Chapter 1 - Pacific Communications
Chapter 1 - Pacific Communications
Chapter 1 - Pacific Communications
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
User’s Manual<br />
Managing Schedule<br />
Adding a New Schedule<br />
• Adding a new schedule with a different time range: Clicking the button in the upper left corner<br />
of the Time Coverage schedule window allows you to add a new schedule with a different time coverage.<br />
• Adding a new schedule with the same time range: Clicking the button in the upper left corner<br />
of the Condition schedule window allows you to add a new schedule with the same time coverage.<br />
• Adding a new schedule with the same time range and target: Clicking the button in the upper left<br />
corner of the Action schedule window allows you to add a new schedule with the same time range and target.<br />
Deleting a Schedule<br />
Clicking the<br />
button in the upper right corner of any schedule window deletes the schedule.<br />
Changing Schedule Position<br />
Clicking the or button in the upper left corner of each schedule window changes the position of the<br />
schedules. There is no priority between schedules and all schedules will be performed.<br />
122