07.09.2014 Views

Tampa Bay Region - Southwest Florida Water Management District

Tampa Bay Region - Southwest Florida Water Management District

Tampa Bay Region - Southwest Florida Water Management District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The Pinellas Park <strong>Water</strong> <strong>Management</strong> <strong>District</strong> (PPWMD) was formed in 1976 and is a special district within Pinellas County that<br />

manages an approximate 15-square mile jurisdictional area. The PPWMD is divided into 5 subbasins (Channel Basins 1, 2, 3, 4,<br />

and 5). The primary stormwater conveyance systems in the watersheds are channelized ditches with various lining material. While<br />

the PPWMD is unable to create flood protection ordinances, the primary goal of the PPWMD is to improve and maintain the<br />

stormwater management system to contain the 25-year, 24-hour storm event within channel banks and to limit flooding during the<br />

100-year, 24-hour storm event to the streets and yards where possible.<br />

A recent effort was untaken by the PPWMD in conjunction with the City of Pinellas Park in which revisions were made and<br />

accepted by the Federal Emergency <strong>Management</strong> Agency for the Flood Insurance Rate Maps of Channels 1, 2, 3 and 4.<br />

Additionally, the PPWMD employs staff and owns specialized equipment that are dedicated to maintaining the channels within the<br />

PPWMD boundary.<br />

Funding Source<br />

Prior Funding<br />

FY2013<br />

Budget<br />

FY2014<br />

Budget<br />

Future<br />

Funding<br />

Total Funding<br />

Applicant Share 225,000 225,000<br />

Pinellas Anclote 225,000 225,000<br />

Total 450,000 450,000<br />

Matching Fund Reduction<br />

Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />

Timelines<br />

Channel 2 Pond Renewal<br />

Milestone<br />

Projected Date<br />

Final Design and Permitting Kickoff 10/01/2013<br />

Design and Permitting Complete 02/01/2014<br />

Advertise, Receive Bids and Award Contract Complete 03/15/2014<br />

Construction Complete 09/30/2014<br />

140

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!