3 Background information Albania<br />

Table 3.1: Overview over wastewater treatment plants in Albania<br />

Town<br />

Supported Cost Population<br />

by 1) (PE)<br />

Specific<br />

costs (€/PE)<br />

Status Technology Additional information (from K.R., B.D. and K.S.)<br />

1 Kavajë I KfW<br />

€ 5.0 Mio. 25,000 200 €/PE<br />

In operation<br />

Automatic grit + Anaerobic<br />

pond + Trickling filter and<br />

Secondary clarifier +<br />

Chlorination + Sludge<br />

thickener and CWH<br />

Constructed plant is a trickling filter that is in use<br />

and is working. (K.S.)<br />

2 Kavajë II<br />

(Golem)<br />

IPA<br />

€ 10.0 Mio.<br />

(€ 5.0 Mio.)<br />

75,000<br />

(25,000)<br />

133 €/PE<br />

(200 €/PE)<br />

Final design<br />

Automatic grit + Anaerobic<br />

pond + Trickling filter and<br />

Secondary clarifier +<br />

Chlorination + Sludge<br />

thickener and CWH<br />

3 Durrës BB/LUX/<br />

EIB (IPA)<br />

€ 11.1 Mio.<br />

(€ 10.5<br />

Mio.)<br />

250,000 45 €/PE<br />

(42 €/PE)<br />

Construction Mechanical and automatic<br />

grit + Sand removal +<br />

Anoxia zone, aeration basin<br />

and secondary clarifier +<br />

CHWs, Clorination and<br />

Ozon + Thickener and<br />

anaerobic digester<br />

Treatment plant was constructed more than two<br />

years ago but is not in use. The reason is that a<br />

connection to the sewer system is missing (B.D.).<br />

According to Karlheinz Stransky, the plant starts<br />

already to show damages of the materials (e.g.<br />

scraper not made out of high quality steel). (K.S.)<br />

4 Lezhë-<br />

Shëngjin<br />

BB/LUX/<br />

EIB (IPA)<br />

€ 4.9 Mio<br />

(€ 3.7 Mio)<br />

50,000<br />

(51,000)<br />

98 €/PE<br />

(73 €/PE)<br />

construction<br />

Mechanical and automatic<br />

grit + Sand removal +<br />

Oxidation ditch and CHW +<br />

Chlorination + Thickener<br />

and CWH sludge<br />

Information is not consistent. According to Bledar<br />

Dollaku, the treatment plant in Leizhë has six<br />

pumping stations to get the wastewater to the<br />

treatment plant. The city is not using it because of<br />

the electricity bill that they would have to pay for<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!