07.09.2014 Views

Tampa Bay Region - Southwest Florida Water Management District

Tampa Bay Region - Southwest Florida Water Management District

Tampa Bay Region - Southwest Florida Water Management District

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ordinance is by designated County personnel and law enforcement officers. During <strong>Water</strong> Year 2012, 100% of Pasco County<br />

Utilities' wastewater was reused. The bulk rate charged for the use of reclaimed water is $0.47 per 1,000 gallons (normal rate),<br />

$0.21 per 1,000 gallons (surplus rate), and a flat rate of $10.26 per month residential irrigation. Pasco County's potable water rates<br />

are applied in a water conservation inclining block rate. County Ordinance 93-16 requires each new development to construct a<br />

reclaimed water distribution system as a condition of wastewater service when the development is within designated areas in the<br />

Reclaimed <strong>Water</strong> Master Plan and when providing the development with reclaimed water supply is determined in the best interest<br />

of the County. Pasco County participates in the National Flood Insurance Program, administered through FEMA. All finished floor<br />

elevations are required to be above the 100-year flood elevation. These elevations are reviewed prior to construction and certified<br />

after construction. Fill Ordinance, adopted 3/05, requires permit applications and review for placement of fill greater than 5 CY on<br />

properties.<br />

Funding Source<br />

Prior Funding<br />

FY2013<br />

Budget<br />

FY2014<br />

Budget<br />

Future<br />

Funding<br />

Total Funding<br />

Applicant Share 633,300 633,300<br />

Coastal Rivers 633,300 633,300<br />

Total 1,266,600 1,266,600<br />

Matching Fund Reduction<br />

Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />

Timelines<br />

1/1/2014<br />

Milestone<br />

Projected Date<br />

Bid Phase 01/01/2014<br />

10/1/2013<br />

Milestone<br />

Projected Date<br />

Design start 10/01/2013<br />

2/15/14<br />

Milestone<br />

Projected Date<br />

Construction start 02/15/2014<br />

9/15/14<br />

Milestone<br />

Projected Date<br />

Project closeout 09/15/2014<br />