 56: Return to TOC SOUTHWEST FLORIDA WAT
- Page 57 and 58: Return to TOC SOUTHWEST FLORIDA WAT
- Page 59 and 60: Return to TOC SOUTHWEST FLORIDA WAT
- Page 61 and 62: Return to TOC Project Name Project
- Page 63 and 64: Return to TOC Project Name Project
- Page 65 and 66: Return to TOC SOUTHWEST FLORIDA WAT
- Page 67 and 68: Return to TOC SOUTHWEST FLORIDA WAT
- Page 69 and 70: Return to TOC SOUTHWEST FLORIDA WAT
- Page 71 and 72: Return to TOC SOUTHWEST FLORIDA WAT
- Page 73 and 74: Return to TOC SOUTHWEST FLORIDA WAT
- Page 75 and 76: Return to TOC SOUTHWEST FLORIDA WAT
- Page 77 and 78: Return to TOC SOUTHWEST FLORIDA WAT
- Page 79 and 80: Return to TOC SOUTHWEST FLORIDA WAT
- Page 81 and 82: Return to TOC SOUTHWEST FLORIDA WAT
- Page 83 and 84: Return to TOC SOUTHWEST FLORIDA WAT
- Page 85 and 86: Return to TOC SOUTHWEST FLORIDA WAT
- Page 87 and 88: Return to TOC SOUTHWEST FLORIDA WAT
- Page 89 and 90: Return to TOC SOUTHWEST FLORIDA WAT
- Page 91 and 92: Return to TOC SOUTHWEST FLORIDA WAT
- Page 93 and 94: Return to TOC SOUTHWEST FLORIDA WAT
Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection<br />
ordinances.<br />
The Town has obtained a conservation easement to protect the seagrasses and mangroves in the project area.<br />
Funding Source<br />
Prior Funding<br />
FY2013<br />
Budget<br />
FY2014<br />
Budget<br />
Future<br />
Funding<br />
Total Funding<br />
Applicant Share 400,000 470,000 870,000<br />
Pinellas Anclote 400,000 470,000 870,000<br />
Total 800,000 940,000 1,740,000<br />
Matching Fund Reduction<br />
Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />
Timelines<br />
A - 10/1/2012<br />
Milestone<br />
Projected Date<br />
Design and Permitting 07/31/2013<br />
B - 08/1/2013<br />
Milestone<br />
Projected Date<br />
Bidding - Construction 09/30/2013<br />
C - 10/31/2013<br />
Milestone<br />
Projected Date<br />
Construction 07/01/2014<br />
38