Figure 8.10: The water velocity in the inlet chamber for northern treatment line of the WSP system<br />

9-10 January 2010. No rainfall occurred during the measurements 9-10 January 2010.<br />

Influent water flow<br />

Figure 8.11: The inlet waste water flow to the WSP system. The designed flow is made to fill the gap<br />

between the measurements during 5-6 Nov.<br />

* On the 5-6 of November <strong>and</strong> 9-10 of January, the total flow is assumed to be twice the flow in<br />

one inlet, since there are two inlets with equal amounts of water.<br />

* On the 18-19 of November, there was only one line <strong>and</strong> one chamber in use. However, some<br />

leakage to the closed line occurred except at the last measurement at 10 a.m., when workers<br />

managed to stop the leakage. The leakage was measured to 9 l/s <strong>and</strong> is considered when<br />

calculating the flow from 18-19 November.<br />