eclaimed water distribution system as a condition of wastewater service when the development is within designated areas in the<br />

Reclaimed <strong>Water</strong> Master Plan and when providing the development with reclaimed water supply is determined in the best interest<br />

of the County. Pasco County participates in the National Flood Insurance Program, administered through FEMA. All finished floor<br />

elevations are required to be above the 100-year flood elevation. These elevations are reviewed prior to construction and certified<br />

after construction. Fill Ordinance, adopted 3/05, requires permit applications and review for placement of fill greater than 5 CY on<br />

properties.<br />

Funding Source<br />

Prior Funding<br />

FY2013<br />

Budget<br />

FY2014<br />

Budget<br />

Future<br />

Funding<br />

Total Funding<br />

Applicant Share 50,000 50,000 100,000<br />

Coastal Rivers 50,000 50,000 100,000<br />

Total 100,000 100,000 200,000<br />

Matching Fund Reduction<br />

Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />

Timelines<br />

June 15, 2014<br />

Milestone<br />

Projected Date<br />

Construction Complete 06/15/2014<br />

November 1, 2012<br />

Milestone<br />

Projected Date<br />

Design Start 11/01/2012<br />

September 1, 2013<br />

Milestone<br />

Projected Date<br />

Construction Start 09/01/2013<br />

September 30, 2014<br />

Milestone<br />

Projected Date<br />

Project Closeout 09/30/2014<br />

34