ordinance is by designated County personnel and law enforcement officers. During <strong>Water</strong> Year 2007, 100% of Pasco County<br />

Utilities¿ wastewater was reused. The bulk rate charged for the use of reclaimed water is $0.72 per 1,000 gallons, and a flat rate of<br />

$14.82 per month (without meter) and $7.14 per month plus $0.32 per 1,000 gallons (with meter) per ERU for residential irrigation.<br />

Pasco County¿s potable water rates are applied in a water conservation inclining block rate. County Ordinance 93-16 requires<br />

each new development to construct a reclaimed water distribution system as a condition of wastewater service when the<br />

development is within designated areas in the Reclaimed <strong>Water</strong> Master Plan and when providing the development with reclaimed<br />

water supply is determined in the best interest of the County. Pasco County participates in the National Flood Insurance Program,<br />

administered through the FEMA. All finished floor elevations are required to be above the 100-year flood elevation. These<br />

elevations are reviewed prior to construction and certified after construction. Fill Ordinance, adopted 3/05, requires permit<br />

applications and review for placement of fill greater than 5 CY on properties.<br />

Funding Source<br />

Prior Funding<br />

FY2013<br />

Budget<br />

FY2014<br />

Budget<br />

Future<br />

Funding<br />

Total Funding<br />

Applicant Share 2,500,000 2,500,000 5,000,000<br />

Pinellas Anclote 2,500,000 2,500,000 5,000,000<br />

Total 5,000,000 5,000,000 10,000,000<br />

Matching Fund Reduction<br />

Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />

Timelines<br />

Place construction contract out to bid 10/01/2014<br />